Objective:
Your Black Belts developed the following data and created this control chart for sandwich preparation times.
They say that the process is stable and shows that the average prep time is 1.7512 minutes and that
individual prep times will not exceed 1.9205 minutes. They also say that it's very good because it shows very little variation.
Instructions for you:
Part I
Do you agree with their interpretation? (see chart below) HINT: Use the 11 Shewhart Rules for Stability as the basis for your decision.
Data:
Current Sandwich Prep
Times (in minutes)
1.6434
1.8623
1.7611
1.7049
1.7888
1.7469
1.8223
1.7793
1.7122
1.7562
1.6798
1.7013
1.7750
1.7400
1.8122
1.7778
1.7233
1.7410
1.7143
1.7807
19
Part II
You and your team work to eliminate all known assignable causes from this process. You think you have
accomplished this and collect the following data on the new process. Calculate the control chart center line
and control limit values for an I-MR chart and use the 11 Shewhart Rules for Stability to determine if this process is now stable.
Revised Process Prep
Times (in minutes)
1.5364
1.5892
1.4823
1.5610
1.5468
1.5021
1.5065
1.5002
1.5501
1.5423
1.4322
1.5732
1.5923
1.5567
1.5022
1.5345
1.4822
1.4922
1.6004
1.5178
AboveWay Sandwich, Inc. Customer Satisfaction Improvement
Deliverable: Control Chart
Student last name:
If "NO", please identify BY NAME which of the 11 Shewhart Tests for Stability EACH chart fails. I CHART:
Natural Pattern (stratefied) Only 25% outside of 1 SD Band Repeating pattern (4 up, 4 down, 4 up)
MR CHART:
Outlier: Moving range has one point out of Upper Control Limit Fails Natural Pattern Test (stratefied): Less than 1/3 outside of SD Band Repeat Pattern: 1 up 1 down 1 up 1 down
INDIVIDUALS CHART:
What did you get for a center line? 1.5300
What did you get for an upper control limit? 1.6716
What did you get for a lower control limit? 1.3885
MOVING RANGE CHART:
What did you get for a center line? 0.0532
What did you get for an upper control limit? 0.1739
What did you get for a lower control limit? 0.0000
If "NO", please identify BY NAME which of the 11 Shewhart Tests for Stability EACH chart fails. I CHART:
Natural Pattern (Borderline Stratified) Only 30% outside of 1 SD Band
MR CHART:
Natural Pattern Only 55% inside 1 SD Band

Process Capability (2)

Objective:
Determine process capability
Instructions for you:
The company's goal is that every sandwich can be completed in less than 1.5 minutes. Based on the data
from the revised process control chart study, evaluate our shop's ability to meet this goal using the following
Evaluate our shop's ability to meet this goal using the following cabability measures.
Cp
Cpk
Pp
Ppk
z score
Sigma Level
% of sandwiches made within the 1.5 minute goal
PPM beyond the 1.5 minute goal
Data: See the revised data from the control chart tab.
AboveWay Sandwich, Inc. Customer Satisfaction Improvement
Deliverable: Process Capability
Student last name: Your last name here
What did you get for Cp? Type here Self check
daniel-munson: Instructor: Hint: If you got a value, I would like to see it.
What did you get for Cpk? Type here (use 2 decimal places) Self check
daniel-munson: Instructor: You should get a value between -2 and +2
What, specifically, does this particular Cpk tell you about the process that other Cpk's may not? Type here (use at most 25 words)
What did you get for Pp? Type here Self check
daniel-munson: Instructor: Hint: If you got a value, I would like to see it.
What did you get for Ppk? Type here (use 2 decimal places) Self check
daniel-munson: Instructor: You should get a value between -3 and +3
What did you get for Z-score? Type here (use 2 decimal places) Self check
daniel-munson: Instructor: You should get a value between -2 to +2
What does this Z-score mean? HINT: Use the z score you calculated in a sentence that explains what it tells you about this process. Type here (use at most 25 words)
Using the z score calculated above and a z table, estimate the % of sandwiches that will be made within the 1.5 minute goal. Type here (use 2 decimal places) Self check
daniel-munson: Instructor: You should get a value <30%
PPM (aka DPMO) beyond the 1.5 minute goal Type here Self check
daniel-munson: Instructor: You should have gotten a really big number. Also, this number should be "consistent" with the % within goal found above.

191715131197531

1.9

1.8

1.7

1.6

Observation

I

n

d

i

v

i

d

u

a

l

V

a

l

u

e

_

X=1.7512

+3SL=1.9205

-3SL=1.5818

+2SL=1.8640

-2SL=1.6383

+1SL=1.8076

-1SL=1.6947

191715131197531

0.20

0.15

0.10

0.05

0.00

Observation

M

o

v

i

n

g

R

a

n

g

e

__

MR=0.0637

+3SL=0.2080

-3SL=0

+2SL=0.1599

-2SL=0

+1SL=0.1118

-1SL=0.0156

I-MR Chart for Current Sandwich Prep Times