Risk Management
V 2.0
Project Scope Statement
|
Project Name |
The Flying Aces |
Project Number |
|
|
Project Manager |
Prioritization |
|
|
|
Owner(s) |
|
Statement of Work—Project Description andProject Product |
Sacred grounds is a internet café, that brings the idea of world ethics, healthy living, and sustainability to local business. Sacred grounds will offer beverages and confectionary confectionery, as well as an internet café. There will be live music, poetry, comedy, entertainment, and art work from around the world for sale. The products are simple and changed based on availability and ethics. The coffee/tea house will be using recycled cups, coffee from emerging markets and local markets as well. The coffee house will offer coffee, tea, and smoothies. There will be a need for Carpenters, Plumbers, Drywallers, Electricians, Painters, Masonry, Interior Designers, Security System Instillation. |
|
|
|
Project Deliverables |
There will be a need for wood for the $35-$95 hour, Storey Construction, LLC, will be remodeling the restaurant into two different rooms. Plumbers (Brittain Plumbing) will need to modify the plumbing (5128691331). M D Construction will be dry walling, S&M Electric for the electrician work and installation of the internet, L.O.C. Maintenance and Construction, (could also include the construction. ). C.. Oats Masonry, Inc. for granite work, etc. |
|
|
|
||
|
Project Objectives |
The rental is $17 square Foot Annually. There are 6800 square feet. University Commons 603 West University Drive, Georgetown, TX, 78626. The building is 2 minutes away from Southwestern University. Storey construction $95 hourly, How is this the objective of the project, more like a need. |
|
|
Project Assumptions |
University students will always need a place to go when studying; and people from the community, need a place to relax, enjoy a great cup of coffee, and different forms of entertainment. |
|
|
Project Constraints |
The biggest constraint is that rentals with 4000 square feet or more are rarely available. |
|
|
Exclusions |
The Coffee/Tea house needs to be near a university. The What are the boundaries of the project? What is to be included and what is to be excluded from the project? |
|
|
Acceptance Criteria |
The Sacred grounds must be able to appeal to every age, ethnic and local economic background. It will offer the community high speed and affordable easy internet access in an innovative and environmentally stunning environment for enjoying quality beverages and confectionary confectionery items. Consumers can drink with confidence knowing every sip is sustainable and ethnic and that each ounce consumed gives back to society. The sacred ground prides itself on providing quality for those with a responsibly, drink wholy wholly, and drink consciously. The goal is to provide worldwide communication, education, and cultural enrichment in a social entertaining atmosphere that embraces environmental protection, economic development, and social equity.The regulations must meet those that are required by the state and the county for contractors. The owner will need to purchase the rest. |
|
|
|
||
|
|
||
|
APPROVALS |
||
Type Name |
Signature |
Date |
|
Project Manager Approval:
|
|
|
|
Customer/Sponsor Approval:
|
|
|
|
ategory |
Points |
% |
Description |
|
Content |
35/40 |
90% |
Full points are granted for content that demonstrates full understanding of the technical requirements for the deliverable.Some of your areas need work, project objectives, technical requirements. Information does not appear to support the criteria it is listed under. |
|
Documentation and Formatting |
5/10 |
10% |
The deliverables should be formatted as a business document correctly and should use APA formatting for cited sources. Spelling and grammar must be accurate.Where is your cover page? Submission need to be proofread before submitting to the dropbox. |
|
Total |
50 |
100% |
A quality paper will meet or exceed all of the above requirements. |