P14

Grafton Metalworks Company
Ore Metal (%) Impurities Cost/Ton
A B C D
1 0.19 0.15 0.12 0.14 0.4 27
2 0.43 0.1 0.25 0.07 0.15 25
3 0.17 0 0 0.53 0.3 32
4 0.2 0.12 0 0.18 0.5 22
5 0 0.24 0.1 0.31 0.35 20
6 0.12 0.18 0.16 0.25 0.29 24
Composition constraints A >= 0.21
B <= 0.12
C <= 0.07
D >= 0.3
D <= 0.65
Impurity constraint Metal = 1
Ore
Decision variables
1
2
3
4
5
6
Objective function Minimize Cost ($)

P19

congressman’s district
Program Votes/ Dollar
Job training 0.02
Parks 0.09
Sanitation 0.06
Mobile library 0.04
Constraints Job training <= 1600000
Parks <= 1600000
Sanitation <= 1600000
Mobile library <= 1600000
Parks <=
Job training >=
spending = 4000000
Decision Variables Job training
Parks
Sanitation
Mobile library
Objective Maximize Votes

P20

Anna Broderick Lunch Menu
Calories Iron Protein Carbo-hydrates Fat (g/lb.) Chol-esterol Cost
(per lb.) (mg/lb.) (g/lb.) (g/lb.) (mg/lb.)
$/lb.
Chicken 520 4.4 17 0 30 180 0.8
Fish 500 3.3 85 0 5 90 3.7
Ground beef 860 0.3 82 0 75 350 2.3
Dried beans 600 3.4 10 30 3 0 0.9
Lettuce 50 0.5 6 0 0 0 0.75
Potatoes 460 2.2 10 70 0 0 0.4
Milk (2%) 240 0.2 16 22 10 20 0.83
Constraints >= >= >= >= >= <=
1500 5 30 40 20 30
<= <=
2000 60
Decision Variables Chicken <= 0.5
Fish <= 0.5
Ground beef <= 0.5
Dried beans <= 0.5
Lettuce <= 0.5
Potatoes <= 0.5
Milk (2%)
Objective Minimize Cost ($)
a.      If a serving of each of the food items (other than milk) was limited to no more than a half pound, what effect would this have on the solution?
Answer:

P22

Cabin Creek Coal (CCC)
Plant
Mine 1 2 3 4 Constraints Mine Capacity (tons)
1 $69 $71 $72 $74 <= 220
2 66 74 75 79 <= 170
3 86 89 80 82 <= 280
Constraints
= = = =
Demand (tons) 110 160 90 180
Mine % Ash % Sulfur Plant 1 2 3 4
1 0.09 0.06 Constraints
2 0.05 0.04 <= <=
3 0.04 0.03 Ash 6 5
Constraints
<= <=
Sulfur 5 7
Mine to Plant Constraints
DV x11 <= <=
x12 Ash + Sulfur 5 6
x13
x14
x21
x22
x23
x24
x31
x32
x33
x34
Objective function Minimize Cost

P36

Joe Henderson Assignments
1, 2 Operator Drill Press (min) Lathe (min) Grinder (min)
1 22 18 35
2 41 30 28
3 25 36 18
DV Operator Drill Press Lathe Grinder Operator Constraints Assignment
1 = 1
2 = 1
3 = 1
Machine Constraints
= = = Note: Constraints = Integer
1 1 1
Objective Minimize Time
3 Operator Drill Press (min) Lathe (min) Grinder (min)
1 22 18 35
2 41 30 28
3 25 36 18
4 20 20 20
DV Operator Drill Press Lathe Grinder Operator Constraints Assignment
1 0 1 0 <= 1
2 0 0 0 <= 1
3 0 0 1 <= 1
4 1 0 0 <= 1
Machine Constraints
= = = Note: Constraints = Integer
1 1 1
Objective Minimize Time
Answer Should Joe hire Fred's wihe? (Yes / No)

P43

Cash and Carry Building Supply Company
Length Order (quantity)
7 ft. 700
9 ft. 1,200
10 ft. 300
What are possible patterns the standard board can be cut?
Possible cut patterns
#1 #2 #3 #4 #5 #6 Constraints Order (quantity)
7 3 2 2 1 0 0 = 700
9 0 0 1 2 1 0 = 1,200
10 0 1 0 0 1 2 = 300
Total length 21 24 23 25 19 20
<= <= <= <= <= <=
25 25 25 25 25 25
Decision Variables
Objective Minimize standard boards
What are possible patterns the standard board can be cut?
Possible cut patterns
#1 #2 #3 #4 #5 #6 Constraints Order (quantity)
7 3 2 2 1 0 0 >= 700
9 0 0 1 2 1 0 >= 1,200
10 0 1 0 0 1 2 >= 300
Total length 21 24 23 25 19 20
Trim Loss 4 1 2 0 6 5
Decision Variables
Objective Minimize standard boards

1

2

3

4

5

6

7

A

B

C

Cash and Carry Building Supply Company

Length

7 ft.

9 ft.

10 ft.