operations 6&7

profilewmashles88
ch9hmwkdata.xlsx

C9-2

Problem 2
Boards/Day
Actual Output 950
Effective Capacity 700
Design Capacity 1000
UtilizationEffective
UtilizationDesign

C9-8

Problem 8
EV is a weighted avg of the chance events
EVsmallexpansion =(0.3*40000)+(0.7*50000)
EVlargeexpansion =(0.3*50000)+(0.7*80000)

C9-10

Problem 10
Create diagram using TreePlan (Excel Addin)
EVsmallexpansion =(0.3*50000)+(0.7*90000)
EVlargeexpansion =(0.3*70000)+(0.7*100000)

C9-12

Problem 12
Factor Score Weighted Score
Factor Factor Weight Location 1 Location 2 Location 1 Location 2
Proximity to airport 40 5 3
Proximity to road access 30 4 1
Proximity to labor source 10 3 5
Size of facility 20 2 4

C9-14

Problem 14
Factor Score Weighted Score
Factor Factor Weight Location 1 Location 2 Location 1 Location 2
Proximity to customer 30 5 2
Proximity to competition 10 4 2
Proximity to labor supply 30 2 5
Transportation system 20 5 3
Quality of life 10 3 5

C9-16

Problem 16
Town X Y Load lixi liyi
A 4 18 15
B 12 2 10
C 10 8 12
D 8 15 8
Xc.g.
Yc.g.

C9-18

Problem 18
Location Fixed Costs Variable Costs/Unit Total Variable Costs Total Costs
A $ 85,000 $ 2
B $ 49,000 $ 7
C $ 35,000 $ 10
D $ 65,000 $ 6
Quantity 3000