| Project Summary Sheet - Level | I | Estimate | Page 1 of 1 | ||||
| Project No. | 2013-09-04 | CIBOLO CANYON UNIT 6 SUBDIVISION | |||||
| District | 2 | ||||||
| Project Manager | TEAM 6 | ||||||
| Capital Project Officer | J. STRYBOS | ||||||
| Funding Information | Cost Information | ||||||
| Fund Year | Amount | Category | Cost | ||||
| GO bonds 2013 | 5,637,229 | Construction | 3,225,042 | ||||
| - | Design | 328,781 | |||||
| - | Real Estate | - | |||||
| - | Environmental | 23,109 | |||||
| Water | $1,067,942 | ||||||
| Sanitary Sewer | $992,356 | ||||||
| - | Miscellaneous | - | |||||
| Total Funding | $ 5,637,229 | Total Cost | $ 5,637,229 | ||||
| Project Description | |||||||
| This project consists of constructing a new drainage system in CIBOLO CANYON UNIT 6 Subdivison. The storm sewer will be designed to handle a 10-year storm event. It includes the construction of approximately 3,645 linear feet of streets with curb, gutter, sidewalks and driveways. A new sanitary sewer and water line system will also be constructed. | |||||||
| Project Type: | Streets, drainage, Sanitary Sewer and Water lines | ||||||
| Project Status: | Construction documents 95% complete | ||||||
| Consultant: | Team 1 | ||||||
PAGE &P OF &N &D J. STRYBOS CE 4313
Data
| CIBOLO CANYON UNIT 6 SUBDIVISION PROJECT DATA SHEET | |||||||
| PROJECT NUMBER: | 2013-06-05 | DISTRICT: | ESTIMATE LEVEL: | II | |||
| 1-10 or 11 for city-wide | I or II | ||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | ||||||
| PROJECT LIMITS: | All streets in CIBOLO CANYON UNIT 6 Subdivision. | ||||||
| Firm Developing: | TEAM 6 | PROJECT TYPE: | STREET AND DRAINAGE | Street, Drainage, Traffic, Architecture | |||
| Person Developing: | J. STRYBOS | ||||||
| Date Developed: | 9/4/13 | STREET TYPE: | Local A | ||||
| Local A | Collector | ||||||
| APPROXIMATE SCHEDULE | Local A with bus | Secondary Arterial | |||||
| For Level II estimate only. | Local B | Primary Arterial | |||||
| Include city processing and review time | |||||||
| NTP Date | Sep-13 | ROW WIDTH DATA | |||||
| Design | 18 | months | Required ROW: | 50 | ft | ||
| ROW acquisition | 3 | months | Existing ROW: | 50 | ft | ||
| Utility relocation | 6 | months | Is ROW acquisition required? yes or no | no | |||
| Letting Date | Mar-15 | If yes, fill out real estate costs on page 5 of 6 | |||||
| Construction | 18 | months | |||||
| PROJECT CONCEPT - SCOPE - ESTIMATING ASSUMPTIONS UTILIZED: | |||||||
| This project consists of constructing a new drainage system in CIBOLO CANYON UNIT 6 Subdivion. The storm sewer will be designed to handle a 10-year storm event. It includes the construction of approximately 3,645 linear feet of streets with curb, gutter, sidewalks and driveways. A new sanitary sewer and water line system will also be constructed. | |||||||
| STREET DATA: | |||||||
| Street Length (LF) | Street width (LF) | Sidewalk width (LF) | ATB* Thickness (IN) | ||||
| Ladera Ranch | 807 | 28 | 4 | 10.5 | |||
| Las Casitas | 610 | 28 | 4 | 10.5 | |||
| Verrado | 610 | 28 | 4 | 10.5 | |||
| Asoleado | 392 | 28 | 4 | 10.5 | |||
| Cielo Grande | 200 | 40 | 4 | 10.5 | |||
| La Tapiceria | 1,197 | 28 | 4 | 10.5 | |||
| 0 | 0 | 0 | 0 | ||||
| 0 | 0 | 0 | 0 | ||||
| 0 | 0 | 0 | 0 | ||||
| 0 | 0 | 0 | 0 | ||||
| 0 | 0 | 0 | 0 | ||||
| *Asphalt Treated Base thickness may be 5, 6, 7, 8 or 10 inches thick | |||||||
| HOW MANY LINES OF CURB TO BE REMOVED? | E.A. | 2 | |||||
| TOTAL SIDEWALKS & DRIVEWAYS TO BE REMOVED. | S.F. | 10,000 | |||||
| Other Unique Project Street Costs | |||||||
| Description 1 | $0 | ||||||
| Description 2 | $0 | ||||||
| Description 3 | $0 | ||||||
| TRAFFIC DATA: | |||||||
| Qty | |||||||
| New Traffic Signals Required - Street sections 44' or less | 0 | ||||||
| New Traffic Signals Required - Street sections over 44' | 0 | ||||||
| Traffic Signals requiring Adjustment | 0 | ||||||
| DRAINAGE DATA: | |||||||
| Is underground drainage required? | yes | Basis for Level I Estimated Cost: | |||||
| Is adequate outfall existing? | yes | ||||||
| Level I Estimate cost of drainage: | |||||||
| Will project change the flood plain? | no | ||||||
| FEMA map cost | $0 | ||||||
| Required utility relocations: yes or no | Sewer | yes | Electric | yes | Other | none | |
| Water | yes | Cable | yes | ||||
| Phone | yes | Gas | yes | ||||
| Note unique utility relocation problems or costs: | none noted | ||||||
| ENVIRONMENTAL DATA: | OVERALL CONSULTANT RECOMMENDATION: | ||||||
| To determine the number of potential environmental concerns, identify all current/former gas stations, dry cleaning facilities, industrial facilities, landfills, auto junkyards, auto repair shops, etc. adjacent to the project site. Presuming these sites impact the project site, it is recommended that three soil borings be conducted for each site to explore potential impacts to subsurface soils and/or groundwater. | high | critical, high, medium, low, or no | |||||
| Rationale: | |||||||
| Appears many homes flood repeatedly due to undersized underground drainage system | |||||||
| For Level II, estimate remediation costs on page 3 of 6 | |||||||
| No. of potential polluters (Level I): | 0 | ||||||
| - DESIGN ENHANCEMENTS | $0 | Use zero unless city has designated this project for design enhancement | |||||
PAGE &P OF &N &D J. STRYBOS CE 4313
Summary
| CIBOLO CANYON UNIT 6 Subdivision PROJECT ESTIMATE SUMMARY FORM | ||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | |||
| PROJECT LIMITS : | All streets in CIBOLO CANYON UNIT 6 Subdivision. | |||
| PROJECT NO: | 2013-06-05 | |||
| DATE: | 9/4/13 | |||
| CONSTRUCTION COSTS | ||||
| - STREET COST | $1,411,686.99 | |||
| - DRAINAGE COST | 592,016 | |||
| - TRAFFIC COST | 12,511 | |||
| - TREE PRESERVATION (1/2%) | 10,081 | |||
| - DESIGN ENHANCEMENTS | - | |||
| - BARRICADES (3%) | 60,789 | |||
| - BOND AND INSURANCE (3%) | 62,613 | |||
| - MOBILIZATION & PREPARATION OF R.O.W. (11% + 4%) | 313,063 | Engineer Fee based on Construction Cost: | ||
| TOTAL CONSTRUCTION COST ESTIMATE | $ 2,462,759 | FALSE | 0 | |
| FALSE | 0 | |||
| CONSTRUCTION CONTINGENCY (10%) | 246,276 | FALSE | 0 | |
| MATERIAL TESTING (2%) | 49,255 | FALSE | 0 | |
| ENGINEER FEE | 255,634 | FALSE | 0 | |
| ENGINEER CONTINGENCY (10%) | 25,563 | FALSE | 0 | |
| RIGHT-OF-WAY (LAND ACQUISITION) | - | FALSE | 0 | |
| RIGHT-OF-WAY SURVEY | - | TRUE | 213028.616353479 | |
| ENVIRONMENTAL | 19,764 | FALSE | 0 | |
| FEMA FLOOD PLAIN STUDY | - | FALSE | 0 | |
| PROJECT ADMIN. (7%) | 214,148 | FALSE | 0 | |
| INFLATION FACTOR - LEVEL I (3% per year for three years) | 303,532 | Consultant adjust for Level II inflation factor if different | ||
| TOTAL PROJECT COST ESTIMATE | $ 3,576,932 | |||
&8Aug 2002 UP &8&D
&8Aug 2002 UP &8&D
&8Aug 2002 UP JOHN STRYBOS &8&D
&8&P of &N
&8&P of &N
&8Estimate Sheet 1 of 6
Street
| CIBOLO CANYON UNIT 6 Subdivision PRELIMINARY STREET RECONSTRUCTION COST ESTIMATE | |||||||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | ||||||||||
| PROJECT LIMITS : | All streets in CIBOLO CANYON UNIT 6 Subdivision. | ||||||||||
| PROJECT NO: | 2014-04-09 | ESTIMATE LEVEL | II | DATE: | 4/9/14 | ||||||
| For Level II Estimate, consultant refine list of items and unit quantities as appropriate, and adjust percentage of misc street cost. | |||||||||||
| New Street Sections | Sidewalk Area SY | Street Length (LF) | Street SF | Street width (LF) | Street excavation SF | Sidewalk width (LF) | ATB Thickness (IN) | SY type B | |||
| Ladera Ranch | 717.33 | 807.00 | 22,596.00 | 28 | 25,420.50 | 4 | 10.5 | TRUE | 2,510.67 | ||
| Las Casitas | 542.22 | 610.00 | 17,080.00 | 28 | 19,215.00 | 4 | 10.5 | TRUE | 1,897.78 | ||
| Verrado | 542.22 | 610.00 | 17,080.00 | 28 | 19,215.00 | 4 | 10.5 | TRUE | 1,897.78 | ||
| Asoleado | 348.44 | 392.00 | 10,976.00 | 28 | 12,348.00 | 4 | 10.5 | TRUE | 1,219.56 | ||
| Cielo Grande | 177.78 | 200.00 | 8,000.00 | 40 | 8,700.00 | 4 | 10.5 | TRUE | 888.89 | ||
| La Tapiceria | 1,064.00 | 1,197.00 | 33,516.00 | 28 | 37,705.50 | 4 | 10.5 | TRUE | 3,724.00 | ||
| 0.00 | 0 | 0 | 0 | 0 | 0 | 0 | FALSE | 0.00 | |||
| 0.00 | 0 | 0 | 0 | 0 | 0 | 0 | FALSE | 0.00 | |||
| 0.00 | 0 | 0 | 0 | 0 | 0 | 0 | FALSE | 0.00 | |||
| 0.00 | 0 | 0 | 0 | 0 | 0 | 0 | FALSE | 0.00 | |||
| 0.00 | 0 | 0 | 0 | 0 | 0 | 0 | FALSE | 0.00 | |||
| TOTAL NEW STREET LENGTH | 3,392.00 | 3,816.00 | 109,248.00 | 122,604.00 | 12,138.67 | ||||||
| LINES OF EXISTING CURB TO BE REMOVED. | E.A. | 2 | |||||||||
| TOTAL SIDEWALKS & DRIVEWAYS TO BE REMOVED. | S.F. | 10,000 | |||||||||
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT COST | EXTENSION | ||||||
| 104.1 | STREET EXCAVATION (1000 to 10000 c.y.) | 9082 | C.Y. | TRUE | 8,140 | $14.92 | $121,448.80 | ||||
| 107.1 | EMBANKMENT (FINAL)(DENS CONT)(TY D) | 9082 | C.Y. | FALSE | 5865 | $11.17 | $65,512.05 | ||||
| 108.1 | LIME TREAT. FOR SUBGRADE (more than 500 s.y.) | 13623 | S.Y. | TRUE | 26,650 | $3.46 | $92,209.00 | ||||
| 200.1 | FLEXIBLE BASE (9" COMPACTED DEPTH) | 136 | S.Y. | FALSE | 19,829 | $8.64 | $171,322.56 | ||||
| 200.1 | FLEXIBLE BASE (18" COMPACTED DEPTH) | 136 | S.Y. | FALSE | 6,822 | $17.28 | $117,884.16 | ||||
| 202.1 | PRIME COAT | 136 | GAL. | TRUE | 5,330 | $4.18 | $22,279.40 | ||||
| 203.1 | TACK COAT | 1252 | GAL. | 1 | 2,665 | $4.42 | $11,779.30 | ||||
| 205.2 | HOT MIX ASPHALTIC PAVEMENT, TYPE B (12" COMP. DEPTH) | 12139 | S.Y. | FALSE | 233 | $45.40 | $10,578.20 | ||||
| 205.4 | H.M.A.C. ( 1 1/2" ) TYPE "D" (more than 5000 s.y.) | 12139 | S.Y. | TRUE | 17,830 | $7.03 | $125,344.90 | ||||
| 205.4 | H.M.A.C. ( 2" ) TYPE "D"(less than 10000 s.y.) | 12139 | S.Y. | FALSE | 233 | $8.25 | $1,922.25 | ||||
| 205.4 | H.M.A.C. ( 3 1/2" ) TYPE "D"(more than 10000 s.y.) | 12139 | S.Y. | TRUE | 6297 | $15.25 | $96,029.25 | ||||
| SUBTOTAL | $836,310 | ||||||||||
| 500.1 | CONCRETE CURBING ( > 1,000 L.F.) | 7632 | L.F. | TRUE | 12,346 | $9.89 | $122,101.94 | ||||
| 502.1 | CONCRETE SIDEWALKS(1,000 S.Y.< X <10,000S.Y.) | 3392 | S.Y. | TRUE | 1,364 | $36.61 | $49,936.04 | ||||
| STREET COST SUBTOTAL | $1,008,348 | ||||||||||
| MISCELLANEOUS (40% OF STREET COST) | $403,339.14 | (40% of st. work) | |||||||||
| Unique Project Street Costs | |||||||||||
| Description 1 | $0.00 | ||||||||||
| Description 2 | $0.00 | ||||||||||
| Description 3 | $0.00 | ||||||||||
| STREET COST | $1,411,686.99 |
&8Aug 2002 UP &8&D
&8Aug 2002 UP &8&D
&8Aug 2002 UP JOHN STRYBOS &8&D
&8&P of &N
&8&P of &N
&12Estimate Sheet 2 of 6
Traf-Env
| CIBOLO CANYON UNIT 6 Subdivision PRELIMINARY TRAFFIC/ENVIRONMENTAL COST ESTIMATE | ||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | |||||
| PROJECT LIMITS : | All streets in CIBOLO CANYON UNIT 6 Subdivision. | |||||
| Developed By: | TEAM 6 | J. STRYBOS | ||||
| Date Prepared: | 09/04/13 | |||||
| Project Number: | 2013-06-05 | |||||
| TRAFFIC DATA | ||||||
| Qty | Unit Price | Cost | ||||
| New Traffic Signals - Street section 44' or less | 0 | $ 75,000.00 | $0.00 | |||
| New Traffic Signals - Street section over 44' | 0 | $ 100,000.00 | $0.00 | |||
| Traffic Signals requiring Adjustment | 0 | $ 30,000.00 | $0.00 | |||
| Total Traffic Costs | $12,510.64 | |||||
| 0 | ||||||
| SIGN AND PAVEMENT MARKINGS QUANTITIES | ||||||
| ITEM | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | COST | |
| 531.3 | R1-1 STOP (30")(HIGH DENSITY) | 13 | EA. | 219.2 | $2,850 | |
| 531.6 | R2-1 SPEED LIMIT (24"x30")(HIGH DENSITY) | 2 | EA. | 206.07 | $412 | |
| 531.56 | OM-4P END OF ROAD MARKER (18"x18")(HIGH DENSITY) | 13 | EA. | 198.88 | $2,585 | |
| 531.57 | 9 INCH [229mm] STREET NAME, BLOCK NUMBER (VARIES x9")(HIGH DENSITY) | 12 | EA. | 158.03 | $1,896 | |
| 536.1 | 4 INCH WIDE YELLOW LINE | 2,470 | L.F. | 1.93 | $4,767 | |
| SIGN AND PAVEMENT MARKINGS PLAN COSTS | $12,511 | |||||
| ENVIRONMENTAL DATA | ||||||
| To determine the number of potential environmental concerns, identify all current/former gas stations, dry cleaning facilities, industrial facilities, landfills, auto junkyards, auto repair shops, etc. adjacent to the project site. Presuming these sites impact the project site, it is recommended that three soil borings be conducted for each site to explore potential impacts to subsurface soils and/or groundwater. | ||||||
| No. potential polluters | No. of borings | Cost/Boring | Cost | |||
| ESA II Boring Costs | 0 | 0 | $1,500.00 | $0.00 | ||
| For Level II Cost Estimates only, provide an estimate of remediation costs for those projects that have a high probability of encountering impacted media during construction (e.g., installing a storm drain system within impacted area). For cost estimating purposes, the cost to remediate a Class II Non-hazardous Waste at $25 per cubic yard, Class I Non-hazardous Waste at $50 per cubic yard, and Hazardous Waste at $100 per cubic yard. Please note that soil quantities for utilities need to be estimated and accounted for each area of concern and project. | ||||||
| Site Addresses Requiring Remediation | Probable type contamination | Cost | ||||
| $0 | ||||||
| $0 | ||||||
| $0 | ||||||
| $0 | ||||||
| $0 | ||||||
| Total Cost Remediation | $0 | |||||
| STORM WATER POLLUTION PREVENTION PLAN | ||||||
| ITEM | DESCRIPTION | QUANTITY | UNIT | UNIT PRICE | COST | |
| 540.6 | CONSTRUCTION EXITS (INSTALL/REMOVE) | 45 | S.Y. | 21.18 | $953 | |
| 540.7 | CONSTRUCTION PERIMETER FENCE | 1,718 | L.F. | 2.49 | $4,278 | |
| 540.8 | SANDBAGS FOR EROSION CONTROL FENCE (6") | 110 | L.F. | 7.55 | $831 | |
| 540.1 | CURB INLET GRAVEL FILTERS | 111 | L.F. | 10.74 | $1,192 | |
| TOTAL STORM WATER POLLUTION PREVENTION PLAN COSTS | $7,254 | |||||
| Total Environmental Costs | $7,253.56 |
&8Aug 2002 UP &8&D
&8Aug 2002 UP &8&D
&8Aug 2002 UP JOHN STRYBOS &8&D
&8&P of &N
&8&P of &N
&8Estimate Sheet 3 of 6
Breakdown
| CIBOLO CANYON UNIT 6 Subdivision PROJECT COST BREAKDOWN SHEET | ||||||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | |||||||||
| PROJECT LIMITS: | All streets in CIBOLO CANYON UNIT 6 Subdivision. | |||||||||
| Developed By: | TEAM 6 | J. STRYBOS | ||||||||
| Date Prepared: | 09/04/13 | |||||||||
| Project Number: | 2013-06-05 | |||||||||
| This sheet pro-rates inflation, material testing and administrative fees among tasks. | ||||||||||
| Unprorated costs | Testing | Subtotal | Admin | Subtotal | Inflation | Total | ||||
| Design Costs | ||||||||||
| - Consultant Fee | 298,892 | 255,634 | 255,634 | 17,894 | 273,529 | 25,363 | 298,892 | |||
| - Consultant Contingency | 29,889 | 25,563 | 25,563 | 1,789 | 27,353 | 2,536 | 29,889 | |||
| Total Design Costs | 328,781 | 281,198 | ||||||||
| Environmental Costs | 23,109 | 19,764 | 19,764 | 1,383 | 21,148 | 1,961 | 23,109 | |||
| Real Estate Costs | ||||||||||
| - Acquisition of Property | - | 0 | 0 | 0 | 0 | 0 | 0 | |||
| - Real Estate Surveying Costs | - | 0 | 0 | 0 | 0 | 0 | 0 | |||
| Total Real Estate Costs | - | 0 | ||||||||
| Miscellaneous Costs (FEMA) | - | 0 | 0 | 0 | 0 | 0 | 0 | |||
| Construction Costs | ||||||||||
| - Street Cost | 2,002,896 | 1,682,433 | 30,590 | 1,713,022 | 119,912 | 1,832,934 | 169,962 | 2,002,896 | ||
| - Drainage Cost | 946,961 | 795,447 | 14,463 | 809,910 | 56,694 | 866,604 | 80,358 | 946,961 | ||
| - Sidewalks Cost (Curb, Sidewalks, Driveways) | 275,184 | 231,154 | 4,203 | 235,357 | 16,475 | 251,832 | 23,352 | 275,184 | ||
| - Design Enhancement Cost | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| Total Construction Costs | 3,225,042 | 2,709,034 | 49,255 | 303,532 | 3,576,932 | |||||
| testing | 49,255 | 0 | 0 | |||||||
| admin | 214,148 | 214,148 | 0 | |||||||
| inflation | 303,532 | 303,532 | 303,532 | |||||||
| Total Project Cost | 3,576,932 | 3,576,932 | 3,576,932 | 214,148 | 3,576,932 | |||||
&8Aug 2002 UP &8&D
&8Aug 2002 UP &8&D
&8Aug 2002 UP John Strybos &8&D
&8&P of &N
&8&P of &N
&8Estimate Sheet 6 of 6
Drain
| CIBOLO CANYON UNIT 6 SUBDIVISION PRELIMINARY DRAINAGE COST ESTIMATE | ||||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | |||||||
| PROJECT LIMITS : | All streets in CIBOLO CANYON UNIT 6 Subdivision. | |||||||
| Developed By: | Group 13 | A.Alasfour | ||||||
| Date Prepared: | 04/09/14 | |||||||
| Project Number: | 2013-06-05 | |||||||
| For Level II Estimates submit a map showing the drainage areas, proposed flow routes, outfall systems and underground drainage systems, if any. Submit calculations justifying proposed drainage. Consider minimum street slope of 0.5% or 0.4% with curb and gutter when determining whether underground drainage is required. | ||||||||
| Is underground drainage required (yes or no)? | yes | |||||||
| Will project change the flood plain (yes or no)? | no | FEMA Map Cost: | $0 | |||||
| COST | ||||||||
| Level I Estimate: | ||||||||
| Level II Estimate | ||||||||
| ITEM # | Description | Quantity | Unit | Unit Price | Cost | |||
| 105.1 CHANNEL EXCAVATION (150 C.Y.< X < 5,000 C.Y.) | 277 | C.Y. | $16.90 | $4,681 | ||||
| 105.1 CHANNEL EXCAVATION(5,000 C.Y.< X < 70,000 C.Y.) | 14,906 | C.Y. | $15.26 | $227,466 | ||||
| 302.1 METAL FOR STRUCTURES ( > 500 LBS.) | 1,419 | LBS. | $5.40 | $7,663 | ||||
| 307.1 CONCRETE STRUCTURE (HEADWALLS OR OUTFALL STRUCTURES) | 1 | C.Y. | $902.42 | $902 | ||||
| 403.1 JUNCTION BOX 4'X4'X4' | 1 | EA. | $3,461.07 | $3,461 | ||||
| 403.2 JUNCTION BOX 5'X5'X5' | 3 | EA. | $4,233.29 | $12,700 | ||||
| 403.2 EXTRA DEPTH JUNCTION BOXES 5'X5' >5' | 6 | V.F. | $846.55 | $4,944 | ||||
| 403.3 JUNCTION BOX 6'X6'X6' | 3 | EA. | $5,573.59 | $16,721 | ||||
| 403.3 EXTRA DEPTH JUNCTION BOXES 6'X6' >5' | 11 | EA. | $1,114.72 | $11,872 | ||||
| 403.7 INLET TYPE I (COMPLETE)(10FT) | 5 | EA. | $5,850.98 | $29,255 | ||||
| 403.9 INLET EXTENSIONS (10 FT) | 4 | EA. | $5,850.98 | $23,404 | ||||
| 403.10 INLET (COMPLETE)(5 FT)(TXDOT) | 1 | EA. | $3,748.37 | $3,748 | ||||
| 403.10 EXTRA DEPTH CURB INLET 15 FOOT >5' | 2 | V.F. | $1,365.63 | $2,731 | ||||
| 403.10 EXTRA DEPTH CURB INLET 20 FOOT >5' | 2 | V.F. | $1,786.15 | $4,072 | ||||
| 403.11 INLET (EXTENSION)(5 FT)(TXDOT) | 2 | EA. | $2,783.11 | $5,566 | ||||
| 403.12 SPECIAL INLET (4-WAY) | 1 | EA. | $4,155.87 | $4,156 | ||||
| 404.1 CORRUGATED METAL PIPE (24" DIA) (0'-6') | 392 | L.F. | $46.50 | $18,228 | ||||
| 404.1 CORRUGATED METAL PIPE (24" DIA) (6'-10') | 46 | L.F. | $69.75 | $3,209 | ||||
| 404.1 CORRUGATED METAL PIPE (30" DIA) (6'-10') | 34 | L.F. | $69.50 | $2,363 | ||||
| 404.1 CORRUGATED METAL PIPE (36" DIA) (0'-6') | 35 | L.F. | $88.00 | $3,080 | ||||
| 404.1 CORRUGATED METAL PIPE (36" DIA) (6'-10') | 495 | L.F. | $98.25 | $48,634 | ||||
| 404.1 CORRUGATED METAL PIPE (42" DIA) (6'-10') | 463 | L.F. | $108.50 | $50,236 | ||||
| 404.1 CORRUGATED METAL PIPE (48" DIA) (6'-10') | 62 | EA. | $125.00 | $7,750 | ||||
| 409.0 CAST IRON CASTINGS | 3,380 | LBS. | $1.55 | $5,239 | ||||
| 409.1 GRATE INLET | 1 | EA. | $1,519.00 | $1,519 | ||||
| 409.2 GRATE INLET FRAME | 1 | EA. | $3,038.00 | $3,038 | ||||
| 505.1 CONCRETE RIPRAP (6" THICK) (< 4000 S.Y.) | 347 | S.Y. | $83.73 | $29,054 | ||||
| 550.1 TRENCH EXCAVATION SAFETY PROTECTION | 1,298 | L.F. | $1.93 | $2,505 | ||||
| Contingency | 1 | L.S. | 10% | $53,820 | ||||
| Subtotal | $592,016 | |||||||
| Total Drainage: | $592,016 |
&8Aug 2002 UP &8&D
&8Aug 2002 UP &8&D
&8Aug 2002 UP &8&D
&8&P of &N
&8&P of &N
&8Estimate Sheet 4 of 6
ROW
| CIBOLO CANYON UNIT 6 Subdivision PRELIMINARY REAL ESTATE COST ESTIMATE | |||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | ||||||
| PROJECT LIMITS : | All streets in CIBOLO CANYON UNIT 6 Subdivision. | ||||||
| Developed By: | TEAM 6 | J. STRYBOS | |||||
| Date Prepared: | 09/04/13 | Project Number: | 2013-06-05 | ||||
| Acquisition Cost guidelines for Level I: | $2/SF easements | ||||||
| $4/SF residential whole takes | |||||||
| $8/SF commercial whole takes | |||||||
| contact Bexar appraisal district for significant impact takes | |||||||
| note takes of extraordinary economic impact in project concept description | |||||||
| Corner Clips - Minimum Impact | Qty | Acquisition Cost (EA) | Admin Cost (EA) | Cost | |||
| Number of minimum impact Residential (0-200 SF) | 0 | $1,000 | $1,600 | $0 | |||
| Address of minimum impact Commercial | No. of SF required | Bexar Appraisal Cost/SF | Acquisition Cost | Admin Cost | Cost | ||
| none | 0 | $8.00 | $0 | $2,650 | $0 | ||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| Subtotal for Corner Clips minimum impact | $0 | ||||||
| Corner clips - Significant Impact | |||||||
| Address of Each and impact | Acquisition Cost (EA) | Admin Cost (EA) | Cost | ||||
| none | $0 | $0 | $0 | ||||
| $0 | $0 | $0 | |||||
| $0 | $0 | $0 | |||||
| $0 | $0 | $0 | |||||
| $0 | $0 | $0 | |||||
| Subtotal for Corner Clips significant impact | $0 | ||||||
| Address of Property Takings - Minimum Impact (Residential/Commercial) | No. of SF required | Bexar Appraisal Cost/SF | Acquisition Cost | Admin Cost | Cost | ||
| 0 | $1.00 | $0 | $2,650 | $0 | |||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| $0 | $2,650 | $0 | |||||
| Subtotal for Property Takings minimum impact | $0 | ||||||
| Property Takings - Significant Impact | Total SF | Acquisition Cost (SF) | Admin Cost (EA) | Cost | |||
| 0 | $0 | $0 | $0 | ||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| $0 | |||||||
| Subtotal Property Takings Significant Impact | $0 | ||||||
| Total Real Estate Acquisition Cost | $0 | ||||||
| Real Estate Survey Cost | Qty | Cost (EA) | Total Cost | ||||
| Number of Plats and Field Notes Required | 0 | $1,000 | $0 |
&8Aug 2002 Unit Prices JOHN STRYBOS &8&D
Estimate Sheet 5 of 6
SANSEWER
| CIBOLO CANYON UNIT 6 SUBDIVISION PRELIMINARY SANITARY SEWER COST ESTIMATE | ||||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | |||||||
| PROJECT LIMITS : | All streets in CIBOLO CANYON UNIT 6 Subdivision. | |||||||
| Developed By: | TEAM 6 | J. STRYBOS | ||||||
| Date Prepared: | 09/04/13 | |||||||
| Project Number: | 2013-06-05 | |||||||
| ITEM # | Description | Quantity | Unit | Unit Price | Cost | |||
| 550 Trench Excavation Safety Protection | 5,857 | L.F. | $2.50 | $14,643 | ||||
| 848 8” PVC Sanitary Sewer Line. (0’-6’) | 2,000 | L.F. | $72.00 | $144,000 | ||||
| 848 8” PVC Sanitary Sewer Line. (6’-10’) | 3,857 | L.F. | $75.00 | $289,275 | ||||
| 852 Sanitary Sewer Manhole (0' - 6') | 26 | EA. | $4,895.00 | $127,270 | ||||
| 852 Extra Depth Manholes (> 6') | 12 | V.F. | $321.00 | $3,891 | ||||
| 854 Sanitary Sewer Laterals | 3,249 | L.F. | $67.00 | $217,683 | ||||
| 854 One-Way Sanitary Sewer Clean-out | 129 | EA. | $530.00 | $68,370 | ||||
| 858 Concrete Encasement, Cradles, Saddles and Collars | 120 | C.Y. | $162.00 | $19,440 | ||||
| 866 Sewer Main Television Inspection (8" - 15") | 5,857 | L.F. | $3.00 | $17,571 | ||||
| Contingency | 1 | L.S. | 10% | $90,214.20 | ||||
| Subtotal | $992,356 | |||||||
| Total Sanitary Sewer | $992,356 |
&8Aug 2002 UP &8&D
&8Estimate Sheet 4 of 6
WATER
| CIBOLO CANYON UNIT 6 SUBDIVISION PRELIMINARY WATER COST ESTIMATE | ||||||||
| PROJECT NAME: | CIBOLO CANYON UNIT 6 SUBDIVISION | |||||||
| PROJECT LIMITS : | All streets in CIBOLO CANYON UNIT 6 Subdivision. | |||||||
| Developed By: | TEAM 6 | J. STRYBOS | ||||||
| Date Prepared: | 09/04/13 | |||||||
| Project Number: | 2013-06-05 | |||||||
| This waterline systems consist of 8 - inch and 12 - inch diameter waterlines to serve 129 single family residential home lots. | ||||||||
| COST | ||||||||
| Level I Estimate: | ||||||||
| Level II Estimate | ||||||||
| ITEM # | Description | Quantity | Unit | Unit Price | Cost | |||
| 550 | Trench Excavation Safety Protection | 7,309 | L.F. | $2.50 | $18,273 | |||
| 814 | 8" Ductile Iron Pipe | 5,153 | L.F. | $79.00 | $407,087 | |||
| 814 | 12" Ductile Iron Pipe | 2,156 | L.F. | $93.00 | $200,508 | |||
| 822 | Short Yard Piping | 210 | L.F. | $18.00 | $3,780 | |||
| 824 | New 3/4" Short Service | 74 | EA. | $1,053.00 | $77,922 | |||
| 824 | New 3/4" Long Service | 55 | EA. | $1,000.00 | $55,000 | |||
| 828 | 8" Gate Valves | 16 | EA. | $1,600.00 | $25,600 | |||
| 828 | 12" Gate Valves | 5 | EA. | $2,723.00 | $13,615 | |||
| 832 | 12" X 8" Tapping Sleeves & Valves | 2 | EA. | $4,000.00 | $8,000 | |||
| 833 | Meter Box (non-standard meter box, such as Type 1 or Type 2) | 129 | EA. | $241.00 | $31,089 | |||
| 834 | Fire Hydrant | 12 | EA. | $4,315.00 | $51,780 | |||
| 836 | Pipe Fittings, all sizes and types | 1 | TON | $4,785.00 | $5,264 | |||
| 841 | Hydrostatic Testing | 1 | EA. | $1,523.00 | $1,523 | |||
| 844 | 2" Blowoff, Permanent | 6 | EA. | $1,767.00 | $10,602 | |||
| 844 | 2" Blowoff, Temporary | 2 | EA. | $1,364.00 | $2,728 | |||
| 856 | 12" Carrier Pipe for Jacking, Boring, Tunneling | 130 | L.F. | $57.00 | $7,410 | |||
| 856 | 16" Carrier Pipe for Jacking, Boring, Tunneling | 304 | L.F. | $74.00 | $22,496 | |||
| 856 | 20" Carrier Pipe for Jacking, Boring, Tunneling | 120 | L.F. | $154.00 | $18,480 | |||
| 856 | 24" Carrier Pipe for Jacking, Boring, Tunneling | 100 | L.F. | $97.00 | $9,700 | |||
| Contingency | 1 | L.S. | 10% | $97,086 | ||||
| Subtotal | $1,067,942 | |||||||
| Total WATER LINE: | $1,067,942 |
&8Aug 2002 UP &8&D
&8Estimate Sheet 4 of 6
DRAINCALCS
| WIDTH (FT) | DEPTH (FT) | LENGTH (FT) | V | UNITS | COMMENTS |
| 15 | 1.5 | 246 | 205 | (CY) | HILLCREST SUBDIVISION LINE A - CHANNEL EXCAVATION |
| 11 | 1.75 | 125 | 89 | (CY) | CIBOLO CANYON UNIT 6 DRAIN A - CHANNEL EXCAVATION |
| 13.5 | 0.5 | 125 | 31 | (CY) | CIBOLO CANYON UNIT 6 DRAIN A - STRUCTURAL CONCRETE |
| 0.668 | 15.5 | 85 | 880 | (LBS) | CIBOLO CANYON UNIT 6 DRAIN A - METAL FOR STRUCTURES |
| 0.668 | 125 | 13 | 1,086 | (LBS) | CIBOLO CANYON UNIT 6 DRAIN A - METAL FOR STRUCTURES |
| 0.668 | 10 | 13 | 87 | (LBS) | CIBOLO CANYON UNIT 6 DRAIN A - METAL FOR STRUCTURES |
| 0.668 | 16 | 7 | 75 | (LBS) | CIBOLO CANYON UNIT 6 DRAIN A - METAL FOR STRUCTURES |
| 0.668 | 33 | 18 | 397 | (LBS) | CIBOLO CANYON UNIT 2 DRAIN D - METAL FOR STRUCTURES |
| 0.668 | 17 | 34 | 386 | (LBS) | CIBOLO CANYON UNIT 2 DRAIN D - METAL FOR STRUCTURES |
| REINFORCING STEEL BAR DATA | |||||
| DESIGNATION | WT (LB/FT) | DIAMETER (INCHES) | AREA (SQUARE INCHES) | ||
| 3 | 0.376 | 0.375 | 0.110 | ||
| 4 | 0.668 | 0.500 | 0.200 | ||
| 5 | 1.043 | 0.625 | 0.310 | ||
| 6 | 1.502 | 0.750 | 0.440 | ||
| 7 | 2.044 | 0.875 | 0.600 | ||
| 8 | 2.670 | 1.000 | 0.790 | ||
| 9 | 3.400 | 1.128 | 1.000 | ||
| 10 | 4.303 | 1.270 | 1.270 | ||
| 11 | 5.313 | 1.410 | 1.560 | ||
| 14 | 7.650 | 1.693 | 2.250 | ||
| 18 | 13.600 | 2.257 | 4.000 |
UNIT PRICES
| MISSING PRICES OR PRICES THAT YOU CANNOT FIND | ||
| MISSING ITEM | ITEM TO USE | |
| 4-8'X4' MBC QTY = 55.75 LF | 309.1 PRECAST REINFORCED CONCRETE CULVERT (8' x 4') USE QUANTITY = 4 *56 = 224 LF UNIT PRICE IS $327.01//LF | |
| 4-7'X4' MBC QTY = 64.37 LF | 309.1 PRECAST REINFORCED CONCRETE CULVERT (7' x 4') USE QUANTITY = 4 *64 = 264 LF UNIT PRICE IS $327.01/LF | |
| 30" CMP QTY = 1040.18 LF | 404.1 CORRUGATED METAL PIPE (30" DIA) 1041 LF UNIT PRICE IS $69.50/LF | |
| 30" UFCMP QTY = 576.53 LF | 404.1 CORRUGATED METAL PIPE (30" DIA) 577 LF UNIT PRICE IS $69.50//LF | |
| 24" UFCMP QTY = 224.49 LF | 404.1 CORRUGATED METAL PIPE (24" DIA) 1041 LF UNIT PRICE IS $46.50/LF | |
| 107.1 HAUL OFF EXCESS MATERIAL 3,254.830 CY | 105.1CHANNEL EXCAVATION ( > 70,000 C.Y.) 3,255 CY UNIT PRICE IS $7.01/CY | |
| 200.2 FLEX BASE (9" THICK) 19,828.29 SY | 200.1 FLEXIBLE BASE (8" COMPACTED DEPTH) 19,829 SY UNIT PRICE IS $9.44/SY | |
| 201.2 FLEX BASE (18" THICK) 6,821.87 SY | 200.1 FLEXIBLE BASE (16" COMPACTED DEPTH) 6,822 SY UNIT PRICE IS $17.74/SY | |
| 36" CMP OR UFCMP | 404.1 CORRUGATED METAL PIPE (36" DIA) UNIT PRICE IS $88.00/LF | |
| 48" CMP OR UFCMP | 404.1 CORRUGATED METAL PIPE (48" DIA) UNIT PRICE IS $125.00/LF | |
| 54" CMP OR UFCMP | 404.1 CORRUGATED METAL PIPE (54" DIA) UNIT PRICE IS $168.00/LF | |
| 42" CMP OR UFCMP | 404.1 CORRUGATED METAL PIPE (42" DIA) UNIT PRICE IS $108.50/LF | |
| 301.0 REINFORCING STEEL | 302.1 302.1 METAL FOR STRUCTURES ( > 500 LBS.) UNIT PRICE IS $5.40/LB | |
| 49" X 39" CMP ARCH | 404.2 CORRUGATED METAL PIPE (ARCHED)(DESIGN "49"X39") UNIT PRICE IS $179.00/LF | |
| 20"- 8" X 6"-3" CMP ARCH | 404.2 CORRUGATED METAL PIPE (ARCHED)(DESIGN "21"X15") UNIT PRICE IS $61.50/LF | |
| 8"X8" TEE CUT IN | 831 8" X 8" TEE CUT IN UNIT PRICE IS $2,559.00 EACH | |
| 16"X12" TAPPING SLEEVE | 832 16"X12" TAPPING SLEEVE UNIT PRICE IS $5,735.00 EACH | |
| 205.3 1.5" HMAC TYPE D 17,829.450 SY | 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (1.5" COMP. DEPTH) ( > 5000 S.Y.) UNIT PRICE IS $7.03/SY | |
| 205.3 3.5" HMAC TYPE D 6,296.460 SY | 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (3" COMP. DEPTH) UNIT PRICE IS $11.75/SY | |
| 206.0 ASPHALT TREATED BASE (12" THICK) 232.500 SY | 205.2 HOT MIX ASPHALTIC PAVEMENT, TYPE B (12" COMP. DEPTH) UNIT PRICE IS $45.40/SY | |
| 900.0 HEADER CURB | 500.1 CONCRETE CURBING ( < 1,000 L.F.) UNIT PRICE IS $12.09/LF | |
| 900.0 TRAFFIC CALMING DEVICE (SPEED HUMP) | 900.0 TRAFFIC CALMING DEVICE (SPEED HUMP) UNIT PRICE IS $822/EA | |
| 409.0 CAST IRON CASTINGS | 409.0 CAST IRON CASTINGS UNIT PRICE IS $1.55/LB | |
| 105.1 CHANNEL EXCAVATION DETENTION POND | 105.1 CHANNEL EXCAVATION(5,000 C.Y.< X < 70,000 C.Y.) UNIT PRICE IS $15.26/CY | |
| 3'X3' 4 Way Inlet | 403.12 SPECIAL INLET (4-WAY) UNIT PRICE IS $7,722.25/EA | |
| 4'X4' 4 Way Inlet | 309.1 PRECAST REINFORCED CONCRETE CULVERT (7' x 4') USE QUANTITY = 4 *64 = 264 LF UNIT PRICE IS $327.01/LF | |
| 300.1 CURB INLET 5' | 403.10 INLET (COMPLETE)(5 FT)(TXDOT) UNIT PRICE IS $3,748.37 | |
| 300.1 CURB INLET 10' | 403.7 INLET TYPE I (COMPLETE)(10FT) UNIT PRICE IS $5,850.98/EA | |
| 300.1 CURB INLET 15' | 403.10 INLET (COMPLETE)(5 FT)(TXDOT) UNIT PRICE IS $3,748.37 + 403.9 INLET EXTENSIONS (10 FT) UNIT PRICE IS $3,079.79/EA | |
| 300.1 CURB INLET 20' | 403.7 INLET TYPE I (COMPLETE)(10FT) UNIT PRICE IS $5,850.98/EA + 403.9 INLET EXTENSIONS (10 FT) UNIT PRICE IS $3,079.79/EA | |
| 300.1 CURB INLET 30' | 403.7 INLET TYPE I (COMPLETE)(10FT) UNIT PRICE IS $5,850.98/EA + TWO OF 403.9 INLET EXTENSIONS (10 FT) UNIT PRICE IS $3,079.79/EA | |
| 101 PREPARING RIGHT-OF- WAY (STREETS) | 101.1 PREPARING RIGHT OF WAY UNIT PRICE IS 4% OF CONSTRUCTION COST - DO NOT USE THIS ITEM AT THIS TIME. | |
| 107 STREET EMBANKMENT | 107.2 EMBANKMENT (ORIGINAL)(DENS CONT)(TY A) $8.46/CY | |
| 205.3 2" HMAC TYPE D | 205.4 HOT MIX ASPHALTIC PAVEMENT, TYPE D (2" COMP. DEPTH) ( > 5000 S.Y.) $8.22/SY | |
| 202 PRIME COAT ( 0.2 GAL / S.Y.) | 202.1 PRIME COAT UNIT PRICE IS $4.18/GAL | |
| 203 TACK COAT (0.1 GAL/SY) | 203.1 TACK COAT UNIT PRICE IS $4.42/GAL | |
| 501 7" CONCRETE CURB | 500.1 CONCRETE CURBING ( < 1,000 L.F.) UNIT PRICE IS $12.09/LF | |
| 502 4' CONCRETE SIDEWALKS (Site contractor) | 502.1 CONCRETE SIDEWALKS (150 S.Y. < X < 1,000 S.Y.) UNIT PRICE IS $40.59/SY | |
| 502.1 6' CONCRETE SIDEWALKS (Site contractor) | 502.1 CONCRETE SIDEWALKS (150 S.Y. < X < 1,000 S.Y.) UNIT PRICE IS $40.59/SY | |
| 300.1 Junction Box (3' x3') | 403.1 JUNCTION BOX 3'X3'X3' UNIT PRICE IS $2,786.80/EA | |
| 300.1 Junction Box (4' x4') | 403.1 JUNCTION BOX 4'X4'X4' UNIT PRICE IS $3,461.07/EA | |
| 300.1 Junction Box (5' x5') | 403.2 JUNCTION BOX 5'X5'X5' UNIT PRICE IS $4,233.29/EA | |
| 300.1 Junction Box (6' x6') | 403.3 JUNCTION BOX 6'X6'X6' UNIT PRICE IS $5,573.59/EA | |
| 300.1 Junction Box (4' x8') | 403.1 JUNCTION BOX 4'X8'X8' UNIT PRICE IS $6,922.14/EA | |
| 300.1 EXTRA DEPTH JUNCTION BOXES 5'X5' | 403.2 EXTRA DEPTH JUNCTION BOXES 5'X5' UNIT PRICE IS $846.55/VF | |
| 300.1 EXTRA DEPTH JUNCTION BOXES 6'X6' | 403.3 EXTRA DEPTH JUNCTION BOXES 6'X6' UNIT PRICE IS $1,114.72/VF | |
| 300.1 EXTRA DEPTH CURB INLET 15 FOOT | 403.10 EXTRA DEPTH CURB INLET 15 FOOT UNIT PRICE IS $1,365.63/VF | |
| 300.1 EXTRA DEPTH CURB INLET 20 FOOT | 403.10 EXTRA DEPTH CURB INLET 20+B39 FOOT UNIT PRICE IS $1,786.15/VF | |
| Grate Inlet | 403.12 SPECIAL INLET (4-WAY) UNIT PRICE IS $7,722.25/EA +409.1 Grate Unit Price is $1,519/EA+ 409.2 Frame Unit Price is $$3038/EA. | |
| 3X3 SINGLE BOX CULVERT | 309.1 PRECAST REINFORCED CONCRETE CULVERT (3' x 3') UNIT PRICE IS $153.75/LF | |
| 5X3 SINGLE BOX CULVERT | 309.1 PRECAST REINFORCED CONCRETE CULVERT (5' x 3') UNIT PRICE IS $207.50/LF | |
| 4X3 SINGLE BOX CULVERT | 309.1 PRECAST REINFORCED CONCRETE CULVERT (4' x 3') UNIT PRICE IS $200.50/LF | |
| 6X3 SINGLE BOX CULVERT | 309.1 PRECAST REINFORCED CONCRETE CULVERT (6' x 3') UNIT PRICE IS $293.75/LF | |
| 7X3 SINGLE BOX CULVERT | 309.1 PRECAST REINFORCED CONCRETE CULVERT (7' x 3') UNIT PRICE IS $327.01/LF | |
| 836 FITTINGS | FOR EVERY 3.5 LINEAR FEET OF WATER LINE PIPE USE 1 POUND OF FITTINGS | |
STREETNAMES
| SUBDIVISION STREET NAMES AND LENGTHS | |||||
| NOTTING HILL SUBDIVISION | Length (feet) | WATER | |||
| Cambridge Park | 399 | SANITARY SEWER | |||
| Thackes Park | 185 | DRAINAGE OR STORM SEWER | |||
| Holland Park | 1,200 | ||||
| Rebecca Park | 300 | ||||
| Goose Park | 300 | ||||
| Elizabeth Park | 1,200 | ||||
| Elgin Park | 760 | ||||
| Horse Park | 126 | ||||
| Scott Park | 119 | ||||
| Grand Western | 1,200 | ||||
| Weichold Road | 1,000 | ||||
| Cibolo Canyon Unit 6 | WATER | ||||
| Ladera Ranch | 807 | SANITARY SEWER | |||
| Las Casitas | 610 | DRAINAGE OR STORM SEWER | |||
| Verrado | 610 | ||||
| Asoleado | 392 | ||||
| Cielo Grande | 200 | ||||
| La Tapiceria | 1,197 | ||||
| Cibolo Canyon Unit 2 | WATER | ||||
| TPC East = Cibolo Canyon Blvd. | 9,809 | DRAINAGE OR STORM SEWER | |||
| TPC West = Cibolo Canyon Blvd. | 9,968 | NO SANITARY SEWER | |||
| Alamo Ranch | |||||
| Alamo Ranch West Bound | 3,577 | WATER | NO SANITARY SEWER | ||
| Alamo Ranch East Bound | 3,462 | DRAINAGE OR STORM SEWER | |||
| Stonewall Estates Unit 2 | |||||
| Stonewall Hill | 1,800 | WATER | |||
| Setina Hill | 300 | SANITARY SEWER | |||
| Rugosa Hill | 700 | DRAINAGE OR STORM SEWER | |||
| Wine Cup Hill | 1,800 | ||||
| Hermosa Hill | 1,900 | ||||
| Stonewall Estates Unit 1 | WATER | ||||
| Heurmann Road | 1,400 | SANITARY SEWER | |||
| Dortmund Hill | 3,800 | DRAINAGE OR STORM SEWER | |||
| Burbank Hill | 400 | ||||
| Chaucer Hill | 1,000 | ||||
| Givenchy Hill | 400 | ||||
| Eden Rose | 400 | ||||
| Miranda Hill | 100 | ||||
| Hansa Hill | 300 | ||||
| Granada Hill | 900 | ||||
| Parkside Village | WATER | ||||
| Alon Loop | 935 | SANITARY SEWER | |||
| Amsterdam | 986 | DRAINAGE OR STORM SEWER | |||
| Zurich | 1,259 | ||||
| Stockholm | 248 | ||||
| Dusseldorf | 876 | ||||
| Budapest | 482 | ||||
| Prague | 277 | ||||
| Tokyo | 364 | ||||
| Hillcrest | WATER | ||||
| Rustic Cedar | 60 | SANITARY SEWER | |||
| Western Cactus | 200 | DRAINAGE OR STORM SEWER | |||
| Dewlap | 120 | ||||
| Soogan | 140 | ||||
| Bisley | 1,650 | ||||
| Livewater | 125 | ||||
| Burning Lamp | 700 | ||||
| Rustic Spoke | 650 | ||||
| Total = | 3,645 |