MSD 340 Spring 2014

Homework 1

Note:

• Due date: Feb 12, Wednesday. A hard copy is due before the start of the class.

• Please provide detailed steps (intermediate formula and final result) for each answer.

• Late homework will receive NO credits.

• If you have any difficulties, please make an appointment with the instructor.

Chapter 2: Productivity

Question 1 (1 point):

A company that makes shopping carts for supermarkets and other stores recently purchased new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 10 workers, and produced an average of 60 carts per hour. The machine cost was $20 per hour. With the new equipment, it was possible to transfer 2 of the workers to another department, and equipment cost increased by $6 per hour while output increased by 3 carts per hour. Each worker continues to receive $8 per hour.

a. Compute labor productivity under each system. Use carts per worker per hour as the measure of labor productivity. (0.4 point)

b. Compute the multifactor (labor plus equipment) productivity under each system. Use carts per dollars cost as the measure. (0.4 point)

c. Which productivity measure you believe is the more pertinent for this situation? Why? (0.2 point)

Chapter 3: Forecasting

Question 2 (1 point):

An electrical contractor’s records during the last five weeks indicate the number of job requests:

Week

1

2

3

4

5

Requests

20

22

19

21

19

Predict the number of requests for Week 6 using each of these methods:

a. Naïve. (0.2 point)

b. Four-period moving average. (0.2 point)

c. Four-period weighted moving average using weights (0.2 point)

d. Exponential smoothing with α=0.20. Use 20 for Week 3 forecast. (0.4 point)