OPERATIONS MANAGEMENT - PROBLEMS IN - Statistical Quality Control

profilehecore
chapter_6._statistical_quality_control_problems_and_questions.docx

Chapter 6. Statistical Quality Control

Question 1

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

A quality control manager at a manufacturing facility has taken four samples with four observations each of the diameter of a part.

Samples of Part Diameter in Inches

1

2

3

4

6.2

5.8

5.7

5.8

6.2

6.3

6.1

6.1

6.0

5.9

6.2

6.1

5.9

5.7

5.9

6.2

(a) Compute the mean of each sample.  (Round answers to 3 decimal places, e.g. 15.250.)

Mean of sample 1

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Mean of sample 2

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Mean of sample 3

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Mean of sample 4

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

(b) Compute an estimate of the mean and standard deviation of the sampling distribution.  (Round answers to 4 decimal places, e.g. 15.2500.)

Mean

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Standard deviation

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

(c) Develop control limits for 3 standard deviations of the product diameter.  (Round   answers to 2 decimal places,   e.g. 15.25.)

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Question 2

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

The Awake Coffee Company produces gourmet instant coffee. The company wants to be sure that the average fill of coffee containers is 12.0 ounces. To make sure the process is in control, a worker periodically selects at random a box of six containers of coffee and measures their weight. When the process is in control, the range of the weight of coffee samples averages 0.6 ounces.

a) Develop an R-chart and an  -chart for this process and answer the questions. b) The measurements of weight from the last five samples taken of the six containers follow:

http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/c06/q6b.jpg

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Control limits for x-bar chart.  (Round answers to 2 decimal places, e.g. 15.25.)

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Control limits for R-chart.  (Round answers to 2 decimal places, e.g. 15.25.)

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Is the process in control?

The process is in control.

The process is not in control.

Question 3

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

A production manager at a Contour Manufacturing plant has inspected the number of defective plastic molds in five random samples of 35 observations each. Following are the number of defective molds found in each sample:

Sample

 

Number of Defects

 

Number of Observations in Sample

1

 

3

 

35

2

 

2

 

35

3

 

0

 

35

4

 

1

 

35

5

 

0

 

35

Total

 

6

 

175

Construct a 3-sigma control chart (z = 3) with this information.  (If the lower control limit is negative, round the LCL to zero and all other answers to 2 decimal places, e.g. 15.25.)

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Question 4

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

U-learn University uses a c-chart to monitor student complaints per week. Complaints have been recorded over the past ten weeks. Develop 3-sigma control limits using the following data:

Week

 

Number of Complaints

1

 

0

2

 

2

3

 

1

4

 

2

5

 

2

6

 

3

7

 

3

8

 

0

9

 

3

10

 

3

(If the lower control limit is negative, round the LCL to zero and all other   answers to 2 decimal places, e.g. 15.25.)

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Question 5

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

University Hospital has been concerned with the number of errors found in its billing statements to patients. An audit of 100 bills per week over the past 12 weeks revealed the following number of errors:

Week

 

Number of Errors

1

 

4

2

 

5

3

 

6

4

 

6

5

 

3

6

 

2

7

 

6

8

 

7

9

 

3

10

 

4

11

 

3

12

 

4

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

What type of chart should be used?

R-chart

p-chart

x-bar chart

c-chart

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Develop control charts with z = 3: (a) CL, (b) UCL, (c) LCL.  (If the lower control limit is negative, round the LCL to zero and all other   answers to 2 decimal places, e.g. 15.25.)

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Is the process in control?

The process is not in control

The process is in control

Question 6

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Compute the (a) Cpk and (b) Cp measures of process capability for the following machine.  (Round answers to 2 decimal places, e.g. 15.25.)

Machine data:

USL = 100

LSL = 70

Process σ = 5

Process μ = 80

Cpk

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Cp

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Question 7

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Breeze Toothpaste Company makes tubes of toothpaste. The product is produced and then pumped into tubes and capped. The production manager is concerned whether the filling process for the tubes of toothpaste is in statistical control. The process should be centered on 6 ounces per tube. Six samples of five tubes were taken and each tube was weighed. The weights are:

Ouches of Toothpaste per Tube

Sample

 

1

 

2

 

3

 

4

 

5

1

 

5.78

 

6.34

 

6.24

 

5.23

 

6.12

2

 

5.89

 

5.87

 

6.12

 

6.21

 

5.99

3

 

6.22

 

5.78

 

5.76

 

6.02

 

6.10

4

 

6.02

 

5.56

 

6.21

 

6.23

 

6.00

5

 

5.77

 

5.76

 

5.87

 

5.78

 

6.03

6

 

6.00

 

5.89

 

6.02

 

5.98

 

5.78

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Develop a control chart for the mean and range for the available toothpaste data.  (Round answers to 3 decimal places, e.g. 15.250.) x-bar chart :

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

R-chart :

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Choose the appropriate control chart based on your observations.

http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595436679830_12595247861672.jpg http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595454341630_40477878030582126.jpg

http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595437051600_0680447158375811.jpg http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595454341590_32150210304872506.jpg

http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595435909660_4740194621245851.jpg http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595454341660_9421785673163714.jpg

http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595437432620_7518883496474469.jpg http://edugen.wileyplus.com/edugen/courses/crs6904/art/qb/qu/ch0/EAT_13595454813400_05326724333366295.jpg

Question 8

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Breeze Toothpaste Company has been having a problem with some of the tubes of toothpaste leaking. The tubes are packed in containers with 100 tubes each. Ten containers of toothpaste have been sampled. The following number of toothpaste tubes were found to have leaks:

Sample

 

Number of  Leaky Tubes

 

Sample

 

Number of  Leaky Tubes

1

 

4

 

6

 

6

2

 

8

 

7

 

10

3

 

12

 

8

 

9

4

 

11

 

9

 

5

5

 

12

 

10

 

8

 

 

Total

 

85

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Develop a p-chart with 3-sigma control limits: (a) CL, (b) UCL, (c) LCL.  (If the lower control limit is negative, round the LCL to zero and round all other answer to 3 decimal places, e.g. 15.250.)

CL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

UCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

LCL

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Is the process in control?

The process is not in control

The process is in control

Question 9

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

The Crunchy Potato Chip Company packages potato chips in a process designed for 8.0 ounces of chips with an upper specification limit of 8.5 ounces and a lower specification limit of 7.5 ounces. The packaging process results in bags with an average net weight of 7.86 ounces and a standard deviation of 0.1 ounces. The company wants to determine if the process is capable of meeting design specifications.  (Round answers to 3 decimal places, e.g. 15.250.)

Cp

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Cpk

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

The process is http://edugen.wileyplus.com/edugen/art2/common/pixel.gif.

Question 1

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Discuss the key differences between common and assignable causes of variation. Give examples.

Question 2

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

The standard deviation of the distribution of sample means is computed by

z*σ

σ/z

σ/x

σ/√n

Question 3

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

For the standard normal distribution, how much confidence is provided within 2 standard deviations above and below the mean?

97.22%

95.44%

99.74%

99.87%

90.00%

Question 4

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

Six-Sigma quality implies how many average defects per million?

3.4

6

2600

Question 5

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

A control chart for ______________ is used to monitor characteristics that can be measured.

data

attributes

variables

limits

deviations

Question 6

http://edugen.wileyplus.com/edugen/art2/common/pixel.gif

A control chart for ______________ is used to monitor characteristics that have discrete values and can be counted.

data

attributes

variables

deviations

limits