The manager of a local pub is considering adding a healthier option to the menu in the form of a veggie plate with hummus. There are two options with the price to the customers the same. The make in-house option is to buy local produce from a local farmer’s market and have the staff assemble the veggie plates. This would require some special prep space, equipment, etc. and a part-time prep cook would need to be hired. The pub manager estimates the fixed costs of this option at $12,000 and variable costs at $1.50 per veggie plate. The buy (or outsource) option is to contract with a local supplier and get preassembled veggie plates for $2 per plate. This however, would require a new refrigerator to hold the preassembled plates at an annual fixed cost of $2400.
- At how many veggie plates sold does it still make sense to install the equipment and make the plates in house? To get them from a supplier?
- How many plates must be sold to make the manager indifferent across the make or buy options?
7 years ago
5
- discussion
- Bus Law
- Edu 4005 Week 6 Journal
- History of the American Economy
- Any Takers
- analysis, modeling and design
- edit and add to my work
- essay
- A+ Solution CIS 273 Web Design Lab Assignment 6: Working with Tables
- Write the code for each lab assignment. The code is to be submitted in a single compressed folder (zip file) to the online course shell. The file must contain all .htm files, along with any other files that may be necessary for your project to run (ex: te