WBS Diagram
Find and move to new home
1 Choose a location
1.1 Select city
1.2 Select area
1.3 Select real estate agent
1.1.1 Review city maps
1.1.2 Research city online
1.1.3 Ask friends and colleagues
1.2.1 Review area maps
1.2.2 Research neighborhoods online
1.2.3 Drive around neighborhoods
1.3.1 Interview agents
1.3.2 Get recommendations
1.3.3 Contract with agent
2 Select a new home
2.1 Obtain financing approvals
2.2 View properties
2.3 Buy new home
2.1.1 Collect financial documents
2.1.2 Prequalify for loan
2.2.1 View online
2.2.2 View by driving around
2.2.3 Tour properties
2.3.1 Make an offer and negotiate price
2.3.2 Review and sign contract
2.3.3 Perform home inspection
2.3.4 Attend closing and sign final papers
3 Sell current home
3.1 Clean and repair
3.2 Prepare to move
3.3 Move to new home
3.1.1 Obtain contractor bids
3.1.2 Select contractor
3.1.3 Complete work
3.2.1 Sort through belongings
3.2.2 Hold yard sale
3.2.3 Donate unwanted belongings
3.3.1 Contract with mover
3.3.2 Close utility accounts
3.3.3 Find hotel to use during wait for mover
4 Occupy new home
4.1 Move in
4.2 Arrange for utilities
4.3 Live in new home
4.1.1 Meet mover
4.1.2 Supervise mover
4.1.3 Unpack
4.1.4 File damage claims
4.2.1 Set up electric and water accounts
4.2.2 Set up Wi-Fi and cable TV accounts
4.2.3 Arrange for other utilities
4.3.1 Introduce yourself to neighbors
4.3.2 Plant flowers
4.3.3 Install dog fence
4.3.4 Install security system
MS Project Practice Assignment
MSProjectHowtoSaveFilestoLocalMachine.pdf
Page 1 of 5
How to Save a File in the UMGC Lab, Download and Upload to and from a Local Computer
Note: In this guide, we used Microsoft Chromium Browser and Project, but the same concept for
other browsers.
Save the file as you would normally do on your local computer.
From the file menu, click: File | Save As | Browse
Browse or select the location you want to save the file. Keep in mind; this is within your UMGC lab
environment.
In this example, the Desktop is selected to save the file
Click “Save”
Page 2 of 5
In the center of the page, click the three lines in the half-circle to see the menu options
Click the “Download” button
In the “Open” pop up window, select the file you want to download and click “Open.”
As with any download option, you will get a pop up from the browser to save or open the file.
Page 3 of 5
If you click “Save as”, you will be prompted to select a location to save the file. By default, it will
open the “Download” folder on your local computer
You can choose to rename the file or keep the same name. Click “Save”
If you chose open on the browser prompt, the file would be opened on your local computer (Check
your download folder for a copy of the file)
To upload file(s) from your computer to the UMGC lab environment, go back to the lab window
and click the half-moon with three lines button at the center of the browser and click “Upload.”
Browse to the location of the file you want to upload and click open
Page 4 of 5
In the “Upload To:” window, select the location where you want to save the file (in this example,
files will be saved to a previously created folder; uploaded files)
Click “Ok”
Page 5 of 5
The file will be in the specified folder
Note: If files are saved within your profile, which is “Documents, Desktop, Downloads, etc. you
will find them in the “Windows Explorer” folder.
This concludes the guide to save, download and upload files in the UMGC lab environment and to
and from your local computer.
AccessingMSProject.docx
Accessing MS Project
Access MS Project software by going to https://vdi.umgc.edu
See attachment for how to save files to your local machine
MS Project How to Save Files to Local Machine
|
MS Project Practice Assignment Contains unread posts Must post first. After viewing the learning videos and learning topics for MS Project, complete a practice assignment to familiarize with the basic features of MS Project. This would be useful to start your Team Project 2. A high-level Work Breakdown Structure (WBS) for your practice project that covers the key facets of work is shown below (click on the link to open the PowerPoint slide) : MBA 670 MS Project Practice Assignment Using this WBS, establish all required dependencies for activities and create your Gantt chart with the project schedule in MS Project. Ensure that your Gantt chart indicates the critical path in red. If you need help, please follow these Microsoft Project guidelines . Post your Practice Assignment Gantt chart as response to this post. This practice assignment should be completed by 11:59 PM on Sunday of Week 2. This is an ungraded assignment. However, completion of this assignment is required before you are graded on your Project 1. You must start a thread before you can read and reply to other threads |
|
|
|
|
Learning Microsoft Project - Some helpful Videos 1. Microsoft Project Professional 2019 - Full Tutorial for Beginners [+ Overview]: - 13:46 https://www.youtube.com/watch?v=eOrU6hJ64HY 2. Microsoft Project 2019 Tutorial: The Project 2019 Workspace: - 14:56 https://www.youtube.com/watch?v=T9i8_12oDT4&list=PLzj7TwUeMQ3jo_PtA6h6LNhvMbWNtJsXL&index=2 3. Microsoft Project 2019 Tutorial: Project Task Basics: - 10:19 https://www.youtube.com/watch?v=iq5ceh6q4pE 4. Microsoft Project 2019 Tutorial: Project Task Basics (Part 2): - 12:41 https://www.youtube.com/watch?v=jgLhu8IHnfo 5. Microsoft Project 2019 Tutorial: Dependencies in MS Project: - 16:17 https://www.youtube.com/watch?v=bIMO3MSfLgY&list=PLzj7TwUeMQ3jo_PtA6h6LNhvMbWNtJsXL&index=4 6. Microsoft Project 2019 Tutorial: Summary Tasks and Outlining in Project: - 18:10 https://www.youtube.com/watch?v=MuxevgrxOaI&list=PLzj7TwUeMQ3jo_PtA6h6LNhvMbWNtJsXL&index=3 7. Microsoft Project 2019 For Beginners: Introductory Course: https://simonsezit.lpages.co/project-2019-free-course/ |
|
|
|
MSProjectPracticeAssignment.docx
MS Project Practice Assignment
Must post first.
After viewing the learning videos and learning topics for MS Project, complete a practice assignment to familiarize with the basic features of MS Project. This would be useful to start your Team Project 2.
A high-level Work Breakdown Structure (WBS) for your practice project that covers the key facets of work is shown below (click on the link to open the PowerPoint slide) :
MBA 670 MS Project Practice Assignment
Using this WBS, establish all required dependencies for activities and create your Gantt chart with the project schedule in MS Project.
Ensure that your Gantt chart indicates the critical path in red. If you need help, please follow these Microsoft Project guidelines .
Post your Practice Assignment Gantt chart as response to this post.
This practice assignment should be completed by Sunday of Week 2.
This is an ungraded assignment. However, completion of this assignment is required before you are graded on your Project 1.
You must start a thread before you can read and reply to other threads
Learning Microsoft Project - Some helpful Videos
1. Microsoft Project Professional 2019 - Full Tutorial for Beginners [+ Overview]: - 13:46 https://www.youtube.com/watch?v=eOrU6hJ64HY
2. Microsoft Project 2019 Tutorial: The Project 2019 Workspace: - 14:56 https://www.youtube.com/watch?v=T9i8_12oDT4&list=PLzj7TwUeMQ3jo_PtA6h6LNhvMbWNtJsXL&index=2
3. Microsoft Project 2019 Tutorial: Project Task Basics: - 10:19 https://www.youtube.com/watch?v=iq5ceh6q4pE
Course Resource
Microsoft Project Guidelines
Microsoft Project is a powerful project management tool designed to help you generate important parts of your project management plan. If you have not used Project before, be sure to budget time to learn how to use the features you will need for this project.
Ask your instructor if you do not know how to gain access to Microsoft Project.
Finding Tutorials
For assistance with common tasks in Microsoft Project such as those listed below, enter these exact phrases in the search box:
· "Project help—Office Support"
· "Basic tasks in Project"
· "Show the critical path of your project"
· “How Project schedules tasks: Behind the scenes”
· “Office Quick Starts—Office Support” (Click the first link returned by the search engine. Scroll down to Standalone Apps and click Project Quick Start)
· "Microsoft Project support resources"
· "Microsoft Project Videos and Tutorials"
Creating Your Gantt Chart
Your team should have drafted a work breakdown structure based on the provided template. Open a new blank project to begin and follow these steps:
· Verify your view is Gantt view. When this view is turned on, the Gantt chart will fill in on the right side of your screen as you add tasks, with dates on the left.
· Make sure that you use “auto-scheduled” task mode for all tasks.
· Enter tasks.
1. Use the indent key to create subtasks
2. Turn your task list into a work breakdown structure, and insert outline numbers, if needed.
3. Set duration for each regular task. Don’t set duration for summary tasks. The program automatically calculates them.
4. Link all regular tasks, also called adding task dependencies. Don’t link summary tasks.
5. Create milestones, if desired.
6. Identify the critical path in red.
© 2024 University of Maryland Global Campus
All links to external sites were verified at the time of publication. UMGC is not responsible for the validity or integrity of information located at external sites.
Learning Topic
Critical Path
The critical path concept is used by project managers to determine the latest completion date for a project. The term path is used figuratively, to denote navigating a complex set of project tasks and critical activities that will lead to the latest possible completion date. In the sample project network diagram below, the critical path is illustrated with a red line.
The Critical Path
Source: Illes
An estimated project completion date can be identified after three steps have been completed: (1) the deliverables have been identified in the work breakdown structure, (2) the duration needed for each activity to produce deliverables (with the triple constraints in mind) has been determined, along with the earliest start, earliest finish, latest start, and latest finish dates, and (3) the dependencies between activities have been represented (Jones, 2008). A dependency usually means that an activity cannot begin without the deliverables from one or more preceding activities. You might think of the critical path as the longest set of project activities that must be completed in a defined order. If a delay occurs in any activity on the critical path, the project completion date will be moved by an equal amount of time. On the other hand, it is likely that relatively short delays in activities that do not lie on the critical path will not cause a change to the project completion date.
References
Jones, C. (2008). Moving from the WBS to a critical path schedule. Paper presented at PMI Global Congress 2008—North America, Denver, CO. Newton Square, PA: Project Management Institute.
Licenses and Attributions
5n PERT graph with critical path by Illes is in the public domain. UMGC has modified this work.
© 2024 University of Maryland Global Campus
All links to external sites were verified at the time of publication. UMGC is not responsible for the validity or integrity of information located at external sites.
4. Microsoft Project 2019 Tutorial: Project Task Basics (Part 2): - 12:41 https://www.youtube.com/watch?v=jgLhu8IHnfo
5. Microsoft Project 2019 Tutorial: Dependencies in MS Project: - 16:17 https://www.youtube.com/watch?v=bIMO3MSfLgY&list=PLzj7TwUeMQ3jo_PtA6h6LNhvMbWNtJsXL&index=4
6. Microsoft Project 2019 Tutorial: Summary Tasks and Outlining in Project: - 18:10 https://www.youtube.com/watch?v=MuxevgrxOaI&list=PLzj7TwUeMQ3jo_PtA6h6LNhvMbWNtJsXL&index=3
7. Microsoft Project 2019 For Beginners: Introductory Course: https://simonsezit.lpages.co/project-2019-free-course/
image1.png
- discussion 8 101
- managerial economic 2
- IT Milestone
- The report should be typed in a 12-point font and in double-spaced format. The length of the report should be at least 500 words and must include a word count. Please include three clearly marked sections: Part 1. Describe the concert in as much detail a
- R code
- week3 project2
- Climate change
- PART ONE: HOW COMPANIES MAKE FINANCIAL DECISIONS Introduction Financial decision making forms an important part of the normal operations of a company. These financial decisions are facilitated by the management in consultation with the finance department
- Angelica Perez yesterday at 8:58 PM I noticed that the sample of people used was pretty small, perhaps a bigger group to go off would have been more beneficial. For this particular research it would be interesting to see if culture or state (U.S) has a
- Research Instructional Leadership Responsibilites For this assignment you will write a paper that addresses the questions listed below. Locate relevant research articles to answer the following questions: What are your major instructional responsibiliti