POWERPOINT 10 PAGES AND CALCULATIONS ON WORD/EXCEL
MobileGo Project Recovery
The project management office or project office (PMO) is concerned that the MobileGo project is behind schedule and in danger of being late. Assume that a project meeting has been scheduled so that you and your project team can propose a course of action to reduce the project schedule. The PMO has provided your team with project simulation data spreadsheet . To prepare for this PMO meeting, carry out the following:
- Analyze the data provided in the spreadsheet, and calculate at least two options for crashing the schedule.
- Identify likely risks associated with your revised schedule as well as your strategy for their mitigation.
- Evaluate concerns associated with the motivation of the team given the increase in project complexity, the additional overtime, and the high-pressure environment that the team is likely to face.
- Explain the steps you will take as project manager to hold the team together and keep it functioning despite the difficulty.
Complete the crash calculations and options in a Word or Excel document, and submit it for grading. Additionally, you will create a PowerPoint presentation of at least 10 slides that explains your crash plan as well as your overall plan to successfully lead the team to the finish line. Use at least one outside source to support your recommendations for improvement. All sources used, including the textbook, must be referenced; paraphrased and quoted material must have accompanying citations following proper APA Style. You must either use speaker notes or audio to fully explain your slides. Be sure to elaborate in your speaker notes or audio; do not simply repeat the text from your slides.
5 years ago
40
- Our class picks up at the end of the Civil War, in 1865, as the nation was trying to piece itself back together. Based on Chapter 16, the lecture, scenario, and Instructor Insights, do you think Reconstruction (1865-77) was a success or a failure? Explai
- a. What is the probability that A occurs? (Round your answer to 2 decimal places.) Probability:
- An analyst estimates that the probability of default on a seven-year AA-rated bond is 0.50, while
- 1.a) Develop a 94% confidence interval estimate on the fare between the two airports for XYZ.
- cloud computing
- Investigating Data Theft
- A furniture company manufactures tables and chairs. Each table and chair must be made entirely
- english essay
- system analysis and design
- Anatomy for speech and hearing class