Migration from local to Cloud Infrastructure
Deliverables
You company has been allocated an unlimited budget to move to a virtualization infrastructure. The current IT infrastructure exists on bare metal with no virtualization implemented at all.
The current infrastructure contains the following components:
2 x Windows 2008 R2 Domain Controllers
2 x Exchange 2013 Servers
1 x SQL 2012 Server
1 x Red Hat 7.0 Apache Server
2 x Windows 2008 R2 Servers as File Servers
Your task is to do the following:
1) Provide a cost and description of the new hardware you will be implementing
2) Develop a migration plan to move all current infrastructure to virtualization (this also means 0 downtime)
3) Identify and Upgrade the old operating systems and software in the current infrastructure
4) Expand the current infrastructure to include new technologies (eg. An MDM solution)
Please create a detailed report on the tasks above.
6 years ago
15
- EDU 675 Change Leadership for the Differentiated Educational Environment
- Jackson, Inc.
- Statistics Help?
- COMPLETED
- Population Growth
- Your college has also been working on this data set
- Assignment for Nancy
- You have been hired to help a company that has networks in Nashville, Tennessee and Toronto, Canada. The network servers at these locations have changed operating systems to Linux and are having some troubles with their DNS and DHCP configuration
- 0.6 is 10 times as much as ___________? 0.04 is 1/10 of ______________??
- Ticket scalping (selling tickets for above their face value) is often demonized as unfair