I only Need Help With the highlighted part.
I need the help with only Question 8
1.Using the following labor and material rates calculate the cost to provide and install the WWF and pour the concrete slab.
Productivity rate for slab = 0.4 labor hours/cy
Productivity rate for WWF = 1 labor hour/roll
Labor rate for slab and WWF = $14.50/hr