Fork lefter project
hello I need:
- read the client brief file first.
- A hand sketch and then the sketch.
- Soled work and auto-cad drowning of the Fork lefter, and a PDF file far A3 and A4 for both program.
- I need the table of specification for mild steel and Aluminime and the source in Harvard Referencing .
- I need a calculation of the center of gravity the reactions and the tension the calculation for the Fork lefter and the DC motor with will operate the fork left.
- I need a calculation of the center of gravity the reactions and the tension the calculation for the Fork lefter and the DC motor with will operate the fork left. calculation typed in word with list of the simple meaning.
- A steel cable will be used to move the Fork.
- the material of the project will be mild steel or Aluminium.
- read the attachment file for information of the sign.
- read the client brief file first.
8 years ago
25
Answer(1)![blurred-text]()
![]()
Purchase the answer to view it

NOT RATED
- Engdesignforkliftandmotor.zip
other Questions(10)
- yhtomit
- Can someone complete by deadline
- HR Discussion Qusetion 2-page long
- Week 7 checkpoint introductions and conclusions
- ACCT 301 Quiz 1 (ALL CORRECT)
- 8a
- Data 1
- Need someone to write an 8 page paper on the genetic connection of hypertension to cardiovascular disease in african americans?
- Seminar Engineering
- For Researcher_D
