CIS517 WEEK5 ASSIGNMENT3 VOIP PART1 (WORK BREAKDOWN STRUCTURE)...GUARANTEED A+ ASSIGNMENT! GOOD LUCK

profileAlvin
 (Not rated)
 (Not rated)
Chat

 

CIS 517 WEEK 5 ASSIGNMENT 3 VOIP PART 1 (WORK BREAKDOWN STRUCTURE) Summary

  Overview
    As the project manager for an IT department, you have been assigned  to manage the project of deploying a new VoIP phone system to the  company’s campus. The campus consists of three (3) different buildings,  each with twenty to fifty (20 to 50) workstations. The project must be  completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1.     Write a one to two (1-2) page summary document in which you:

a.     Summarize the project requirements and other assumptions (e.g., budget,  human resources, workload, environmental dependencies, etc.).

b.    Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be  typed, double spaced, using Times New Roman font (size 12), with  one-inch margins on all sides; citations and references must follow APA  or school-specific format. Check with your professor for any additional  instructions.
  • Include a cover page containing the title of the  assignment, the student’s name, the professor’s name, the course title,  and the date. The cover page and the reference page are not included in  the required assignment page length.
    • 7 years ago
    CIS517 WEEK5 ASSIGNMENT3 VOIP PART1 (WORK BREAKDOWN STRUCTURE)...GUARANTEED A+ ASSIGNMENT! GOOD LUCK
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      CIS517WEEK5ASSIGNMENT3VOIPPART1WORKBREAKDOWNSTRUCTURE.docx