Business Finance - Operations Management Week One Assignment

profiledream86
  • 8 days ago
  • 30
files (3)

WeekOneAssignment1InstructionsHM.docx

Week One Assignment

Top of Form

Turnitin™

This assignment will be submitted to Turnitin™.

Instructions

The main tool this week is Material Requirements Planning (MRP).

PIMS, Inc., has been manufacturing plumbing equipment since 1999. Because of the depressed economic conditions, component parts are assembled in batch runs. At any given time, each level of production has several partially assembled components. Given the following assembly and inventory information, construct a product structure diagram for the oil leak valve, and plan the order releases necessary to assemble 400 oil leak valves for period 10.

Description of the Production Process

Production of the valve begins with the base. The base is placed and secured in a housing. Ball bearings are then installed on opposing sides of the base housing. The rear base cover is fitted on and held while the front cover is secured with U-bolts. Next, the anchor assembly is connected. Finally, two sets of brackets are screwed on and the oil leak valve is checked before shipping.

Assume the use of the multiple of fixed lot sizes technique.

1. First, draw a diagram of the B.O.M. for this product.

2. Then, using Excel, complete the MRP record for the Oil Leak valve and all subcomponents. Use this template:   Week 1 - MRP Assignment.xlsx

3. Next, using the attached spreadsheet, consider the options for the next six months for short-range capacity planning for Oil Leak valve assemblies as discussed on pg. 218. Determine which approach allows for the lowest total cost given:   Week 1 - Capacity Planning Sheet.xlsx

·

·

Data

 

Beginning Inventory

0

Beginning Workers

20

St. Time Hrs. per worker per month

160

Max. OT Hours per worker per month

40

Hiring Cost per worker

$4,000

Layoff Cost per worker

$5,000

St. Time Pay per worker per hour

$18

OT Pay per worker per hour

$25

Labor Hours per unit produced

10

Raw Materials Cost per unit

$10

Holding cost per unit per month

$2

Shortage Cost per unit per month

$5

Subcontracting Cost per unit

$120

4. Finally, explain what you did in this assignment with regards to MRP and Capacity Planning as if you were describing the concepts to someone unfamiliar with Operations and Supply Chain Planning.

Bottom of Form

Rubric Name: Week One assignment rubric

image1.png