1 / 20100%
C R
Introduction
and
Conclusion
20 to >17.0 pts
Advanced
The introduction is
succinct and embodies
the project’s primary
objectives and
outcomes. The
introduction constructs
the purpose of the
system. A compelling
and justifiable
conclusion is developed
that supports the key
outcomes, managerial
implications, and
limitations of the design.
More than 5 scholarly
sources and 500 words
combined.
17 to >16.0 pts
Proficient
The introduction and
conclusion are succinct
and embody most of the
project’s primary
objectives and outcomes,
and/or the introduction
constructs an unclear
purpose of the system
and/or a justified
conclusion is developed
that supports the key
outcomes, managerial
implications, and
limitations of the design.
Minimum of 5 scholarly
sources and 500 words.
16 to >0.0 pts
Developing
The introduction and/or
conclusion are generalized
and embody some of the
project’s primary objectives,
managerial implications,
design limitations, and
outcomes and/or has less
than the minimum of 5
scholarly sources and 500
words and/or is not
defensible.
0 pts
Not
Present
20 pts
IT Infrastructure Project: Designing LAN Networks Grading Rubric |
BMIS520_B01_202220
C R
Literature
Review
40 to >36.0 pts
Advanced
Explanations of the
design running
configurations show
mastery of each
concept. The review of
literature is related to
the primary problems of
the re-design. It
thoroughly addresses
system feasibility,
performance, RAS
(reliability, availability,
serviceability), security,
and disaster recovery.
Premier scholarly
journal articles support
the design by
comparing, contrasting,
and outlining proper
standards and objective
research results
necessary to improve
the system. Over 1,000
words and 10 unique
scholarly journal articles
that are relevant to the
infrastructure model.
Router and switch
running configurations
included in appendices.
36 to >33.0 pts
Proficient
Explanations of the
design running
configurations show
comprehension of each
concept. The review of
literature is mostly related
to the primary problems of
the re-design and/or it
addresses system
feasibility, performance,
RAS (reliability,
availability, serviceability),
security, and disaster
recovery and/or it uses
scholarly journal articles
detailing the research and
outcomes of the research,
comparing, contrasting,
and outlining proper
standards and objective
research results
necessary to improve the
system and/or includes a
minimum of 1,000 words
and/or 8 unique scholarly
journal articles that are
relevant to the
infrastructure model.
Router and switch running
configurations included in
appendices.
33 to >0.0 pts
Developing
Explanations of the design
running configurations show
partial comprehension of
each concept and/or the
review of literature is not
directly related to the
primary problems of the
re-design and/or it does not
address system feasibility,
performance, RAS
(reliability, availability,
serviceability), security, and
Students also viewed