New skills building.

profilecanada2016
WRD_FinMan14e_EX12-061.xlsx

Ex. 26(12)-6

Exercise 26(12)-6
Name: 0
Section: # N-box Incorrects due to blanks COUNTIF(B15:AT24," ")
30
Score: 0% # N-box +B-box corrects COUNTIF(B15:AT24," ")
0
Key Code: [Key code here] Total SUM(AD13:AD15)
Instructions 30
Answers are entered in the cells with gray backgrounds. Percentage =(AD16-AD13-AD14)/AD16
Cells with non-gray backgrounds are protected and cannot be edited. 0%
An asterisk (*) will appear to the right of an incorrect entry. Notes:
Enter a zero in cells you would otherwise leave blank. If number-entry box is blank (this would be an incorrect answer for N-boxes), error check returns two spaces, " "
If number-entry or blank-entry box is incorrect, returns "*"
If number-entry or blank-entry box is correct, returns single space, " "
Traditional Philosophy
Value-Added Non-Value- Total
Time Added Time Time
Value-added time
Within batch wait time
Move time
Total
Value-Added Time / Total Time = Value-Added Ratio
Lean Manufacturing Philosophy
Value-Added Non-Value- Total
Time Added Time Time
Value-added time
Peggy Hussey: Milling and finishing time per part

Peggy Hussey: Milling and finishing time per part
Within batch wait time
Peggy Hussey: Multiply the process time by the remaining units in the batch (waiting their turn).

Peggy Hussey: Multiply the process time by the remaining units in the batch (waiting their turn).
Move time
Total
Value-Added Time / Total Time = Value-Added Ratio

Sol

Exercise 26(12)-6
Name: Solution
Section:
Score: ON
Instructions
Answers are entered in the cells with gray backgrounds.
Cells with non-gray backgrounds are protected and cannot be edited.
An asterisk (*) will appear to the right of an incorrect entry.
Enter a zero in cells you would otherwise leave blank.
Traditional Philosophy
Value-Added Non-Value- Total
Time Added Time Time
Value-added time 12
Peggy Hussey: Milling and finishing time per part
- 12
Within batch wait time - 348
Peggy Hussey: Multiply the process time by the remaining units in the batch (waiting their turn).
348
Move time - 5 5
Total 12 353 365
Value-Added Time / Total Time = Value-Added Ratio
12 365 3.3%
Lean Manufacturing Philosophy
Value-Added Non-Value- Total
Time Added Time Time
Value-added time 12
Peggy Hussey: Milling and finishing time per part

Peggy Hussey: Milling and finishing time per part
- 12
Within batch wait time - 36
Peggy Hussey: Multiply the process time by the remaining units in the batch (waiting their turn).

Peggy Hussey: Multiply the process time by the remaining units in the batch (waiting their turn).
36
Move time - - -
Total 12 36 48
Value-Added Time / Total Time = Value-Added Ratio
12 48 25.0%