Calculating values using network diagram, baseline, and status information, in excel
Individual Assignment #4 MGMT8400
· This assignment is to be completed on an individual basis. Do not complete as partners or groups!
· You must complete the assignment using MS Excel. The Excel spreadsheet must calculate the EVM values using formulae. The assignment must be handed in using MS Excel format. Assignments completed using PDF format or by copying the information into any other format WILL NOT be accepted. The instructor must be able to see the formulae within MS Excel cells.
· Graphs must be properly labelled including X and Y Axis and a Title
· Include title page information at the top of the MS Excel worksheet including your name and student number.
· If applicable, include a bibliography noting sources used.
Deliverables
Use the network diagram, baseline, and status information to developthe following information:
· Complete the status reports for periods 1 through 6 by computing the values for EV, PV, CV and SV. Calculations/formulae must be included.
· For each period, add a written commentary about the status of the project based on the computed values.
· Create a graph depicting (showing) AC and PV over the duration of the status reports.
· Create a graph depicting (showing) EV, SV and CV over the duration of the status reports.
· Complete the summary table by computing the values for SPI, CPI and PCIB.
· Create a third graph representing the information in the summary table.
· Provide a written assessment of the expected status of the project at completion.
Note the difference between how the values are represented Schedule Information table and the Status Reports.
Status Report: Ending Period 1
|
Task |
% Complete |
EV |
AC |
PV |
CV |
SV |
|
1 |
50% |
|
500 |
1000 |
|
|
|
Cumulative Totals |
|
500 |
1000 |
|
|
|
|
Period Commentary |
|
Status Report: Ending Period 2
|
Task |
% Complete |
EV |
AC |
PV |
CV |
SV |
|
1 |
100 |
|
1500 |
|
|
|
|
Cumulative Totals |
|
1500 |
|
|
|
|
|
Period Commentary |
|
Status Report: Ending Period 3
|
Task |
% Complete |
EV |
AC |
PV |
CV |
SV |
|
1 |
100 |
|
1500 |
|
|
|
|
2 |
0 |
|
0 |
|
|
|
|
3 |
10 |
|
200 |
|
|
|
|
4 |
20 |
|
500 |
|
|
|
|
Cumulative Totals |
|
2200 |
|
|
|
|
|
Period Commentary |
|
Status Report: Ending Period 4
|
Task |
% Complete |
EV |
AC |
PV |
CV |
SV |
|
1 |
100 |
|
1500 |
|
|
|
|
2 |
50 |
|
1000 |
|
|
|
|
3 |
30 |
|
800 |
|
|
|
|
4 |
40 |
|
1500 |
|
|
|
|
Cumulative Totals |
|
4800 |
|
|
|
|
|
Period Commentary |
|
Status Report: Ending Period 5
|
Task |
% Complete |
EV |
AC |
PV |
CV |
SV |
|
1 |
100 |
|
1500 |
|
|
|
|
2 |
100 |
|
2000 |
|
|
|
|
3 |
50 |
|
800 |
|
|
|
|
4 |
60 |
|
1500 |
|
|
|
|
5 |
25 |
|
400 |
|
|
|
|
Cumulative Totals |
|
6200 |
|
|
|
|
|
Period Commentary |
|
Status Report: Ending Period 6
|
Task |
% Complete |
EV |
AC |
PV |
CV |
SV |
|
1 |
100 |
|
1500 |
|
|
|
|
2 |
100 |
|
2000 |
|
|
|
|
3 |
80 |
|
2100 |
|
|
|
|
4 |
80 |
|
1800 |
|
|
|
|
5 |
50 |
|
600 |
|
|
|
|
Cumulative Totals |
|
8000 |
|
|
|
|
|
Period Commentary |
|
Indexes
|
Period |
SPI |
CPI |
PCIB |
|
1 |
|
|
|
|
2 |
|
|
|
|
3 |
|
|
|
|
4 |
|
|
|
|
5 |
|
|
|
|
6 |
|
|
|
Formulae useful for this assignment