ACG4342 - Writing Project - Part 3

profileTico
Week2WritingProject.xlsx

Problem

PopUp Company produces two types of toasters, basic and deluxe. For the current period, the company reports the following data:
Basic Toaster Deluxe Toaster
Volume 20,000 units 5,000 units
Machine Hours 1,000 2,400
Batches 315 125
Engineering Modifications 20 50
Prime Costs $20,000 $30,000
Market Price $25 per unit $60 per unit
Additional Information Follows
Costs Driver
Engineering Support $15,900 Engineering Modifications
Electricity 25,000 Machine Hours
Setup costs 33,900 Batches
1) Compute the manufacturing cost per unit of each toaster using the current unit-based approach.
Under this system costs are assigned to the toasters on the basis of machine hours.
2) Compute the manufacturing cost per unit of each toaster using an activy-based costing approach
1) Manufacturing Cost Per Unit Of Each Toaster Using The Current Unit-Based Approach 2) Manufacturing Cost Per Unit Of Each Toaster Using An Activity-Based Costing Approach:
Total Overhead Costs Activities Cost Pool Cost Driver Cost Driver Quantity Cost Driver Rate
Engineering Support $15,900 Engineerong Support $15,900 Engineering Modifications 70 $227.14 per engineering modification
Electricity $25,000 Electricity $25,000 Machine Hours 3,400 $7.35 per machine hour
Setup Costs $33,900 Setup Costs $33,900 Batches 440 $77.05 per batch
$74,800
Item Cost Basic Toaster Cost Deluxe Toaster Cost
Total Machine Hours For Both Types Of Toasters
A. Prime Cost $20,000.00 $30,000.00
Basic Toaster 1000 Machine Hours B. Manufacturing Overhead Cost Driver Quantity Activity Based Cost Cost Driver Quantity Activity Based Cost
Deluxe Toaster 2400 Machine Hours Engineering Support ($227.14 per engineering modification) 20 $4,542.86 50 $11,357.14
3400 Electricity ($7.35 per machine hour) 1,000 $7,352.94 2,400 $17,647.06
Setup Costs ($77.05 per batch) 315 $24,269.32 125 $9,630.68
Overhead Absorption Rate Per Machine Hour Total Manufacturing Overhead $36,165.12 $38,634.88
C. Total Manufacturing Cost (A+B) $56,165.12 $68,634.88
Total overhead costs/Total machine hours for both types of toasters D. Total Number Of Units Produced 20,000 5,000
$74,800 E. Manufacturing Cost Per Unit (C/D) $2.81 $13.73
3400
$22 per machine hour
Manufacturing Cost Per Unit For Basic Toaster
Total manufacturing cost of Basic Toaster:
Prime Costs $20,000
Total Overhead Costs Allocated (1000 x $22) $22,000
$42,000
Manufacturing cost per unit = Total manufacturing cost/Number of units
Manufacturing cost per unit = $42,000
20,000
$2.10 per unit
Manufacturing Cost Per Unit For Deluxe Toaster
Total manufacturing cost of Deluxe Toaster:
Prime Costs $30,000
Total Overhead Costs Allocated (2,400 x $22) $52,800
$82,800
Manufacturing cost per unit = Total manufacturing cost/Number of units
Manufacturing cost per unit = $82,800
5,000
$16.56 per unit