Learning Objectives
Define layout planning and explain its importance.
Identify and describe different types of layouts.
Describe the steps involved in designing a process
layout.
Describe the two special cases of process layout.
Describe the steps involved in designing a product
layout.
Explain the meaning of group technology (cell) layouts.
2
Copyright © 2016 John Wiley & Sons, Inc.
What Is Layout Planning?
Deciding the best physical arrangement of all resources that
consume space within a facility
Facility resource arrangement can significantly affect
productivity
Two broad categories of operations:
Intermittent processing systems – low volume of many different
products
Repetitive processing systems – high volume of a few standardized
products
3
Copyright © 2016 John Wiley & Sons, Inc.
Types of Layouts
Four basic layout types:
Process layouts - Group similar resources together
based on similar processes/functions
Product layouts - Designed to produce a specific
product efficiently
Hybrid layouts - Combine aspects of both process and
product layouts
Fixed-Position layouts - Product is two large to move;
e.g. a building
4
Copyright © 2016 John Wiley & Sons, Inc.
Process Layouts
Unique characteristics include: Resources used are general purpose
Facilities are less capital intensive
Facilities are more labor intensive
Resources have greater flexibility
Processing rates are slower
Material handling costs are higher
Scheduling resources & work flow is more complex
Space requirements are higher
5
Examples: Hospital University Metalworking shop Department store Tool & Die Manuf. Wal-Mart
Copyright © 2016 John Wiley & Sons, Inc.
Product Layouts
Unique characteristics are:
Resources are specialized
Facilities are capital intensive
Processing rates are faster
Material handling costs are lower
Space requirements for inventory storage are lower
Flexibility is low relative to the market
6
Examples: Assembly lines See’s Candies Cafeterias Car Wash Toyota
Copyright © 2016 John Wiley & Sons, Inc.
Process vs. Product Layouts 7
Copyright © 2016 John Wiley & Sons, Inc.
Hybrid Layouts
Combine elements of both product & process
layouts
Maintain some of the efficiencies of product layouts
Maintain some of the flexibility of process layouts
Group technology or cell layouts
Identification of parts of the process layout operation that
can be standardized and produce them in a product layout
format
8
Examples: Winnebago Retail stores Grocery stores
Copyright © 2016 John Wiley & Sons, Inc.
Fixed-Position Layout
Used when product is large
Product is difficult or impossible to move, i.e. very
large or fixed
All resources must be brought to the site
Scheduling of crews and resources is a challenge
9
Examples: Construction Dam Bridge Shipbuilding Aircraft Manuf.
Copyright © 2016 John Wiley & Sons, Inc.
Designing Process Layouts
Step 1: Gather information:
Space needed, space available, identify closeness measures (From-to Matrix, REL, SLP)
Step 2: Develop alternative block plans:
Using trial-and-error or decision support tools (load-distance model, ALDEP, CRAFT)
Step 3: Develop a detailed layout:
Consider exact sizes/shapes of departments and work centers including aisles and stairways
Tools like drawings, 3-D models, and CAD software are available to facilitate this process
10
Copyright © 2016 John Wiley & Sons, Inc.
Special Cases of Process Layouts - Warehouse Layouts
Warehouse Layout Considerations: Primary decision is where to locate each department relative
to the dock
Storage areas of equal sizes Assign departments to locations in order to minimize the
number of trips to the dock.
Storage areas of unequal sizes STEP 1: Take the ratio of the number of trips relative to the
storage area required.
STEP 2: Use the ratios from Step 1 to make assignments. Assign the department with the highest ratio closest to the dock. Next, assign the department with the second-highest ratio second closest to the dock. Continue in this manner until all departments have been assigned.
11
Copyright © 2016 John Wiley & Sons, Inc.
Special Cases of Process Layouts - Office Layouts
Office Layout Considerations: Almost half of US workforce works in an office environment
Human interaction and communication are the primary factors in designing office layouts
Layouts need to account for physical environment and psychological needs of the organization
Key trade-off is between proximity and privacy
Open concept offices promote understanding & trust
Flexible layouts incorporating “office landscaping” help to solve the privacy issue in open office environments
12
Copyright © 2016 John Wiley & Sons, Inc.
Designing Product Layouts
Designing product layouts requires consideration of:
Sequence of tasks to be performed by each workstation
Logical order
Speed considerations – line balancing
13
Copyright © 2016 John Wiley & Sons, Inc.
Designing Product Layouts – cont'd
Step 1: Identify tasks & immediate predecessors
Step 2: Determine output rate
Step 3: Determine cycle time
Step 4: Compute the Theoretical Minimum number
of Stations
Step 5: Assign tasks to workstations
(balance the line)
Step 6: Compute efficiency, idle time &
balance delay
14
Copyright © 2016 John Wiley & Sons, Inc.
Step 1: Identify Tasks & Immediate Predecessors
Example 10.4 Vicki's Pizzeria and the Precedence Diagram
Immediate Task Time
Work Element Task Description Predecessor (seconds A Roll dough None 50
B Place on cardboard backing A 5
C Sprinkle cheese B 25
D Spread Sauce C 15
E Add pepperoni D 12
F Add sausage D 10
G Add mushrooms D 15
H Shrinkwrap pizza E,F,G 18
I Pack in box H 15
Total task time 165
15
Step 2: Determine Output Rate
Output Rate is the number of units to be produced over a
specific period of time
Vicki needs to produce 600 pizzas per hour
Vicki will need to divide the work among a number of
people simultaneously at workstations
The goal is to design a product layout that can produce the
desired number of units with the least amount of work
centers and a balance of workload
16
hourper pizzas 8.12 sec./unit 165
sec./hr. 3600 output M aximum ==
Step 3: Determine Cycle Time
Determine cycle time calculations
The amount of time each workstation is allowed to complete its
tasks
Limited by the bottleneck task (the longest task):
Minimum cycle time = bottleneck
Maximum cycle time = sum of the task times
( ) ( )
sec./unit 60 units/hr 60
sec/min 60x min/hr 60
units/hroutput desired
sec./day time available )(sec./unit time Cycle ===
hourper pizzas 8.12 sec./unit 165
sec./hr. 3600 output Maximum ==
17
Copyright © 2016 John Wiley & Sons, Inc.
Step 4: Theoretical Minimum Number of Stations
Computing the theoretical minimum (TM) number of stations
TM = number of stations needed to achieve 100% efficiency (every second is used)
Always round up (no partial workstations)
Serves as a lower bound for our analysis
( ) stations 3or 2.75,
nsec/statio 60
seconds 165
time cycle
times task TM ===
18
Copyright © 2016 John Wiley & Sons, Inc.
Step 5: Assign Tasks to Workstations
Assigning tasks to workstations (Balance the Line)
Start at the first station & choose the longest eligible task following precedence
relationships
Continue adding the longest eligible task that fits without going over the desired cycle
time
When no additional tasks can be added within the desired cycle time, begin assigning
tasks to the next workstation until finished
19
Step 6: Efficiency and Balance Delay
Computing efficiency and balance delay
Efficiency (%) is the ratio of total productive time divided
by total time
Balance delay (%) is the amount by which the line falls
short of 100%
( ) 91.7%100 sec. 60x stations 3
sec. 165
NC
t (%) Efficiency ===
8.3%91.7%100%delay Balance =−=
20
Copyright © 2016 John Wiley & Sons, Inc.
Other Product Layout Considerations
Shape of the line (S, U, O, L): Share resources, enhance communication & visibility, impact
location of loading & unloading
Paced versus Un-paced lines Paced lines use an automatically enforced cycle time
Un-paced has more autonomy; product may be removed off assembly line
Number of Product Models produced Single-model lines – one version of a product
Mixed-model lines – many versions of a product
21
Group Technology (CELL) Layouts
One of the most popular hybrid layouts uses Group Technology (GT) and a cellular layout
GT has the advantage of bringing the efficiencies of a product layout to a process layout environment
22
Copyright © 2016 John Wiley & Sons, Inc.
Process Flows Before and After The Use of GT Cells
23
Copyright © 2016 John Wiley & Sons, Inc.
Facility Layout Within OM: How It All Fits Together
Layout decisions are directly related to issues of product design and process selection (Ch 3).
Job design, as process layouts tend to require greater worker skills than do product layouts (Ch 11).
Degree of automation, as product layouts tend to be more capital intensive and use more automation compared to process layouts (Ch 3).
Layout decisions are also affected by implementation of just-in- time (JIT) systems, which dictate a line flow and the use of group technology (GT) cells (Ch 7).
As layout decisions specify the flow of goods through the facility, they impact all other aspects of operations management.
24
Copyright © 2016 John Wiley & Sons, Inc.
Facility Layout Across The Organization
Layout planning is organizationally important for an
efficient operations
Marketing is affected by layout especially when clients come to
the site
Human Resources is affected as layout impacts people
Finance is involved as layout changes can be costly endeavors
25
Copyright © 2016 John Wiley & Sons, Inc.
Chapter 10 Highlights
Layout planning is deciding on the best physical arrangement of all resources that consumes space within a facility. Proper layout planning is highly important for the efficient running of a business. Otherwise, there can be much wasted time and energy, as well as confusion.
There are four basic types of layouts: process, product, hybrid, and fixed position. Process layouts group resources based on similar processes. Product layouts arrange resources in straight- line fashion. Hybrid layouts combine elements of both process and product layouts. Fixed-position layouts occur when the product is larger and cannot be moved.
26
Copyright © 2016 John Wiley & Sons, Inc.
Chapter 10 Highlights – cont'd
Process layouts provide much flexibility and allow for the production of many products with differing characteristics.
Product layouts, on the other hand, provide greater efficiency when producing one type of product.
The 3 steps for designing process layouts are (1) gather information about space needs, space availability, and closeness requirements of departments; (2) developing a block plan or schematic of the layout; and (3) developing a detailed layout.
27
Copyright © 2016 John Wiley & Sons, Inc.
Chapter 10 Highlights – cont'd
The 6 steps for designing an product layout are (1) identify
tasks that need to be performed and their immediate
predecessors; (2) determine output rate; (3) determine cycle
time; (4) computing the theoretical minimum number of work
stations, (5) assigning tasks to workstations; and (6) computing
efficiency and balance delay.
Hybrids layouts have advantages over other layout types
because they combine elements of both process and product
layouts to increase efficiency.
28
Copyright © 2016 John Wiley & Sons, Inc.
Chapter 10 Highlights – cont'd
An example of hybrid layouts is group technology or cell
layouts. Group technology is the process of crating groupings
of products based on similar processing requirements. Cells are
created for each grouping of products, resulting in a more
orderly flow of products through the facility.
29