WBS Task Task action Duration Predecessor Resources
Purchase Pay for necessary expertise. I day Explor different skills available.
1 Servers, laptopts and Desktop PC will be purchased 4 days 4 network servers
1.1 Deploy The servers will be station and necessary drivers that ensures a reliable internet connection will be intalled (Jin, 2019) A desktop PC
5 days Identifying a physical networking location. 2 laptops
2 VOIP phones
Laptops and PCs will be loaded with necessary software. 3 days Buy necessary softwares A networking specialist
1.2 Testing Testing the networking software. 2 days Networking software
Test servers to ensure that expected output is produced. Testing may involve the precense of network end users. (Zhou et al, 2019) A cabled network
Pc specialist
3 days Employ the best network analyts in the market. AV specialist
Network specialist
VOIP phones to be tested and placed at specfic location.
Different type of system testing for example betta testeng will be conducted. 1 day
Test wireless systems to ensure they can all access the network.
1 day
ADMINISTRATIVE AREA
Task Task action Duration Predecessor Resources
Purchase purchase VOIP phones. 1 day Do a market research Four workstations.
Purchase a networked copiers 1 day Four desktop PC
Pay for various expertise. 12 hrs Conduct interactive interviews A cabled network
2 Purchase Desktop PCs and laptops. 1 day Four VOIP phones in each work station
Deploy Place VOIP phones at their specified locations. Networked copier
Laptops and PCs will be loaded with necessary software. PC specialist
12 hrs Network specialist
Station printers and copiers at an accessible location 1 day AV specialist
2.1 Place VOIP phones at their specified locations. 12 hrs
Testing Test VOIP phones to ensure they function properly across the network. 6 hrs
Test wireless systems to ensure they can all access the network. Test various user acceptance.
12 hrs
Test for other alternative networking software 6 hrs Introduce various Operating Systems.
Determine maintenance procedures. 12 hrs Training maintenance personel
2.2 Test for compatibility with other software and hardware devices. 12 hrs Introduce compatible devices and softeares.
CONFERENCE ROOMS
Task Task action Duration Predecessor Resources
Purchase Pay for various expertise. 3 hrs Conduct a market research.
3 The best Projectors will be sourced. 12 hrs Involve management in resource sourcing. A wireless ceiling mounted projector.
Deploy Establish a wireless connection. 12 hrs A VOIP phone.
VOIP phones will be placed at their specific location 3 hrs PC specialist
Projectors will be stationed at their specific possotions. AV specialist
3.1 3 hrs Lay down basic security procedures Network specialist
Testing Test VOIP phones to ensure they function properly across the network.
3 hrs
Desktops and laptops will be set to access projectors wirelessly and through cabling. 12 hrs Employ the best Networking specialist.
Test VOIP phones to ensure they function properly across the network. The managhannelment should emphasize on a reliable communication c
3.2 12 hrs
MEETING ROOMS
Task Task action Duration Predecessor Resources
4 Purchase Avail projectors, Pcs, VOIP phones and laptops. Purchase WiFi devices 2 hrs Create modern boardrooms and embrace virtual communication. A wireless ceiling mounted projector.
Deploy Station VOIP phones at their specific lovations 2 hrs A desktop PC
PCs and projectors will be stationed at their specific possotions. A cabled network
4.1 12 hrs Two VOIP phones.
Testing Test VOIP phones to ensure they function properly across the network. Network specialist
2 hrs AV specialist
Test wireless and cabbled connection to ensure less or no internet speed buffering. PC specialist
3 hrs
Desktops and laptops will be set to access projectors wirelessly and through cabling.
3 hrs
Test security softwares and firewalls 12 hrs Introduce public security policies.
Test and maintain WiFi and other public connections. 6 hrs Adverstise for free WiFi to visitors and staff.
4.2
OFFICE
Task Task action Duration Predecessor Resources
Purchase Desktops PCs will be puchased 12 hrs 40 desktop PCs
Purchase VOIP phones. 2 hrs Employ the best AV specialist A cabled network
Purchase projectors. 6 hrs Budget for transport and additional labor, eg Products loading and offloading VOIP phone.
5 Purchase cabling equipement. 4 hrs A wireless ceiling mounted projector.
Deploy Deploy VOIP phones. 2 hrs PC specialist
Place projectors in align to their fuctionality 6 hrs Network specialist
Connect via various wireless protocals (Pothumani et al, 2017) 3 hrs AV specialist
5.1 Establish cabling. 2 hrs
Testing Desktops and laptops will be set to access projectors wirelessly and through cabling.
6 hrs
Test cable connectivity. 1 hrs
Test VOIP phones to ensure they function properly across the network.
3 hrs
5.2
COMPUTER LABS
Task Task action Duration Predecessor Resources
Purchase Desktops PCs will be puchased 2 hrs Explor different markets for different devices A wireless ceiling mounted projector.
Purchase VOIP phones. 2 hrs A desktop PC
Purchase projectors. 2 hrs Determine the best projectors in the market Networking ports
Purchase cabling equipement. 1 hrs A cabled connection.
Pay for various expertise. 1 hrs A projector
6 Purchase a networked copiers 5 hrs Twenty five desktop PCs
Deploy VOIP phones will be placed at their specific location 2 hrs A VOIP phone.
Place projectors in align to their fuctionality 5 hrs A networked copier
Connect via various wireless protocals. 3 hrs AV specialist
6.1 Establish cabling. 1 hrs Network specialist
Testing Desktops and laptops will be set to access projectors wirelessly and through cabling. 6 hrs Pc specialist
Test VOIP phones to ensure they function properly across the network. 3 hrs
Test cabled connectivity. 2 hrs
Test functionality of intalled Desktops 2 hrs
Test projectors. 1 hrs
6.2 Test and impliments a networked printer 2 hrs
References
Jin, C., & Bai, X. (2019). The study of servers’ arrangement and air distribution strategy under partial load in data centers. Sustainable Cities and Society, 49, 101617.
Pothumani, S., & Hameed Hussain, J. (2017). A novel method to manage network requirements. International Journal of Pure and Applied Mathematics, 116(13), 9-15.
Shoaib, N., & Shamsi, J. A. (2019). Understanding network requirements for smart city applications: Challenges and solutions. IT Professional, 21(3), 33-40.

Sheet2

Sheet3