WBS PROJECT PLANING
Work Breakdown Structure for a Wedding (Individual project)
WBS for a Wedding Fall 2021 Page 1 of 2
Overview
The purpose of this Individual assignment is to develop a WBS (Work Breakdown Structure). NOTE: You will need Microsoft Project for this assignment. Since this will be an introduction to Microsoft Project, the scope of the WBS is relatively small.
Assignment for the Wedding WBS
The scenario is this - Your best friend asked you to help plan a wedding in another city. You have no concern for schedule or budget at the moment, only defining the work that needs to be done for the wedding to start on time and to be successful. There will be up to 100 guests.
As there are different ways to organize a WBS, you should choose one of the patterns below. This WBS can be organized by functions or by physical locations, choose just one. Of course, there are other patterns that could be used but these look like logical choices for this project.
WBS Organized by Location WBS Organized by Function
Level WBS Element Level WBS Element
0 The wedding project 0 The wedding project
1 Airport arrangements 1 Event programming
1 Guest hotels 1 Guest arrangements
1 Church arrangements 1 Catering
1 Reception arrangements 1 Musical entertainment
1 Wedding outfits 1 Floral displays
1 Going away outfits 1 Wedding outfitting
1 Honeymoon arrangements 1 Transportation
Things to remember:
• First, change the MS-Project default configuration settings, see the Project Configuration Settings section in "Project Tutorials" (Course Resources → Microsoft Project).
• Don't go overboard on details, i.e., no need to go deeper than WBS Level 3.
• Even though this is a small project, make sure you have enough details, i.e., enough sub-tasks to show how you will complete the Summary Task deliverable.
• Do indent sub-tasks, see the Adding Tasks to the Schedule section in "Project Tutorials" (Course Resources → Microsoft Project).
• Show the WBS column, see Show the Project WBS Numbers section in "Project Tutorials" (Course Resources → Microsoft Project).
Work Breakdown Structure for a Wedding (Individual project)
WBS for a Wedding Fall 2021 Page 2 of 2
• Follow task naming conventions, see "How to Build Work Breakdown Structures" (Week 1 → Readings)
o A sub-task should be named using verb, adjective and noun - there is action performed.
o A Summary task should be named using noun / adjective structure (NO VERBS) - it describes what will be delivered instead of what work will be done.
• No blank rows, i.e.,
• Summary tasks and sub-tasks should address only one (not multiple) deliverable (or action).
• Never use full sentences in the Task Name column of the schedule.
IMPORTANT: The submission file should be named as "LastnameFirstname AssignmentName", such as - MylastnameMyfirstname WBS for a Wedding.mpp
Grading Rubric
Criteria 90-100%
Far Above Standards
80-89%
Above Standards
70-79%
Meets Standards
60-69%
Below Standards
< 60%
Well Below Standards
Possible Points
Configuration Settings
Needed for producing consistent results in the project schedule
18-20 Points
All configuration settings correct
16-17 Points
Missed 1-2 configuration settings
14-15 Points
Missed 3-4 configuration settings
12-13 Points
Missed 4-5 configuration settings
0-11 Points
Missed 5 or more configuration settings
20
WBS Structure
Includes appropriate level of decomposition, uses Project's WBS numbering, requires indenting sub-tasks, and continuous rows
18-20 Points
Correctly decomposed the schedule to Outline Level 3; Did not leave blank rows in the schedule; Did not manually enter WBS numbers
16-17 Points
Decomposed too little (to Outline Level 2), or too much (to Outline Level 4)
14-15 Points
Over-decomposition (to Outline Level 5)
12-13 Points
Far too much decomposition, beyond Outline Level 5
0-11 Points
No decomposition at all, stopped at Outline Level 1; Left blank rows in the schedule; Manually entered WBS numbers
20
Summary Tasks
Uses a specific naming convention, refers to a single deliverable, does not read like a sentence
27-30 Points
All Summary Tasks follow the correct naming structure; Summary Tasks do not use full sentences in the Task Name column; Summary Tasks do not encompass multiple deliverables
24-26 Points
At least two sources are 1-2 Summary Tasks do not follow correct naming structure; 1-2 Summary Tasks use full sentences in the Task Name column; 1-2 Summary Tasks encompass multiple deliverables (should only be one)
21-23 Points
3-4 Summary Tasks do not follow correct naming structure; 3-4 Summary Tasks use full sentences in the Task Name column; 3-4 Summary Tasks encompass multiple deliverables (should only be one)
18-20 Points
5-6 Summary Tasks do not follow correct naming structure; 5-6 Summary Tasks use full sentences in the Task Name column; 5-6 Summary Tasks encompass multiple deliverables (should only be one)
0-17 Points
7 or more Summary Tasks do not follow correct naming structure; 7 or more Summary Tasks use full sentences in the Task Name column; 7 or more Summary Tasks encompass multiple deliverables (should only be one)
30
Sub-Tasks
Uses a specific naming convention, refers to a single action, does not read like a sentence
27-30 Points
All sub-tasks follow correct naming structure; Sub-tasks do not use full sentences in the Task Name column; Sub- tasks do not encompass multiple actions
24-26 Points
1-2 sub-tasks do not follow correct naming structure; 1-2 sub-tasks use full sentences in the Task Name column; 1-2 sub-tasks encompass multiple actions (should only be one)
21-23 Points
3-4 sub-tasks do not follow correct naming structure; 3-4 sub-tasks use full sentences in the Task Name column; 3-4 sub-tasks encompass multiple actions (should only be one)
18-20 Points
5-6 sub-tasks do not follow correct naming structure; 5-6 sub-tasks use full sentences in the Task Name column; 5-6 sub-tasks encompass multiple actions (should only be one)
0-17 Points
7 or more sub-tasks do not follow correct naming structure; 7 or more sub- tasks use full sentences in the Task Name column; 7 or more sub-tasks encompass multiple actions (should only be one)
30