Project: 1313 Mockingbird Lane
Name: Michael Chadukiewicz
Date: 13-Mar-11
ID LEVEL 1 TASK LEVEL 2 TASK LEVEL 3 TASK RESOURCE
1 Foundation
1.1 Footings
1.1.1 Excavate Site John Smith
1.1.2 Place Forms Nancy Post
1.1.3 Place Rebar Bob Johnson
1.1.4 Pour Concrete Nancy Post
1.1.5 Strip Forms Bob Johnson
1.2 Walls
1.2.1 Place Forms Bill Williamson
1.2.2 Place Rebar Bill Williamson
1.2.3 Pour Concrete Bill Williamson
1.2.4 Strip Forms Bill Williamson
1.3 Slab
1.3.1 Place Rebar Nancy Post
1.3.2 Pour Concrete Bob Johnson
1.3.3 Float Concrete John Smith
2 Framing
2.1 Walls
2.1.1 First Floor Adam Smith
2.1.3 Second Floor Adam Smith
2.1.4 Sheathing Adam Smith
2.2 Floors
2.2.1 First Floor Joists Bill Williamson
2.2.2 First Floor - Sub Floor Bill Williamson
2.2.3 Second Floor Joists Bill Williamson
2.2.4 Second Floor - Sub Floor Bill Williamson
2.3 Roof
2.3.1 Roofs Joists Nancy Post
2.2.2 Roof Sheathing Nancy Post
3 Roofing
3.1