| Project: | The Halliburton Company project- Drilling 58 wells |
| Name: |
| Date: | 30-Mar-19 |
| ID | LEVEL 1 TASK | LEVEL 2 TASK | LEVEL 3 TASK | RESOURCE |
| 1 | Finding a solution for the geology issues |
| 1.1 | | Geo-piloting |
| 1.1.1 | | | Excavating Site | Mark Wright |
| 1.1.2 | | | Setting up the floor bed | Mark Wright |
| 1.1.3 | | | Rectifying geological errors (Siami-Irdemoosa, Dindarloo & Sharifzadeh, 2015). | Chris Carter |
| 1.2 | | Pressurizing |
| 1.2.1 | | | Temperature regulation | Mary Kart |
| 1.2.2 | | | Pressure regulation | Mary Kart |
| 1.2.3 | | | Increasing depth | Mary Kart |
| 2 | Foundation |
| 2.1 | | Walls |
| 2.1.1 | | | Place floor | Janet Roosevelt |
| 2.1.3 | | | Pour Concrete | Janet Roosevelt |
| 2.1.4 | | | Place rebars | Janet Roosevelt |
| 2.2 | | Slabs |
| 2.2.1 | | | Place bar | Henry Mosses |
| 2.2.2 | | | Pour Concrete | Henry Mosses |
| 2.2.3 | | | Float concrete(Nath & Phookan, 2015) | Kelvin Batt |
| 3 | Framing |
| 3.1 | | Walls |
| 3.1.1 | | | First support wall | Denzel Mark |
| 3.1.2 | | | Second support wall | Denzel Mark |
| 3.1.3 | | | Firm wall | Denzel Mark |
| 3.2 | | Slabs |
| 3.2.1 | | | Place rebars | Ednah Dominique |
| 3.2.2 | | | Pour concrete (Nath & Phookan, 2015) | Ednah Dominique |
| 3.2.3 | | | Float concrete | Ednah Dominique |
| 4 | Drilling 58 wells |
| 4.1 | | Rigs |
| 4.1.1 | | | Set up the ten rigs | Evelyn Roberta |
| 4.1.2 | | | Computerize the rigs | Evelyn Roberta |
| 4.2.3 | | | Run the rigs | Evelyn Roberta |
| 4.2 | | Drilling |
| 4.2.1 | | | Set up 58 sites | Naomi Ruth |
| 4.2.2 | | | Install rigs | Naomi Ruth |
| 4.2.3 | | | Run the drills | Naomi Ruth |
| 5 | Delivering on a turnkey basis |
| 5.1 | | Interconnecting the rigs |
| 5.1.1 | | | Interconnect rig one to three | William Bezel |
| 5.1.2 | | | Interconnect rigs three to six | William Bezel |
| 5.1.3 | | | Interconnect rigs six to 10 | William Bezel |
| 5.2 | | Computerizing |
| 5.2.1 | | | Come up with software | Julius Reuben |
| 5.2.2 | | | Install software | Julius Reuben |
| 5.2.3 | | | Test and run software | Julius Reuben |
| | References |
| | Lock, D. (2016). Project Management in Construction. Routledge. |
| | Nath, U., & Phookan, J. (2015, October). Drill Site Surface Facilities Readiness: Systems Improvement through Use of IT (An Upstream Oil & Gas Company's Approach). In SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition. Society of Petroleum Engineers. |
| | Siami-Irdemoosa, E., Dindarloo, S. R., & Sharifzadeh, M. (2015). Work breakdown structure (WBS) development for underground construction. Automation in Construction, 58, 85-94. |
| | Sutrisna, M., Ramanayaka, C. D., & Goulding, J. S. (2018). Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), 381-397. |