Building Project

profilebigpbv
UnitVIII_BuildingDiagram.pdf

Unit VIII – Building Diagram

Meeting

Room 1

Mail Room

& IT

Copy

Room

CTO

Training

Room

Open Air Entrance

Lobby

Meeting

Room 2

Basement

Stairs

Manager

Office

Break

Room

E x

is ti

n g

P a

r k

in g

L o

t

Key to IAQ & Mold Investigation

Partially Contained Asbestos: HVAC & Pump Room

Visible Mold: exterior walls (both floors) marked in

green: 1st Floor not on ceilings, Basement offices, walls, ceilings, cubicle area, HVAC & pump room

Strong chemical, cigarette smoke, & CO2 odors: 1st

floor SW corner offices; Basement HVAC & pump room

Possible lead-based paint on storage room walls

Possible radon gas entry point in storage area; location

zoned Tier 1 within EPA guidelines

Open Area w/ Cubicles

First Floor Finished w/

Suspended 10’ Ceiling

Size 80’ x 300’ (24,000 sq. ft.)

Drop Ceiling Suspended Approx 4’ Beneath

3-12 Flat Pitched Roof

Stairs

EXIT

HVAC &

Utility

Return

EXIT

Building Not to Scale – Emphasis on IAQ & Mold Investigation

New Parking Lot Recently

Added 2 Months Ago

Three Louvers Vents 3’L x 2’W

Beneath 1st Floor South Wall

1’ Above - Top of Soil Line

SE – Corner

Existing Grade

level 174’

above sea level

Elevator

President

80 feet

3 0 0

f e e t

Network

Return

Women’s

Restroom

Men’s

Restroom

N NE – Corner

Existing Grade

level 178’

above sea level

Manager

Office

EXIT

EXIT

CEO CFO

Basement Area

Break

Room

Men’s

Restroom

Women’s

Restroom

Open Area w/ Cubicles

Unfinished Open Storage Area

No Ceiling - Open to Bottom of

1st Floor – 6,630 sq. ft.

Elevator

Finished Basement w/

Suspended 10’ Ceiling

Size 80’ x 180’ (14,400 sq. ft.)

Drop Ceiling Suspended Approx 4’ Beneath 1st Floor

Basement

EXIT

8’ W Finished Concrete Cinder Block Wall w/

Insulation – Basement Floor to Bottom of 1st Floor -14’ H

N

IT Office

Building Not to Scale – Emphasis on IAQ Investigation

Basement

Lobby

8 ”

W F

in is

h e d

C o

n c r e te

C in

d e r B

lo c k

W a

ll

w /

In su

la ti

o n

– B

a se

m e n

t F

lo o

r t

o B

o tt

o m

o f

1 st

F lo

o r -

1 4

’ H

S u

r r o

u n

d in

g P

u m

p

R o

o m

& H

V A

C

Visible Cracks

on Unfinished

Concrete Floor

Vacant Old Generator

& Pump Room Area

w/ Outside Louver

Ventilation

Network Room

Copy

Room

E x

is ti

n g

P a

r k

in g

L o

t

Three Louver Vents 3’L x 2’H

Beneath 1st Floor South Wall

1’ Above - Top of Soil Line

NE – Basement

Floor 14’ below

ground level

SE – Basement

Floor 10’ below

ground level

Manager

Office

Manager

Office

1st Floor HVAC,

Electric, &

Utility Return

Basement EXIT

Building

HVAC,

Electrical, &

Utilities Room

Utility Room

Area

2970 sq. ft.