System Analysis

profileAbdulkder Salad
Trainlinereservationsystem.pdf

TRAIN LINE RESERVATION SYSTEM

You will conduct a systems analysis project by performing 3 phases of SDLC (planning,

analysis and design) for a small organization (imaginary). The actual project

implementation is not required (i.e. No coding required.)

Deliverables

This project should follow the main steps of the first three phases of the SDLC (phase 1, 2

and 3). Details description and diagrams should be included in each phase.

Part 1: Planning Phase

Under this section, include the following

▪ Adopt an SDLC development methodology

▪ Develop a work plan (Gantt chart)

Part 2: Analysis phase

In this section, you are required to determine the main business requirements;

consequently, the following must be included:

▪ Create Use Cases

▪ Model Processes (Data Flow Diagramming)

▪ Model data (ER modeling)

Part 3: Design phase

Under this section, include the following:

▪ Select an architecture design

▪ Screens Design (create the User Interface Structure Design), and sample system

screens. No need to be in HTML, they can be just drawing of how the screen will

appear.

▪ Class Design Diagram