|
|
| | | | | | LEED 2009 for New Construction and Major Renovations | | | | | | Project Name |
| | | | | | Project Checklist | | | | | | Date |
| | 0 | 0 | 0 | | Sustainable Sites | | | Possible Points: | 26 |
| | Y | ? | N | d/C | | | | | | | Notes: |
| | Y | | | C | Prereq 1 | Construction Activity Pollution Prevention |
| | | | | d | Credit 1 | Site Selection | | | 1 |
| | | | | d | Credit 2 | Development Density and Community Connectivity | | | 5 |
| | | | | d | Credit 3 | Brownfield Redevelopment | | | 1 |
| | | | | d | Credit 4.1 | Alternative Transportation—Public Transportation Access | | | 6 |
| | | | | d | Credit 4.2 | Alternative Transportation—Bicycle Storage and Changing Rooms | | | 1 |
| | | | | d | Credit 4.3 | Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles | | | 3 |
| | | | | d | Credit 4.4 | Alternative Transportation—Parking Capacity | | | 2 |
| | | | | C | Credit 5.1 | Site Development—Protect or Restore Habitat | | | 1 |
| | | | | d | Credit 5.2 | Site Development—Maximize Open Space | | | 1 |
| | | | | d | Credit 6.1 | Stormwater Design—Quantity Control | | | 1 |
| | | | | d | Credit 6.2 | Stormwater Design—Quality Control | | | 1 |
| | | | | C | Credit 7.1 | Heat Island Effect—Non-roof | | | 1 |
| | | | | d | Credit 7.2 | Heat Island Effect—Roof | | | 1 |
| | | | | d | Credit 8 | Light Pollution Reduction | | | 1 |
| | 0 | 0 | 0 | | Water Efficiency | | | Possible Points: | 10 |
| | Y | ? | N | | | | | | | | Notes: |
| | Y | | | d | Prereq 1 | Water Use Reduction—20% Reduction |
| | | | | d | Credit 1 | Water Efficient Landscaping | | | 2 to 4 |
| | | | | | | | Reduce by 50% | | 2 |
| | | | | | | | No Potable Water Use or Irrigation | | 4 |
| | | | | d | Credit 2 | Innovative Wastewater Technologies | | | 2 |
| | | | | d | Credit 3 | Water Use Reduction | | | 2 to 4 |
| | | | | | | | Reduce by 30% | | 2 |
| | | | | | | | Reduce by 35% | | 3 |
| | | | | | | | Reduce by 40% | | 4 |
| | 0 | 0 | 0 | | Energy and Atmosphere | | | Possible Points: | 35 |
| | Y | ? | N | | | | | | | | Notes: |
| | Y | | | C | Prereq 1 | Fundamental Commissioning of Building Energy Systems |
| | Y | | | d | Prereq 2 | Minimum Energy Performance |
| | Y | | | d | Prereq 3 | Fundamental Refrigerant Management |
| | | | | d | Credit 1 | Optimize Energy Performance | | | 1 to 19 |
| | | | | | | | Improve by 12% for New Buildings or 8% for Existing Building Renovations | | 1 |
| | | | | | | | Improve by 14% for New Buildings or 10% for Existing Building Renovations | | 2 |
| | | | | | | | Improve by 16% for New Buildings or 12% for Existing Building Renovations | | 3 |
| | | | | | | | Improve by 18% for New Buildings or 14% for Existing Building Renovations | | 4 |
| | | | | | | | Improve by 20% for New Buildings or 16% for Existing Building Renovations | | 5 |
| | | | | | | | Improve by 22% for New Buildings or 18% for Existing Building Renovations | | 6 |
| | | | | | | | Improve by 24% for New Buildings or 20% for Existing Building Renovations | | 7 |
| | | | | | | | Improve by 26% for New Buildings or 22% for Existing Building Renovations | | 8 |
| | | | | | | | Improve by 28% for New Buildings or 24% for Existing Building Renovations | | 9 |
| | | | | | | | Improve by 30% for New Buildings or 26% for Existing Building Renovations | | 10 |
| | | | | | | | Improve by 32% for New Buildings or 28% for Existing Building Renovations | | 11 |
| | | | | | | | Improve by 34% for New Buildings or 30% for Existing Building Renovations | | 12 |
| | | | | | | | Improve by 36% for New Buildings or 32% for Existing Building Renovations | | 13 |
| | | | | | | | Improve by 38% for New Buildings or 34% for Existing Building Renovations | | 14 |
| | | | | | | | Improve by 40% for New Buildings or 36% for Existing Building Renovations | | 15 |
| | | | | | | | Improve by 42% for New Buildings or 38% for Existing Building Renovations | | 16 |
| | | | | | | | Improve by 44% for New Buildings or 40% for Existing Building Renovations | | 17 |
| | | | | | | | Improve by 46% for New Buildings or 42% for Existing Building Renovations | | 18 |
| | | | | | | | Improve by 48%+ for New Buildings or 44%+ for Existing Building Renovations | | 19 |
| | | | | d | Credit 2 | On-Site Renewable Energy | | | 1 to 7 |
| | | | | | | | 1% Renewable Energy | | 1 |
| | | | | | | | 3% Renewable Energy | | 2 |
| | | | | | | | 5% Renewable Energy | | 3 |
| | | | | | | | 7% Renewable Energy | | 4 |
| | | | | | | | 9% Renewable Energy | | 5 |
| | | | | | | | 11% Renewable Energy | | 6 |
| | | | | | | | 13% Renewable Energy | | 7 |
| | | | | C | Credit 3 | Enhanced Commissioning | | | 2 |
| | | | | d | Credit 4 | Enhanced Refrigerant Management | | | 2 |
| | | | | C | Credit 5 | Measurement and Verification | | | 3 |
| | | | | C | Credit 6 | Green Power | | | 2 |
| | 0 | 0 | 0 | | Materials and Resources | | | Possible Points: | 14 |
| | Y | ? | N | | | | | | | | Notes: |
| | Y | | | d | Prereq 1 | Storage and Collection of Recyclables |
| | | | | C | Credit 1.1 | Building Reuse—Maintain Existing Walls, Floors, and Roof | | | 1 to 3 |
| | | | | | | | Reuse 55% | | 1 |
| | | | | | | | Reuse 75% | | 2 |
| | | | | | | | Reuse 95% | | 3 |
| | | | | C | Credit 1.2 | Building Reuse—Maintain 50% of Interior Non-Structural Elements | | | 1 |
| | | | | C | Credit 2 | Construction Waste Management | | | 1 to 2 |
| | | | | | | | 50% Recycled or Salvaged | | 1 |
| | | | | | | | 75% Recycled or Salvaged | | 2 |
| | | | | C | Credit 3 | Materials Reuse | | | 1 to 2 |
| | | | | | | | Reuse 5% | | 1 |
| | | | | | | | Reuse 10% | | 2 |
| | | | | C | Credit 4 | Recycled Content | | | 1 to 2 |
| | | | | | | | 10% of Content | | 1 |
| | | | | | | | 20% of Content | | 2 |
| | | | | C | Credit 5 | Regional Materials | | | 1 to 2 |
| | | | | | | | 10% of Materials | | 1 |
| | | | | | | | 20% of Materials | | 2 |
| | | | | C | Credit 6 | Rapidly Renewable Materials | | | 1 |
| | | | | C | Credit 7 | Certified Wood | | | 1 |
| | 0 | 0 | 0 | | Indoor Environmental Quality | | | Possible Points: | 15 |
| | Y | ? | N | | | | | | | | Notes: |
| | Y | | | d | Prereq 1 | Minimum Indoor Air Quality Performance |
| | Y | | | d | Prereq 2 | Environmental Tobacco Smoke (ETS) Control |
| | | | | d | Credit 1 | Outdoor Air Delivery Monitoring | | | 1 |
| | | | | d | Credit 2 | Increased Ventilation | | | 1 |
| | | | | C | Credit 3.1 | Construction IAQ Management Plan—During Construction | | | 1 |
| | | | | C | Credit 3.2 | Construction IAQ Management Plan—Before Occupancy | | | 1 |
| | | | | C | Credit 4.1 | Low-Emitting Materials—Adhesives and Sealants | | | 1 |
| | | | | C | Credit 4.2 | Low-Emitting Materials—Paints and Coatings | | | 1 |
| | | | | C | Credit 4.3 | Low-Emitting Materials—Flooring Systems | | | 1 |
| | | | | C | Credit 4.4 | Low-Emitting Materials—Composite Wood and Agrifiber Products | | | 1 |
| | | | | d | Credit 5 | Indoor Chemical and Pollutant Source Control | | | 1 |
| | | | | d | Credit 6.1 | Controllability of Systems—Lighting | | | 1 |
| | | | | d | Credit 6.2 | Controllability of Systems—Thermal Comfort | | | 1 |
| | | | | d | Credit 7.1 | Thermal Comfort—Design | | | 1 |
| | | | | d | Credit 7.2 | Thermal Comfort—Verification | | | 1 |
| | | | | d | Credit 8.1 | Daylight and Views—Daylight | | | 1 |
| | | | | d | Credit 8.2 | Daylight and Views—Views | | | 1 |
| | 0 | 0 | 0 | | Innovation and Design Process | | | Possible Points: | 6 |
| | Y | ? | N | | | | | | | | Notes: |
| | | | | d/C | Credit 1.1 | Innovation in Design: Specific Title | | | 1 |
| | | | | d/C | Credit 1.2 | Innovation in Design: Specific Title | | | 1 |
| | | | | d/C | Credit 1.3 | Innovation in Design: Specific Title | | | 1 |
| | | | | d/C | Credit 1.4 | Innovation in Design: Specific Title | | | 1 |
| | | | | d/C | Credit 1.5 | Innovation in Design: Specific Title | | | 1 |
| | | | | d/C | Credit 2 | LEED Accredited Professional | | | 1 |
| | 0 | 0 | 0 | | Regional Priority Credits | | | Possible Points: | 4 |
| | Y | ? | N | | | | | | | | Notes: |
| | | | | d/C | Credit 1.1 | Regional Priority: Specific Credit | | | 1 |
| | | | | d/C | Credit 1.2 | Regional Priority: Specific Credit | | | 1 |
| | | | | d/C | Credit 1.3 | Regional Priority: Specific Credit | | | 1 |
| | | | | d/C | Credit 1.4 | Regional Priority: Specific Credit | | | 1 |
| | 0 | 0 | 0 | | Total | | | Possible Points: | 110 |
| | | | | | Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 |