CMGT/445: CASE STUDY: APPLIANCE WAREHOUSE – Application Implementation

profileBlackWolf
TemplateLibrary.zip

Template Library/form_01_request-for-information-services.rtf

REQUEST FOR INFORMATION SERVICES

Date:      

System enhancement:      

Title:      

Department:      

Location:      

New system:      

E-mail:      

REQUEST FOR:

URGENCY:

[ ] Correction of system error

[ ] Immediate attention required

[ ] System enhancement

[ ] Handle in normal priority sequence

[ ] New system

[ ] Defer until new system is developed

DESCRIPTION OF REQUESTED SYSTEMS SERVICES:

(ATTACH ADDITIONAL DOCUMENTS AS NECESSARY)

     

(To be completed by the Information Technology Department)

[ ] Approved

Assigned to IT contact person:      

User:      

Urgency code (1 low to 5 high):      

[ ] Modified (see attached notes)

[ ] Rejected (see attached notes)

Date:      

Action:      

Template Library/form_02_preliminary-investigation-report.rtf

Note: In MS Word 2010, Click Review – Restrict Editing – Stop Protection and remove all highlighted material after completing the form

PRELIMINARY INVESTIGATION REPORT

Subject:      

Date:      

INTRODUCTION

[Provide a brief description of the system, the name of the person or group who performed the investigation, and the name of the person or group who initiated the investigation.]

     

SYSTEMS REQUEST SUMMARY

[Explain the basis of the systems request, including an explanation of major problems or opportunities mentioned in the request.]

     

PRELIMINARY INVESTIGATION FINDINGS

[Describe the results of the investigation, including the scope of the proposed project and the conclusions that were reached. Mention all significant findings, including the results of interviews and other fact-finding, and provide an estimate of current costs.]

     

RECOMMENDATIONS

[Present a specific recommendation for further action.]

     

TIME AND COST ESTIMATES

[Include an estimate of time and expenses necessary for additional IT department work. This should be quite specific for the next phase and should include a timetable and cost estimate for the entire project.]

     

EXPECTED BENEFITS

[Explain all tangible benefits, with specific dollar estimates, using a range if appropriate. Also mention any intangible benefits.]

     

Template Library/form_03_system-requirements-document.rtf

SYSTEM REQUIREMENTS DOCUMENT

· Introduction

     

· Summary

     

· Findings

     

· Recommendations

     

· Time and Cost Estimates

     

· Expected Benefits

     

· Appendix

     

Template Library/form_04_system-design-specification.rtf

SYSTEM DESIGN SPECIFICATION

Management Summary

     

Template Library/form_05_systems-requirements-change-request.rtf

SYSTEM REQUIREMENTS CHANGE REQUEST

PRINT THE FOLLOWING INFORMATION:

NAME

     

DEPARTMENT

     

JOB TITLE

     

DESCRIPTION OF CHANGE:

     

REASON FOR CHANGE:

     

ATTACH ADDITIONAL INFORMATION AND DOCUMENTS AS NEEDED:

CHECK THIS BOX IF ATTACHMENTS ARE INCLUDED:

SIGNED _________________________________________________________ DATE __________________________

CONTROL NUMBER

     

DATE RECEIVED

     

TO BE COMPLETED BY THE PROJECT COORDINATOR:

IMPACT ANALYSIS:

Include an estimate of resources needed, with specific costs and timetables.

     

ACTION:

      ACCEPT

      DEFER UNTIL       (DATE)

      REJECT FOR THE FOLLOWING REASONS:

     

SIGNED ___________________________________________________________ DATE _____________________

Template Library/form_06_interview-documentation.rtf

INTERVIEW DOCUMENTATION

Name of System:       Page      

Date:      

Prepared by:      

Title:      

Purpose:      

Location:      

Template Library/form_07_report-analysis.rtf

SYSTEM DOCUMENTATION

NAME OF SYSTEM

     

DATE

     

PAGE       of      

ANALYST

     

PURPOSE OF DOCUMENTATION

     

FIELD FIELD TYPE FIELD LENGTH

                 

Template Library/form_08_data-element-description.rtf

DATA DICTIONARY

DATA ELEMENT DESCRIPTION

SYSTEM      

DATA ELEMENT NAME       LABEL      

ALTERNATE NAMES      

TYPE AND LENGTH       OUTPUT FORMAT      

DEFAULT VALUE       ACCEPTABLE VALUES      

PROMPT/COLUMN HEADER      

SOURCE      

SECURITY      

RESPONSIBLE USER      

DERIVATION FORMULA      

DESCRIPTION AND COMMENTS

     

Template Library/form_09_data-flow-description.rtf

DATA DICTIONARY

DATA FLOW DESCRIPTION

ID       NAME      

ALIAS      

DESCRIPTION      

ORIGIN       DESTINATION      

RECORD      

VOLUME AND FREQUENCY      

COMMENTS      

Template Library/form_10_process-description.rtf

DATA DICTIONARY

PROCESS DESCRIPTION

SYSTEM      

PROCESS NAME      

PROCESS ID      

INPUT DATA FLOWS      

OUTPUT DATA FLOWS      

PROCESS DESCRIPTION      

Template Library/form_11_record-description.rtf

DATA DICTIONARY

RECORD DESCRIPTION

SYSTEM      

RECORD ID      

RECORD NAME      

ALTERNATE NAMES      

DEFINITION      

RECORD DATA ELEMENTS      

Template Library/form_12_data-store-description.rtf

DATA DICTIONARY

DATA STORE DESCRIPTION

LABEL      

ENTRY TYPE      

DESCRIPTION      

ALIAS      

COMPOSITION (ATTRIBUTES)      

NOTES      

LONG NAME      

Template Library/form_13_external-entity-description.rtf

DATA DICTIONARY

EXTERNAL ENTITY DESCRIPTION

LABEL      

ENTRY TYPE      

DESCRIPTION      

ALIAS      

VALUES & MEANINGS      

NOTES      

LONG NAME      

Template Library/form_14_program-documentation.rtf

SYSTEM DOCUMENTATION

NAME OF SYSTEM

     

DATE

     

PAGE       of      

ANALYST

     

PURPOSE OF DOCUMENTATION

     

PROGRAM IDENTIFICATION

     

PURPOSE

     

FILES – DATABASES – CLOUD REQUIREMENTS

     

WEB PROCESSING REQUIREMENTS AND RESOURCES

     

Template Library/form_15_npv_template.xls

NPV Template

Net Present Value (NPV) Template
Note:
Cells B12:H12 and B16:H16 contain formulas to multiply discount factors * benefit and cost values
Cells I12 and I16 contain adjusted cost and benefit totals
Cell C18 contains the calculation for net present value (NPV)
Year Year Year Year Year Year Year Total
0 1 2 3 4 5 6
Benefits
Factor
PV of Benefits - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
Costs
Factor
PV of Costs - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
Net Present Value: - 0
The formula in cell C18 will calculate NPV when values are entered in cells B10:H11 and B14:H15

Sheet2

Sheet3

Template Library/form_16_system-security-checklist.rtf

SYSTEM SECURITY CHECKLIST

· Overview of System S ecurity I ssues and C oncerns

     

· Analysis of Physical Security

     

· Analysis of Network Security

     

· Analysis of Application Security

     

· Analysis of File Security

     

· Analysis of User Security

     

· Analysis of Cloud vulnerability, if any

     

· Additional Comments and Recommendations

     

Template Library/form_17_payback-analysis-template.xls

Payback Analysis Template

Payback Analysis Template
Note: Cells C8:C14 and E8:E14 contain formulas to accumulate costs and benefits
Year Costs Cumulative Benefits Cumulative
Costs Benefits
0 - 0 - 0
1 - 0 - 0
2 - 0 - 0
3 - 0 - 0
4 - 0 - 0
5 - 0 - 0
6 - 0 - 0

Sheet2

Sheet3

Template Library/form_18_roi-template.xls

ROI Template

Return on Investment (ROI) Template
Note: Cells C8:C14 and E8:E14 contain formulas to accumulate costs and benefits
Cell C17 contains formula to calculate ROI
Year Costs Cumulative Benefits Cumulative
Costs Benefits
0 - 0 - 0
1 - 0 - 0
2 - 0 - 0
3 - 0 - 0
4 - 0 - 0
5 - 0 - 0
6 - 0 - 0
- 0 - 0
ROI: 0.0%
The formula in cell C17 will calculate ROI when values are entered in cells B8:B14 and D8:D14

Sheet2

Sheet3

Template Library/form_19_npv-template.xls

NPV Template

Net Present Value (NPV) Template
Note:
Cells B12:H12 and B16:H16 contain formulas to multiply discount factors * benefit and cost values
Cells I12 and I16 contain adjusted cost and benefit totals
Cell C18 contains the calculation for net present value (NPV)
Year Year Year Year Year Year Year Total
0 1 2 3 4 5 6
Benefits
Factor
PV of Benefits - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
Costs
Factor
PV of Costs - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
Net Present Value: - 0
The formula in cell C18 will calculate NPV when values are entered in cells B10:H11 and B14:H15

Sheet2

Sheet3