Innovation & Implementation

profilecalvinkammer
Template.pptx

-Tÿdal Penedès® -

Routes and Beach Project

1

EXEXUTIVE SUMMARY - ABSTRACT THE NARRATIVE

MAIN PROJECT MOTIVACIONS AND RATIONALE

PLACING THE LOCAL BEACH AT TRHE WORLD MAP

LOOKING FOT MAXIMUM SOCIOECONOMIC IMPACT

BREAK TOURISM SEASONAL DEPENDENCE

BRING AND INCERASING HIGH TOURISME

A SINGULAR TOURISTIC POINT

SURF - SOCIOECONOMY PARAMETERS AND INPUTS

THE PROJECT

CLOSE EXPERIENCES IN THE WORLD (iNDOOR PARCS & RESORTS)

IOPERATIONAL FACILITIES

A NEW IFACILITY AND INFRASTRUCTIURE: AN ARTIFICIAL SURF WAVE GENERADOR IN OPEN CALM BEACH

PROJECTE BASICS

TECHNICAL AVANT-PROJECT INPUTS

SITTING

GENERATION AND WAVE QUALITY

GENERATING DEVICES

ENERGETICS AND MANAGEMENT: CONSUMPTIONS

SAFETY AND ENVIRONMENTAL ASPECTS: REGULATIONS, FORMALITIES AND PERMITS

ECONOMIC PROFIT SCHEMonth

SIZING THE COMMERCIAL EXPLOTATION [USER VOLUME]

SEASONAL EXPLOITATION SCHEMonth AND DAIRY OPERATIONAL INCOMonth

MAINTENANCE AND EXPLOITATION COSTS

ENVIRONMENTAL/ADMINISTRATIVE/LEGAL ASPECTS

ENVIRONMENTAL IMPACT ASSEESMENT (EIA) FORMALITIES

IMPLANTATION AND EXPLOITATION LEGAL PERMITS

IN FORCE REGULATION

BUSINESS PLAN A: PROTOTYPE DEMONSTRATOR AT COMA-RUGA

INVESTMENTS

COST ASSESSMENT TO DEVELOP AND TO IMPLANT THE DEVICE AND FACILITIES

ASSESSMENT OF ENERGY CONSUMPTIO N COSTS

PERSONAL COSTS (OPERADORS, SAFEGUARDS,..)

FORMALITIES, PERMISSIONS, INSURANCES

XXXX

EXPLOITATION INCOMonth

FORFAITS

MATERIAL RENTING AND SALES

COURSES AND EVENTS

BUSINESS PLAN B: BUILDING AND COMMERCIALIZING ARTIFICIAL WAVE GENERATOR IN THE MEDITERRANIA.

EXECUTIVE SUMMARY

3

The project undertaking is done under the context of INNOVATION ENTREPRENEURSHIP SUPPORTIING ACTIONS OF PUBLIC ADMINISTRATION (local, province, Regional, National) looking for the best proposals impacting on tourism socio-economy with innovative bussiness driven proposals.

The proposal is done as an entrepreneurship proposal to promote tourism in the area of EL VENDRELL and Baix Penedes County (South Catalonia) and is based on potential administration support.

It is proposed (1) the conception of the facility, (2) the detailed design and (3) the development of the set studies needed to elaborate (4) two different Business Plans driving to the new singular facility and infraestructure touristic and sportive: a facility generating surf waves in the mediterranean .

 

GOAL 1: The largest (maximum) economic impact is intented for a consolidated touristic area (Beachs of Coma-ruga in El Vendrell), South Catalonia.

GOAL 2: Breaking the touristic seasonal dependence with sports.

GOAL 3: Breaking negative trends (unemployment, loss of sportive infraestructures, lack of identity, singular touristic quality offer, etc.).

(The area is clearly underdeveloped in terms of sportive infrastructure [3,54 equipments over 10.000 people, compared with the average (value 13), in the Tarragona province.)

The proposal is acknowledged as ambitious from a Business Project point of view and technical complexity of the proposal is seem to be graded as medium and achievable.

Strong fortresses and opportunities: extra-good climatic conditions (even best conditions in winter than in the Spanish North Coast in Summer), fully developed touristic area, high quality beachs, top communications, culture offer (Pau Casals Museum, Wine Region,..) , high commitment of the administrations, etc.

Surf as sport and the possibility to generate a singular facility and unique at the mediterranean sea.

More than 65.000 official fans and practitioners in Europe and not less than 15.000 in Spain, move around the world looking for waves

Engineering today offer the possibility to generate artificial waves of quality at our beachs.

Two business plans are possible and proposed:

(1) A first Businees Plan A should assess the exploitation of a unique singular and local facility (Sant Salvador or Port de Coma-Ruga).

(2) A second Businees Plan B analyzes the business possibility to develop facilities all along the Med coast.

EXECUTIVE SUMMARY

4

Motivation

5

PROJECT MOTIVATIONS (1)

PLACING AND SITTING THE LOCAL BEACH AT MAP: A NEED

BEACHES[FROM SALOU TO SITGES] & IN PARTICULAR THOSE AT BAIX PENEDES (EL VENDRELL) NOT MAP SITTED AT INTERNATIONAL LEVEL:

- SALOU: Port Aventura

- TARRAGONA: Historic City

- SITGES: Internat. Destination

ACTION & PROMOTION WITH SOCIOECONOMIC IMPACT (@ESCALA): NECESSARI

DESTATIONALIZE THE TOURISM: EQULIBRATE [OCTUBER-MAY] OCCUPANCY

GENERATE A SINGULAR TOURISM OFFER AND BRING TOURISM OF QUALITY

GENERATE A SINGULAR TOURISM POINT WITH HIGH PURCHASING POWER

A NEW TOURISTIC PHILOSOPHY … [“INDIE”], AS WINTER SPORT, LEISURE AND ADVENTURE

Salou

Sitges

Coma-ruga Port

Segur Port

6

PROJECT MOTIVATION (2)

SOME FIGURE (known and unacceptables as well.. )

UNEMPLOIMENT: BAIX PENEDES is a south Catalonia county with highest unemployment rates (25-28%) fluctuating changing by 6 – 8 % from summer to winter [IDESCAT Official Data, 2015]

MACROECONOMY: Economy differences GDP SUMMER/WINTER higher to 10% The difference is smoothed by tourism occupancy … e.g: [the solution is in the tourism !] [IDESCAT Official Data, 2015]

TOURISTIC POTENTIAL: Beach/Nature of Quality (Culture, Gastro, Leisure, ..)

TOURISTIC QUALITY : Even if the touristic offer is rich and aboundant the levels of quality and expenditure per capita are the lowest in the Catlonian coast ….well below Costa Brava and other areas in the Med Coast and comparable (in summer) to other crowded (lower quality offer) zones (Salou, Benidorm,Gandia)

7

PROJECT MOTIVATION (3)

IMPORTANT ECONOMIC IMPACTE OF seasonaliTY

SEASONALITY HAS INCREASED THE LAST DECADE DECREASING INCOMonth , INVETMENTS AND EMPLOYMENT

SEASONALITY IMPCTS ON OTHER SECTORS: COMMERCE, REAL STATE, PRIMARY

SEASONALITY IS STRONGLY NEGATIVE FOR DIVERSE SEGMENTS

LABOUR INESTABILITY AND LOW QUALITY JOBS

ECONOMICS: LOST OF INVESTMENTS AND EQUIPMENTS AND REAL STATE VALUE

ECOLOGY: SEASONAL DEGRADATION DUE TO COST OF MANTENANCE

INSTITUTIONALS: DIFICULTIES TO MANAGE PUBLIC ACTIONS AND PLANNING

CHALLENGES (Town Hall Administration)

Consolidate a productive frame associated to tourism

Get maximum profit from an enormous turistic potential (breaking seasonality)

8

EL VENDRELL AREA: UNDER-DEVELOPED IN TERMS OF SPORTIVE EQUIPMENTS

Just 13 SPORTIVE FACILITIES; 1 EQUIPAMENT EACH 2824 PEOPLE OR 3,54 FACILITIES EACH 10,000 PEOPLE. PROVINCE AVERAGE : 26,67 each10,000 PEOPLE (tax payer)

Sportif areae below average rates (EV: 1,34 m2/person) versus a 4,10 m2/person at Catalonia.

SPORTIF EQUIPMENTS ALSO STRONGLY SEASONED AND FAR FROM THE COAST

FORTRESS FOR NEW SINGULAR EQUIPMENTS (DAFO, iDESCAT)

Good (TOP) communication network .

Optimum (TOP) bio-clima conditions.

OPPORTUNITIES (SWOT):

Possibility to generate de sinergies with complementary sectors (tourism- wine, -culture/music.)

Get added valued from under used public spaces.

Large degree of implication of Local, County, Province and Regional (GenCat).

Economic impact on close Infraestructures (Coma-ruga Port, Karting, Auditori Pau Casals, ..).

PROJECT MOTIVATION (4)

9

Surf

SocioEconomy

10

Playa de Sotavento

(Fuerteventura)

Mundaka

Rodiles

Playa de los Lances

(Tarifa, Cádiz)

SURF -SOCIOECONOMY

Nivel: mBundoran (Donegal County)

La Gravière ( Hossegor )

La Palue (Bretagne)

Lafiténia , Biarritz

Nivel: mCapo Mannu (Oristano)

Nivel: mCornwall (Gales)

Nivel: mGuincho (Cascais)

Nivel: mPraia Arrifana (Algarbe)

Nivel: mPraia Supertubos

Thurso East (Escòcia)

Fehrman

(Schleswig-Holstein))

mEaskey

11

+ de 15, 000

SURF -SOCIOECONOMICS

+ de 65, 000 federative sport licenses

IN CATALONIA MIXED WITH - PADDLE-SURF

SKATESURF

WINDSURF

SURF: SPORT PEOPLE HAVING EXPENDITURE POTENTIAL MEDIUM-HIGH

THE MATERIAL IS EXPENSIVE,

FREQUENT TRIPS AND TRAVELLING

ASSOCIATTED LIFE STYLE

SURFERS: CRAZY PEOPLE LOOKING FOR WAVES OF QUALITY …(WHEREVER THEY ARE !)

SURFERS MAKE TYPICALLY ONE LONG TRIP PER YEAR (MALDIVES, BALI, HAWAII, CALIFORNIA) AND 10-12 SPORT TRIPS PER YEAR (EUROPE)

SURF IS A LIFE STYLE AND PHILOSPHY “INDIE” [NATURE, RISK, NICE AND FRIENDLY PEOPLE, ] (“NOT SNOBS”)

WAVE QUALITY OFFERED: KEY SUCCES FACTOR.

NUMBER OF SURFERS INCREASING (high rates) !

ALSO INDOOR SURF FACILITIES INCREASING AND ARTIFICIAL WAVE FACILITIES IN THE WORLD .

SURF -SOCIOECONOMICS

Project: The context

14

THE TYDAL PROJECT®

BEACHS AND ARTIFICIAL SURF FACILITIES IN THE WORLDS

SNOWDONIA, Gales

(piscina artificial, llac tancat)

Surfing Pool Dubai [Resort]

Testing Nland, Austin, Texas

WaveGarten, Donosti Llac tancat

Urban Western Sydney

SeaGaia Ocean Dome (Japan)

Killer Point, Taghazout, Morocco

Supertubes, Jeffrey’s Bay, South Africa

Skeleton Coast, Namibia

Robertsport, Liberia

Durban, South Africa

Hout Bay, Cape Town, South Africa

Flameballs, Anakao, Madagascar

Tamarin, Mauritius

Almadies Senegal

N’Gor Island, Senegal

Miramar Argentina

Alagoas

Amapa

Bahia 

Ceara 

Espirito Santo

Maranhao

Paraiba 

Rio de Janeiro 

Sao Paulo 

Sergipe

Los Molles

Pichimelu

Santo Domingo

El ORO

Esmeralda

Galapagos Islands

Guayas 

Manabi 

Baja Norte 

Baja Sur 

Chiapas

Colima 

Guerrero 

Bay Area 

Marin County 

San Francisco 

San Mateo

Santa Cruz 

Central Atolls

 North Male Atoll

 South Male Atoll

 Southern Atolls

Bali

Lmbok

Kuta

Nias

Illawarra 

Lord Howe Island

Mid North Coast 

Newcastle 

Sydney 

Brisbane 

Fraser Island 

Sunshine Coast

Eyre Peninsula 

Kangaroo Island

Nullarbor

Yorke to Fleurieau Peninsula 

Riyuewan Beach
Shilaoren
Niijima Tanegashima
Ammami Oshima
Wavegarden San Sebastian Closed Lake
Wavegarden Scotland Closed Lake
Surf Lakes Ltd (Queensland) Closed Lake
URBNSURF (Perth) Closed Lake
NLAND SURF PARK Closed Lake
SNOWDONIA Closed Lake
SEAGAIAOPEN SURF Artif. Beach
SURFING POOL DUBAI Priv. Ressort
Kelly Slater Surf Ranch Building
DOCKLAND SURF PARK Building

THE TYDAL PROJECT®

BEACHS AND ARTIFICIAL SURF FACILITIES IN THE WORLDS

THE TYDAL PROJECT®

Wavegarden San Sebastian

THE TYDAL PROJECT®

SEAGAIAOPEN SURF

THE TYDAL PROJECT®

INDOOR SURF EXPERIENCES AND WATER PARK IN THE WORLD

Docklands Surf Park Proposed for the Melbourne CBD

Tÿdal_Penedès: An unique facility

20

THE TYDAL PROJECT®

AN UNIQUE INFRASTRUCTURE :

FIRST ARTIFICIAL WAVE GENERATOR “OPEN BEACH” IN THE WORLD

FIRST ARTIFICIAL WAVE GENERATOR IN THE MEDITERRANEAN SEA

Technical Avant_Project

Basics

22

TECNICAL AVANTPROJECT

A NEW INFRASTRUCTURE: SURF WAVE GENERATOR “OPEN BEACH”

Francàs

Coma-ruga

Sant Salvador

Marine reserve

95 m

95 m

135 m

100 m

3 m

80 m

TECNICAL AVANTPROJECT

A NEW INFRASTRUCTURE: SURF WAVE GENERATOR “OPEN BEACH”: TECHNICAL BASIS (SITTING)

TECHNICAL OPTIONS A - B : LINKED TO SIDE OF THE PORT

Technical Option A

waves

“compressor” or propulsor type AWM

Technical Option B

“Scrubber” type Wavegarden

Waves

TECNICAL AVANTPROJECT

A NEW INFRASTRUCTURE: SURF WAVE GENERATOR “OPEN BEACH”: TECHNICAL BASIS (SITTING)

TECNICAL AVANTPROJECT

waves +side

waves -side

Technical Option C

Technical Option C : Multiwave

Two key device manufacturers (Colabs. Defined)

for Technical Option A

 Technical Options B, C

TECNICAL AVANTPROJECT

TECNICAL AVANTPROJECT

Key aspect: Wave quality and energy cost

PROS

CONTS

SIMPLICITY ELECTRIC SAFETY LOGISTICS EXPLOITATION INFRASTRUCTURE COST WAVE QUALITY
INFRASTRUCTURE COST ELECTRIC SAFETY LOGISTICS EXPLOITATION WAVE QUALITY ACCESIBILITY
WAVE QUALITY ACCESIBILITY GLOBAL SAFETY LOGISTICS EXPLOITATION ENERGETIC CONSUPM. ENVIRON. IMPACT (?)

Option C

Option B

Option A

TECNICAL AVANTPROJECT

KEY ISSUES

GLOBAL SAFETY A ~ B > C
ENVIRONMENTAL IMPACT A > B > C
WAVE QUALITY C > B > A
[Energy] kW-h A > B > C*
DEVICE COSTS A ~ B > C
SIZE OF USE C > B > A
MAINTENANCE COST A > B > C

BEST WORST

WAVE QUALITY = ENERGY DEMAND

12

5

3

VOL

(M

V

V

V ~ 50 km/h

E = 28,9 MJ/wave

@PVPC= last consumer fee

E = 8,02 kWh/wave

E = 962,4 kWh

€ /hour = 111,6 €

@2 wave per minut

TECNICAL AVANTPROJECT

Key aspect: Wave quality and energy cost

TECNICAL AVANTPROJECT

Energy management: consumptions and costs

The idea consist buying energy at the wholesale market (by 40% cheaper) and commercialise locally.

0,068 (wholesale market) vs. 0,113 €/kWh (PVPC)

TECNICAL AVANTPROJECT

Safety and Environmental Impact

S: MIN. DISTANCE TO MACHINE SEPARATION REQUIR. S: NO ELECTRIC SAFETY ISSUES EID:SAND MOVEMENTS & DRAGGING INTO THE BEACH EID: NOT EXPECTED [linked to Port, TBC]
S: PROTECTIVE FENCE SCRUBBING BLADES S: NO ELECTRIC SAFETY ISSUES EID:SAND MOVEMENTS & DRAGGING INTO THE BEACH EID:NOT EXPECTED [linked to Port, TBC]
S: MIN. DISTANCE TO MACHINE SEPARATION REQUIR. S: PASSIVE ELECTRIC SAFETY [HUGE WATER MASS DISSIP.] EID:SAND MOVEMENTS & DRAGGING INTO THE BEACH EID:TBC

All the options are safe (othewise no option) and guarantee safety aspects and Environmental Impact regulations.

Environmental Impact Declaration (EID) is slow procedure.

It is not sure it will be requested (to be avoided when possible)

Low noise level at natural espace (< 120 dB).

Option A

Option B

Option C

32

TECNICAL AVANTPROJECT

Permits and regulations

Technical Option A,B

 Linked to Coma·ruga Port

Technical Option C

PERMISSION 1: Implantation (Ministry, GenCat)

PERMISSION 1 : Exploitation (GenCat)

 Own formalities

 With E.I.D. (if needed) [ISO14001]

- Copy NIC/FIN/Company to GenCat .

Copy Trade Register or to GenCat .

Acreditacion of the Representative.

Register of the Legal Entities, if any (GenCat standard).

Copy Company accreditation , if any.

- Memo of Activities: 

Sitting the activities.

Equipments list.

Safeguards equipments

Personnel (Sefeguards).

Kind of activities

Registered office post address.

Insurance (copy of payments/contract).

Personnel´s qualification. 

33

Marketing and promotion

34

TECNICAL AVANTPROJECT

Marqueting and promoting actions

Attractive Web/e-shop. Differerent ticket fees tarifs when booking in anticipation. App Tÿdal iPhone/Android ???

Natural environment conditioning [Wild Madrigueres Beach, Coma·ruga Surf Port] ???

Forfaits types (1/2 day, 1 day, day packets, week-end,,..), individual forfaits and group forfaits. Economies and familly bonus.

Variable seasonal fees: A: 1/6 to 30/9; B: 1/10 to 15/11 i 1/3 to 30/5.

Touristic packets (Meridian RA, Balneari, Tour Operators, Agencies,

GROUP BONUS (Promotional Packets for Schools and High-Schools, Univs,..).

Open Promotional Day (in colaboration with... RedBull, Moritz, Damm,..).

Championship (not professionals) Summer/Winter “Tÿdal Surf Mediterrània”.

ESCOLA D´INICIACIÓ AL SURF, COLÒNIES D´INICIACIO AL SURF

SUMMER NIGHTS...SURFING THE NIGHT !

Etc, etc,..

TECNICAL AVANTPROJECT

Marqueting and promoting actions: Plans and Schedule

Public show for Investors and local Administrations : Elevator Pitch, Aj. d´ El Vendrell, DiPTa.

Open presentation of the proposal County BP and investors (Port, 5***** Hotels, Local Investors) and Touristic Stakeholders.

Presentation of Business Models A, B prototype to local investors (Instal·lació Coma-ruga (Business Case A, Business Case B)

Starting of the exploitation activity [Goal May 2021]

Beyond summer 2021

Summer 2020. Business Cases open discussions.

Summer 2020. Project Undertaking decisions.

Business Case A:

OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR (AT COMA-RUGA)

A Service Projecte

37

SIZING THE INVESTMENTS

BUSINESS CASE A: OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR

COST DE DESENVOLUPAMENT I IMPLANTACIÓ GENERADOR

(*) Leasing as options

  OPTION A OPTION B OPTION C
Engineering (hours) 15000 € 8000 € 25000 €
Equipment s (*) 80,000 € 100,000 € 150,000 €
Civil works and Assembling 20,000 € 30,000 € 35,000 €
Permissions/Licences (/year) 3000€ 3000€ 3000 €
Promotion/Marketing (initial) 10000 € 10000 € 10000 €
Manag., Legal & permits 1500 € 1500 € 2000 €
  TOTAL 131,000 € TOTAL 153,000 € TOTAL 227,000 €
Insurances Equip./People 1500 € 1500 € 2000 €

COST D´EXPLOTACIÓ

  SOLUCIO A SOLUCIO B SOLUCIO C
Personnel (Trainers, Safeguard) 150 €/d 150 €/d 210 €/d
Energy Cost (*) 682-1116 €/d 682-1116 €/d 682-1116 €/d
Maintenance Cost 2500€/m 2500€/m 2500€/m
Promot./Marketing (continuous) 5000 €/y 5000 €/y 5000 €/y
Administration/month 1500 € 1500 € 2000 €

(*) Energy bought and managed in the gross market.

BUSINESS CASE A: OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR

FORFAITS

SHOPS: RENT/SALES OF MATERIALS

TRAINING INITIATION

EVENTS: SCHOOLS, COMPETITIONS

FESTIVALS & MERCHANDIZING

- EXPLOITATION INCOMES

BUSINESS CASE A: OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR

ASSUMPTION 1: Quality of waves as the key succes factor.

ASSUMPTION 2: Key rendibility parameter is cost of energy.

ASSUMPTION 3: (A, M, B) income modes impact operational rendibility.

We fit freq. (n) to occupancy (N) (parctical variable) over minimum Tc & max. ROD.

ASSUMPTION 4: INCOME>6 EXPLOT. COST or ROD>5 EXPLOT. COST

 A matematic model is needed

P: Cost KW-h paied

Nc : Users queuing

n: Frequency (waves/minute)

PF: Forfait ticket fee

EO: Energy per Wave [kW-h]

CP: Personnel costs (2 Monitors/d)

CMD: Dairy maintenance cost (1 revision/week)

N: Ocuppancy (Users)

tO: Wave time duration [s]

tC: Queuing waiting time [s]

OC: Wave occupancy[users/wave]

tp: Time resting at beach [s]

a: Rest factor wave-wave

Np : Users surfing.

ASSUMPTION 5: Elapsed time between waves (number of forfaits, N)

- EXPLOITATION INCOMES

Wave generator

Nc(t)

n

Np(t)= OC x n x (to + tp) = N – Nc(t)

tc

to

tp

1-a

a

- OC x n x (1/60) + (1-a) x []

(ROD) = N x PF – [n x EO x P x 60 x 12 + CP + CMD]

- EXPLOITATION INCOMES

A HIGH OCCUPANCY N > 150 n ~ 2-3 /min.
M MEDIUM OCCUPANCY 50 < N < 150 n ~ 1-2 /min.
B LOW OCCUPANCY N < 50 n < 1/min.

- EXPLOITATION INCOMES

BUSINESS CASE A: OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR

A

M

B

B

M

A

- EXPLOITATION INCOMES

DAILY OPERATIONAL INCOMonth [€euros]

QUEUING TIME [seconds]

Users [forfaits sold]

BUSINESS CASE A: OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR

> 25-30 users/day... Threshold for acceptable cost effectiveness [Low Occupation Modes (B)].

Guarantee- it with previous booking (ex. Web)

Maximum occupancy :: 220. Users/day higher not cost effective.

If N > 150 is guaranteed.... Highest cost effectiveness.

Marketing & ways to attact users (steadily) is very important.

Aggressive commercial & advertising needed.

- EXPLOITATION INCOMES

BUSINESS CASE A: OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR

Under realistic conditions (60 forfaits/d in winter.

The (ROD) [= INCOMonth - COSTS] minimal 1000€/d.

The payback tiMonth are short (< year) with low occupancy.

  SOLUCIO A SOLUCIO B SOLUCIO C
A, HIGH OCCUPANCY 14 days 20 days 29 days
M, MEDIUM OCCUPANCY 28 days 40 days 60 days
B, LOW OCCUPANCY 140 days 200 days 300 days

Other variable incoMonth (shop, courses, events, …) no computed.

- EXPLOITATION INCOMES: Conclusions

BUSINESS CASE A: OPERATION OF ARTIFICIAL SURF WAVE PROTOTIPICAL DEMONSTRATOR

Business?

47

PRODUCT SALES OR SERVICE (in €)
  FORFAITS SHOP TRINING EVENTS Total
Month 1 0,00 0,00 0,00 0,00 0,00
Month 2 11.998,00 0,00 0,00 0,00 11.998,00
Month 3 11.998,00 499,95 1.999,98 0,00 14.497,93
Month 4 35.994,00 999,90 1.999,98 0,00 38.993,88
Month 5 35.994,00 4.999,50 1.999,98 2.999,99 45.993,47
Month 6 89.985,00 4.999,50 4.999,95 0,00 99.984,45
Month 7 89.985,00 9.999,00 9.999,90 11.999,96 121.983,86
Month 8 89.985,00 9.999,00 9.999,90 11.999,96 121.983,86
Month 9 35.994,00 4.999,50 4.999,95 0,00 45.993,45
Month 10 11.998,00 999,90 1.999,98 2.999,99 17.997,87
Month 11 11.998,00 0,00 0,00 0,00 11.998,00
Month 12 0,00 0,00 0,00 0,00 0,00
Year 1 425.929,00 37.496,25 37.999,62 29.999,90 531.424,77
Year 2 468.521,90 41.245,88 41.799,58 32.999,89 584.567,25
Year 3 562.226,28 49.495,05 50.159,50 39.599,87 701.480,70

48

49

50

51

52

Finnantial Cost effectiveness

Financial appeceament

indebtedness

MARGIN ON SALES

ECONOMIC Cost effectiveness

SOLVENCY

WORKING CAPITAL

ROtATION ON SALES

YEAR 1

YEAR 1

YEAR 1

YEAR 1

YEAR 1

YEAR 1

YEAR 1

YEAR 1

YEAR 2

YEAR 2

YEAR 2

YEAR 2

YEAR 2

YEAR 2

YEAR 3

YEAR 2

YEAR 2

YEAR 3

YEAR 3

YEAR 3

YEAR 3

YEAR 3

YEAR 3

YEAR 3

53

BUSINESS PLAN B: MANUFACTURING AND COMMERCIAL EXPLOITATION OF WAVE GENERATORS

Industrial Project

54

As Business Plan (larger) Option (B) a possibility would consist of manufacturing and selling (or franchising) facilities all along the Mediterranian coast.

Huge commercial potencial option to develop in Spain, France, Italy, Tunisia, Croatia, Greece,.. and other Mediterranian countries.

Business Model Case A is used as prototyping experience case for a medium-long term development (> Summer 2022)

Now, the proposal consists in developing, selling and installing (not exploiting) wave generators devices “turnkey project”.

INDUSTRIAL PROJECT (Manufacturing) at own workshops.

BUSINESS PLAN B: MANUFACT. & COMMERCIAL EXPLOIT. OF WAVE GENERATORS

55