Use of Figures and Tables
Getting the most out of figures and tables
Engineering documents often present large amounts of data. Often these data are easiest for readers to understand in a visual form: a figure or a table. To be effective, tables and figures must be easy to read and properly formatted. They must also be clearly referenced in the text of the document. If your department, course, or firm has specific formatting requirements, follow them. This lesson covers typical requirements.
Guidelines for figures
Figures include graphs, charts, photographs, maps, drawings and any other visual that is not a table.
1. Below every figure there must be a number and a caption. For example: Fig. 1: Plan View Figure 3: View of typical cracking pattern at counterfort retaining wall section
2. The caption should be brief but complete. 3. If the figure is a graph, all axes must be labelled (with units as appropriate). A legend must be
provided if there is more than one set of data plotted on a single graph. 4. In the text, refer to figures by their number. Do not use “in the following figure” or “in the figure on
the previous page .” Always use the figure number.
Example 1: Image figure (from DC Engineering, 2012)
Figure 1: Regional Fault Map (Idaho Geologic Survey, 2010)
2
Example 2: Graph figure (from Chapuis and Aubertin, 2003)
Figure 9: Predicted versus measured k-values for the sand tested by
Chapuis et al. (1989a) in the vertical direction after static compaction
Guidelines for tables
A table is a list of numbers or text (words) in columns.
1. Above every table there must be a number and a title. For example: Table 1: Special status species observed within the basin Table 6: Water content and dry unit weight of samples retrieved from the site
2. Every column in the table must have a label. 3. Any footnotes should follow directly below the table.
a. Footnotes that pertain to the entire figure should start with “Note:” . For example: Note: CH = crosshole; DH = downhole; SH = suspension logger
b. Footnotes that pertain to only part of the table should use superscript numbers or letters to identify where the notes apply . For example: a Year designated, b Year proposed
4. In the text, refer to tables by their number . Example 3: Table of population numbers (from Vanasse Hangen Brustlin, 2004) Table 2-1: Population Comparison, 1980-2000
Location 1980 1990 2000
Change 80-90
(Percent)
Change 90-00
(Percent)
Ossipee 2,465 3,309 4,211 43.2 % 27.3 %
Carroll County a
14,035 18,021 23,298 28.4 % 29.3 %
New Hampshire 920,475 1,109,786 1,235,786 20.5 % 11.4 % Source: Lakes Region Demographic Profile, LPRC a Lakes Region Portion
3
Example 4: Table of species status information (from US Army Corps of Engineering, 2013) Table 1. Special Status Species Observed within the Basin
Common Name
Scientific Name
Federal
Status
Critical
Habitat 1 CDFG
2
Federal
Register
Date
Listed
Nevin's barberry
Berberis nevinii Endangered 2008 2009 63:54956 13-Oct-98
Coastal California gnatcatcher
Polioptila californica californica Threatened 2007 3 2008 58:16757 30-Mar-93
Least Bell's vireo
Vireo bellii pusillus Endangered 1994
2003
(2009 4 )
51:16482 2-May-86
Source: USFWS 2010, CDFG 2010 1 Year designated
2 Last observed in Basin
3 Year proposed
4 Last observed according to Corps data
Placement of figures and tables
For coursework, tables and figures are usually placed after the paragraph where they were first referenced. If they do not fit on that page, place them on the next page. Very large visuals, such as those that require fold-out pages, may be placed at the end of the document. In workplace practice, some firms still put all the tables and figures at the end of a document. Check with your instructor or supervisor if you aren't sure about the requirements for placing figures and tables.
Exercise
The following data were collected during a geotechnical site investigation. Decide whether a figure or
table is the most appropriate visual. Then create the visual, formatting it effectively.
Sample 1 was taken from a depth of 3.7 feet. It had a moisture content of 13.1%, total unit
weight of 105 pounds per cubic foot, and dry unit weight of 93 pounds per cubic foot.
Sample 2 had a moisture content of 11.1%. It was taken from a depth of 5.6 feet. It had a dry
unit weight of 101 pounds per cubic foot. Its total unit weight was 112 pounds per cubic foot.
Isn't it obvious why the table or figure is included?
Some students work hard to create figures or tables for their documents, but then they never refer to them in the text. If you do this, you leave it up to the reader to figure out why that visual is in your document and what part it supports. This is frustrating to the reader and can cause confusion or misunderstanding.
Make sure every table and figure in your document is referenced at the appropriate place in the text. Otherwise, the table or figure might as well be removed from the document, and all that time you spent creating it will be wasted.
4
Sample 3, which was taken from a depth of 7.3 feet, had a total unit weight of 120 pounds per
cubic foot. It had a moisture content of 3.7%, and dry unit weight of 113 pounds per cubic foot.
Sample 4's dry unit weight was 98 pounds per cubic foot. It had a moisture content of 25.2%,
and a total unit weight of 122 pounds per cubic foot. It was taken from a depth of 10.6 feet.
References Chapuis, R. P., and Aubertin, M. (2003). Predicting the Coefficient of Permeability of Soils Using the
Kozeny-Carman Equation. Report EPM–RT–2003-03, École Polytechnique de Montréal
DC Engineering (2012). “Structural Observation and Seismic Evaluation: Pioneer Elementary School, 907 Sharkey Street”, report prepared for Salmon School District, Salmon, ID
US Army Corps of Engineering (USACE) (2013). “Whitter Narrows Recreation Area: Underground Storage Tank/UST Removal Whittier Narrows Flood Control Basin Los Angeles County, California Draft Environmental Assessment”, Los Angeles District
Vanasse Hangen Brustlin, Inc. (2004). “Final Feasibility Study: Ossipee Transportation Center”, Report prepared for New Hampshire Department of Transportation, Concord, New Hampshire
© Portland State University (PSU) and others 2015. Contact: Susan Conrad, [email protected] Instructors are welcome to copy, display, and distribute these materials as they appear here and to use them with students provided that they (a) notify PSU that they are doing so and (b) share suggestions for revisions. Individuals are welcome to use the materials for self-study and send any comments to PSU. Other uses of the materials, including making derivatives, are prohibited without permission from PSU. These permissions are valid under a pilot program that expires August 15, 2018. For later permissions or questions contact Susan Conrad ([email protected]). All rights not granted here are reserved. [Lesson 10-v3]
This material is based upon work supported by the National Science Foundation under Grants No. DUE-0837776 and DUE-1323259. Any opinions, findings, and conclusions or recommendations expressed in this material are those of the authors and do not necessarily reflect the views of the National Science Foundation.