Levels of Evidence Table

profileR0bplant
star-et-al-2016-performance-measurement-and-performance-indicators-a-literature-review-and-a-proposed-model-for.pdf

Human Resource Development Review 2016, Vol. 15(2) 151 –181

© The Author(s) 2016 Reprints and permissions:

sagepub.com/journalsPermissions.nav DOI: 10.1177/1534484316636220

hrd.sagepub.com

Integrative Literature Review

Performance Measurement and Performance Indicators: A Literature Review and a Proposed Model for Practical Adoption

Sequoia Star1, Darlene Russ-Eft1, Marc T. Braverman1, and Roger Levine2

Abstract Performance measurement systems (PMSs) are developed and implemented to support the accomplishment of objectives of an organization or organizational initiative. PMSs are structured to enable monitoring of performance. This monitoring is accomplished through the identification of areas of concern and success, with the ultimate goals of developing organizational capabilities and enhancing organizational learning. This article reviews the literature on performance measurement and its implementation, and proposes a model to guide the development and implementation of PMSs. The article concludes with a consideration of the broader implications of PMSs and provides recommendations for future research in PMSs with regard to human resource development.

Keywords performance measurement, performance indicators

Decades ago, performance measurement systems (PMSs) were generally under- taken to broaden an organization’s accounting systems (Neely, 1999). In the 1940s and 1950s, there was a growing recognition of Japanese industries’ high effi- ciency and success. Subsequently, Western companies sought to replicate Japanese

1Oregon State University, Corvallis, USA 2Independent Consultant, Redwood City, California, USA

Corresponding Author: Sequoia Star, Sequoia Star Consulting, Oregon State University, 69211 Three Mile Road, North Bend, OR 97459, USA. Email: [email protected]

636220 HRDXXX10.1177/1534484316636220Human Resource Development ReviewStar et al. research-article2016

152 Human Resource Development Review 15(2)

performance management practices. This attempt led to the blossoming of the field of performance measurement (PM) during the 1970s and 1980s (Nudurupati, Bititci, Kumar, & Chan, 2010). This growth culminated in the 1990s, in what has been termed a “revolution” in the field of PM (Neely, 1999). In the span of about 2 years, close to 4,000 articles were published on the topic, which tallies to “one new article on business performance every five hours of every working day“ (p. 207). While the rate of article production has waned, interest in performance metrics is still keen.

Presently, the norm for measuring organizational and initiative outcomes is through the use of PMSs (Nudurupati et al., 2010). The goal of PMSs, as related by Harbour (2011), is to “provide performance-based data that can be easily converted into action- able performance-based knowledge, thus enabling users to understand, manage, and improve what they measure” (p. 5).

Indeed, a recent article in the Economist (“Management: Reinventing the Company,” 2015) described the emergence of a new type of organization. These new entrepre- neurial entities are not concerned about going public or about accounting procedures; instead, they “measure how they are doing using performance indicators (such as how many products they have produced)” (“Management: Reinventing the Company,” 2015, Section: The New Menagerie, para. 2).

Problem and Research Questions

Although much literature exists regarding PMSs, it exists primarily in the business and management literature. There are only a small number of articles in the human resource development (HRD) literature related to PMSs. Furthermore, these articles have tended to focus on issues of evaluating HRD interventions rather than on measurement of organizational activities. As a result, questions still remain concerning ways of choosing and implementing PMSs. In the effort to examine these concerns, the follow- ing are the questions guiding the present work:

Research Question 1: What does the literature say regarding PMSs and their cre- ation and implementation within organizations? Research Question 2: Based on this literature, can a general model be developed for implementing PMSs? Research Question 3: Using this literature and the developed model, what are the implications for HRD research and practice? Specifically, what might be under- taken to further organizational work using PMSs?

Given these questions, we offer a model for use in developing and implementing a PMS. Such a model will enable practitioners to determine appropriate interventions to aid individuals, groups, and the organization in the use of the PMS adopted by the organization. This model is followed by suggestions for HRD practitioners. We also provide recommendations for continued research on issues related to PMSs in HRD and organizational development.

Star et al. 153

Methods for Conducting the Literature Review

This literature review was conducted around a strategic framework as discussed by Torraco (2011). Journal articles, books, online resources, and other literature related to PM were identified through keywords drawn from the themes, specific subjects, and PM areas of focus. Key search terms included performance indicators, performance mea- surement, PI, KPI, organization and performance indicators, private industry perfor- mance indicators, governmental performance indicators, foundations and public sector performance indicators, organizational constraints performance indicators, performance indicators and learning, performance indicators and accountability, dashboards, performance prism, development of performance indicators, organizational change per- formance indicators, politics performance indicators, social conflicts performance indi- cators, limitations performance indicators, and emerging patterns performance indicators. Databases and resources searched included Academic Search Premier, Business Source Premier, EBSCOhost (includes Medline), Education Research Complete; ERIC; LexisNexis Academic, Nursing Resource Center, Nursing and Allied Health Collection, Nutrition Abstracts, ProQuest Direct, PsycINFO, WorldCat, and a regional library sys- tem catalog. The abstracts of 188 sources were reviewed. Those articles found most relevant to the keywords, as related to HRD, were chosen for inclusion. Articles not relevant to PMS development and implementation and those not related to PMS in HRD were rejected. In addition, the following journals were searched: Advances in Developing Human Resources, Human Resource Development International, Human Resource Development Quarterly, and Human Resource Development Review.

Identified resources were reviewed through a multistage process. First, article abstracts were scanned and archived. Next, selected references were placed under their germane topic headings in a working outline, similar in use to a concept matrix (Webster & Watson, 2002). Complete readings were then conducted, and further screening ensued. In addition, numerous older articles were identified through the citations and reference lists of newer sources.

As noted, we then synthesized the findings from this review into the creation of a model for the development of a PMS by organizations. The model emphasizes com- munication and systematic decision making, while recognizing the flexibility needed to be relevant across a range of organizational contexts.

Definitions

Performance Measurement is defined as “the process of quantifying the efficiency and effectiveness of past [organizational] actions” (Neely, Adams, & Kennerley, 2002). The PMS is defined as the mechanism by which organizations engage such processes.

The term performance indicator (PI) is applied in various disciplines in numerous ways. Organizations often engage with what they identify as PIs when in fact they are operationalizing other PM tools. This misapplication of terms and concepts often results in miscommunication:

154 Human Resource Development Review 15(2)

The words frequently used in the performance measurement field include performance measure, metric, performance indicator, key performance indicator (KPI), key result indicator (KRI), performance measure, lead indicator, lag indicator, initiative, strategy, goal, objective, target, priority, critical success factor (CSF), key result area (KRA), strategic theme, vision, mission—and no doubt many more. The problem isn’t the sheer volume of words we use. The problem is that we use them differently, with varying and overlapping meanings, and we fail to explain our meanings to each other. (Barr, 2014, paras. 1 and 2)

Parmenter (2010) distinguished four distinct types of performance measures:

(a) Key result indicators (KRIs) tell you how [well] you have done in perspective or [what] critical success factor [may exist]; (b) Result indicators (RIs) tell you what you have done; (c) Performance indicators tell you what to do; and (d) KPIs tell you what to do to increase performance dramatically. (p. 1)

Key result indicators (KRIs) are expressed as measures which provide the vision of where you are going by “giving you a picture of whether you are traveling in the right direction. They do not, however, tell you what you need to do to improve results” (p. 2).

RIs summarize activity and all financial performance measures are RIs. . . . KPIs represent a set of measures focusing on those aspects of organizational performance that are the most critical for the current and future success of the organization. (pp. 3-4)

PIs are

instruments that tend to [denote] the health, progress and/or success of a project, process, or area of service delivery. They focus on resources and processes that are most likely to lead to successful outcomes and are usually short, focused, relevant, measurable, repeatable, and consistent. (smartKPIs.com, 2010, para. 2)

Furthermore, PIs, as a measure of an organizational goal, help teams align themselves with their organization’s strategy. PIs are “nonfinancial and complement the KPIs; they are shown on the scorecard for each organization, division, department, and team” (Parmenter, 2010, p. 3). In addition, PIs are not expressed in financial terms; they are appraised on a short-term basis (daily, weekly, monthly, or quarterly) and are ordinarily reported on a team’s scorecard (or other reporting format); they are tied to specific activi- ties and therefore to specific teams, and the activity to which they are aligned affects at least one of the organization’s critical success factors. Bours (2014) noted that indicators and measures are two distinct concepts. For example, an indicator of a table’s size is that it can seat six people, while a measure of its size describes it as 6 feet by 3 feet.

PMS Usage

Most PM frameworks have the capacity to accomplish a number of beneficial out- comes. A partial list, as suggested by Artley and Stroh (2001), includes (a) identifying

Star et al. 155

goals; (b) surfacing and correcting issues; (c) portraying and enhancing processes; (d) detailing progress; (e) helping to determine effectiveness and efficiency of programs, processes, and individuals; (f) determining if initiatives are fulfilling vision and meet- ing strategic goals; (g) providing assessable results for goals; and (h) determining effectiveness of specific parts of organizations. For these outcomes to be realized, as noted by the U.K. Audit Commission (2000), PMSs should possess the following characteristics: clarity of purpose, focus, alignment with organizational goals, balance, regular refinement, and robust PIs (Given, 2005).

Lines (2005) suggested that PMSs can be used for institutionalizing organizational change, while Alagaraja and Shuck (2015) indicated that PMSs align organizational learning efforts with strategic planning activities. Stolz and McLean (2009) argued, in an analysis comparing three HRD interventions focused on corporate citizenship and organizational development, that one of the important organizational subsystems was the PMS. Improving the efficiency of organizational functioning was found to increase employee involvement, although it proved difficult to implement because of the changes that it required in PMSs and other management systems.

Private industry employs numerous types of PMSs. Some of the more notable include the following: (a) Strategic Measurement and Reporting Technique (Cross & Lynch, 1988), (b) The Performance Measurement Matrix (Keegan, Eiler, & Jones, 1989), (c) Results and Determinants Framework (Fitzgerald, Johnston, Brignall, Silvestro, & Voss, 1991), (d) Balanced Scorecard (BSC; Bhagwat & Sharma, 2007; Kaplan & Norton, 1992, 1996a, 2001), (e) Cambridge PMSs Design Process (Neely et al., 2000), (f) Integrated PMSs (Bititci, Carrie, & McDevitt, 1997), (g) Performance Prism (Neely et al., 2002), and (h) European Foundation for Quality Management Business Excellence Model (European Foundation for Quality Management, 1999); (Nudurupati et al., 2010). Firms apply these and numerous other PM models to appraise various aspects of organizational success.

In one study, Eker and Eker (2009) examined data from 122 Turkish manufacturing firms to analyze their implementation of diverse PM frameworks with respect to orga- nizational culture. Their work clarified a number of utilizations of PM, including moni- toring, attention focusing, strategic decision making, and legitimization, that is, utilizing PMS to obtain a base for strategic or ordinary decisions (Malina & Selto, 2001). Of interest was the finding that firms which employ PM exclusively for monitoring and legitimization have a top-down “control” cultural structure, while organizations that utilize PM for a variety of functions in addition to monitoring (e.g., focusing attention and strategic decision making) have a more “flexible” organizational culture.

Governmental and nonprofit PM models used for creation, implementation, and management of PIs have many similarities with that of the private sector (Neely, 1999; Osborne & Gaebler, 1992). For example, with increasing pressures on governmental agencies to enhance performance and with the financial crisis of the last decade, eco- nomic efficiency considerations have become increasingly important to public-sector PM. However, in comparison with the private sector, financial considerations play a smaller role in the pressure to measure performance (Mackie, 2008). As of 2004, he noted, governmental efforts to measure agency performance had evolved into attempts

156 Human Resource Development Review 15(2)

to measure a society’s overall quality of life. As noted by Ogata and Goodkey (2002), “Economic and financial indicators can only provide a limited perspective of the over- all well-being of society” (p. 261). Instead, there is an increased effort to measure societal indicators. Other researchers shared that their own efforts to quantify such qualitative indicators posed a challenge. This was a sentiment echoed by many (Chen, 2010; Kaplan & Norton, 1996a; Parmenter, 2010).

Popular PM Frameworks and Systems

Many PM frameworks exist with which to measure performance. Organizations, including public, private, and nonprofits, often meld or adapt PM frameworks to meet specific needs. Over the course of decades, this process of “smorgasbord” framework development by, multitudes of organizations, has created dozens if not hundreds of hybrid frameworks, most of which have not been reported in the literature (Boland & Fowler, 2000; Chow-Chua & Goh, 2002; Gooijer, 2000; Pun & White, 2005).

However, a systematic comparison of 10 explicit PM frameworks/systems was conducted by Pun and White (2005). The study examined six dimensions of perfor- mance, seven characteristics, and nine specifications and requirements related to the listed frameworks. In terms of ranking, the Cambridge PM Process (Bourne, Mills, Wilcox, Neely, & Platts, 2000; Neely et al., 1996) scored highest with com- pliance in all 22 of the criteria for performance. The Integrated PMS (Engineering and Physical Sciences Research Council, 1998; Bititci et al., 1997) and the Dynamic PMS (Bititci, Turner, & Begemann, 2000) ranked second, with 21 criteria. The most popular of the PM frameworks, the BSC (Kaplan & Norton, 1996a, 1996b, 2001) met 16 of the 22 criteria expressed by Pun and White and tied for seventh in their ranking.

Given the myriad options, making decisions about which frameworks to consider is a challenging process. The relevance of specific frameworks will vary for different types of organizations. Therefore, we begin by exploring strategic PM, and then move on to consider some of the better known and more commonly used approaches to the application of indicators.

Strategic PM

Strategic performance measurement (SPM) is a PM framework with the intentioned goal of impacting organizational strategy. As argued by Micheli and Manzoni (2010), the differences between SPM and other PMSs go well beyond semantic distinctions. Strategic performance measurement is unlike other measurement frameworks, in that it does not have as its focus one single project that aligns with current organizational purposes. Strategic PMSs (or SPMSs) are more detailed and designed to employ indi- cators incorporating multiple perspectives and causal linkages in their design, while operational PMS is concerned with more routine functions and activities of a business or organization (e.g., customer service, product fulfillment functions). These differ- ences are considered the major distinction between the two.

Star et al. 157

The many potential functions of SPMSs can be grouped into four key roles. The first is “Diagnostics” which relates to strategy implementation. The second is the “Interactive role,” which reflects the use of SPMSs as a tool for communication both within the organization and with external stakeholders. This Interactive role is used to facilitate the development of new strategies. Third, SPMSs can be viewed as “Communication tools” when they are utilized to impart the core values, mission statements, and vision statements of organizations. The final role is that of “Boundary systems.” This function of the SPMS is developed to establish and enforce employee behavior within the organization. Micheli and Manzoni (2010) further noted that a SPMS is utilized to examine feedback loops which include both past performance and strategic objectives. Within the SPMS framework, it is impor- tant that each indicator be concretely defined in the design process and communi- cated during its execution.

BSC

The BSC can be viewed as a strategic organizing framework for action. The philoso- phy behind BSCs is that of, balancing functions; that is, making them equally weighted, reduces competition between functions (Artley & Stroh, 2001; Kaplan & Norton, 1996a). A balance is struck between short- and long-term goals, financial and nonfi- nancial indicators, and internal and external performance perspectives (Kaplan & Norton, 1996b). Ultimately, the BSC is considered a PMS, strategic management sys- tem, and communication tool (Kaplan & Norton, 1992, 1996a, 2001).

Scorecards can vary depending on the type of organization (for-profit vs. nonprofit; Chen, 2010). The number of perspectives that are measured can also vary depending on need. In addition, the chief indicators used in most models, such as financial mea- sures, need not rank prominently in all models. As an example, “the mission of gov- ernments and non-profit organizations should be placed at the top of the balanced scorecard to measure its success” (p. 3007). However, Chen argued that nonprofits can learn from the for-profit sector to consider costs more closely. He suggested that after the mission and vision, the following should be considered: “(1) the financial and customer perspectives, (2) the internal process perspective, and (3) the learning and growth perspective” (p. 3010).

In terms of reporting, BSCs offer the ability for management to view an organiza- tion’s activities, initiatives, and/or project functions with comprehensive graphics. One purpose for launching a scorecard framework process is to mobilize the organiza- tion in a new strategic direction (Kaplan & Norton, 1996a). Schiff (2008) noted the importance of discussions, involvement, and approval of senior managers throughout an organization for the strategic development of BSC.

According to Kennerley and Neely (2004), the BSC model explicitly ties organiza- tional strategy with measurement. However, Pun and White (2005) offered a more critical assessment, noting that the BSC does not link operations to strategic goals, does not provide fast or accurate feedback, is not considered easy to maintain, and typically does not involve key users during the development process. Ultimately, Pun

158 Human Resource Development Review 15(2)

and White noted that to accomplish intended outcomes PMSs must be integrated into organizational structure, align with current strategies, and include consistent improve- ment actions, which they contend that the BSC does not always do.

BSC implementation. Kaplan and Norton (1996a) noted the following as first steps in implementation: (a) clarify the organization’s vision and strategy, (b) communicate the strategy through management level, (c) launch cross-organizational strategic initia- tives, and (d) each team develops its own strategies which are consistent with the organizational vision. These initial steps are generally implemented within the first year of scorecard development.

Further necessary actions for scorecard development are addressed in depth by Kaplan and Norton (1996a). Upon team completion of scorecards and strategies, approval for the plan and its implementation is sought. At a minimum, a monthly review of a team’s work is recommended, with quarterly strategy meetings also desir- able. Subsequent refinement of the vision and updating of the scorecards are regularly scheduled and iterative processes. At the end of the first year, when management is satisfied with the strategy’s approach, the BSC can be disseminated throughout the organization. At this point, individual performance measures and incentives for par- ticipants at all levels of the organization are tied to the scorecard. During the second year of implementation, review and updates of a 5-year vision and budget for each perspective on the scorecard can begin, while monthly and quarterly meetings con- tinue. Annual strategy meetings are also encouraged to make major course adjust- ments. By the end of the second year of scorecard implementation, all staff objectives should be tied to the scorecard through linkages to compensation.

Dashboards

Dashboards are often confused with BSCs or other PMSs, although they are distinct. A dashboard is used as a reporting mechanism for PM. According to Schiff (2008),

A dashboard is a graphical display, ideally suited to share the status of the various performance measures that make up the scorecard. Dashboards use familiar objects such as gauges, stoplights, and [other] graphs to make the performance information more intuitive to a wider audience. (p. 29)

As an example, a set of traffic light icons would be used to “signal variations from performance measure target values. A red light attracts the greatest attention for a sig- nificant undesirable deviation from target . . . A yellow light indicates caution for smaller deviations, or a trend toward a significant deviation” (p. 63).

The usefulness of dashboards is their ability to provide performance information in a timely and functional display. This capacity, in theory, increases the likelihood that superior decisions can be made (Bremser & Wagner, 2013). Potential additional ben- efits experienced through the use of dashboards can be the reduction of information overload, identification and filtering of critical information, and the replacement of complicated or boring reporting systems.

Star et al. 159

Dashboard implementation. The use of dashboards as a reporting mechanism is encour- aged by PM experts (Allio, 2012; Bourne et al., 2000; Few, 2006b); however, there are factors to consider with regard to their development and implementation. Bremser and Wagner (2013) suggested that dashboard development involves the following steps: define the dashboard objective and metrics, seek user input, build and test the initial dashboard, and, finally, publish the dashboard and monitor its use.

Few (2006a) shared the 13 most common pitfalls encountered when designing a dashboard, as well as real-life examples of each and strategies for avoiding them. His pitfalls include the following:

(1) Exceeding the boundaries of a single screen; (2) Supplying inadequate context for the data; (3) Displaying excessive detail or precision; (4) Expressing measures indirectly; (5) Choosing inappropriate media of display; (6) Introducing meaningless variety; (7) Using poorly designed display media; (8) Encoding quantitative data inaccurately; (9) Arranging the data poorly; (10) Ineffectively highlighting what’s important; (11) Cluttering the screen with useless decoration; (12) Misusing or overusing color; and (13) Designing an unappealing visual display. (p. 3)

In defining the objectives of the dashboard, it is important to identify its purposes and by whom it will be used (Technology Affinity Group [TAG], 2013). Bremser and Wagner (2013) noted that the dashboard objective most usually utilized by manage- ment is that of realizing strategic goals. Once one has identified the purposes and users, it is beneficial to explore what information users want to see expressed in the dashboard. There is a need for limiting the focus of the dashboard. Expressing too many measures results in taxing people’s “limited working memory for diagnostic activity” (TAG, 2013, p. 65). They suggested engaging in a refinement process to hone measures to those which are the most important to express.

With respect to selecting a dashboard platform, there are many options from which to choose. Some examples offered by the TAG (2013) include Excel, existing grants management systems, plug-in reporting tools, and custom-built tools.. One useful resource for dashboard creation is Information Dashboard Design (Few, 2006b), which is a step-by-step guide for the creation of dashboards. In the end, dashboards are meant to be iterative (TAG, 2013). They need to be examined frequently for continued viability, as data requirements will change and adaptations will need to be made.

Performance Prism

Created by Neely (Neely, Adams, & Crowe, 2001), the performance prism is a second- generation PM framework. This framework considers some of the failings of its pre- decessors and attempts to ameliorate them. The prism refers to facets which encompass a broader view than the contents of BSCs and other initial frameworks.

In contrast to other frameworks, the performance prism considers all stakeholders, even those beyond the shareholder and customer. It suggests that stakeholders include employees, local communities, suppliers, regulatory agencies, and other interested

160 Human Resource Development Review 15(2)

groups. The prism’s founding philosophy supports a reciprocal relationship between the organization and its stakeholders. Of great interest is that Neely and his team’s research failed to turn up considerations of this crucial reciprocal model in any other existing measurement framework. This Stakeholder facet was deemed so vital it is listed as the first facet of the prism.

The second facet is the Strategies facet, which is tied back to the stakeholders and what they want and need. Neely et al. (2001) noted the importance of this perspective by stating, “The only reason an organisation has a strategy is to deliver value to some set of stakeholders” (p. 5). They reiterated that these strategy relationships concern a multitude of stakeholders (including employees, suppliers, customers, investors, as well as the local community) and further emphasized the complex relationships that exist among these stakeholders. These facts need to be acknowledged, and the intrica- cies of such relationships explored.

The third facet is titled Processes, which addresses the processes required for suc- cessful implementation of strategies. A key theme is that a strategy can only deliver results if the organization’s processes are aligned.

The fourth facet, Capabilities, is considered to be the least understood. Neely et al. (2001) explained the Capabilities facet as follows:

Capabilities are the combination of people, practices, technology and infrastructure that together enable execution of the organisation’s business processes (both now and in the future) . . . The key question associated with this facet becomes: “What are the capabilities we require to operate our processes?” (p. 7)

This facet is essential because it allows the organization to identify necessary resources, such as employees, finances, and materials. In addition, it defines the pro- cesses to develop these resources, such as training and mentoring of employees, iden- tifying and obtaining the needed capital, and purchasing needed equipment. Finally, it suggests the ways in which to utilize these resources most effectively.

The final facet is Stakeholder Contribution, which expresses stakeholder relation- ships in a novel way by defining and examining what the stakeholder’s contribution back to the organization will entail. As an example, from the employees’ perspective, in return for job security, fair compensation, and recognition, the organization expects input and effort, in the form of ideas, suggestions, the development of expertise, and staff loyalty.

With respect to the performance prism, indicators and measures have the advantage of unification of measures through the use of “sets of hypothetical relationships termed ‘success maps’” (Najmi, Etebari, & Emami, 2012, p. 3). Another strength is the multi- dimensional detail encompassed by the approach. Such dimensionality helps ensure that any missing measurement can be recognized and subsequently included. In terms of disadvantages, the prism, like the BSC, has the deficiency of failing to include an iterative review process. This lack is a major flaw, given that such a process is seen by many to be especially important (Bourne et al., 2000; Kennerley & Neely, 2004; Neely et al., 2002; Parmenter, 2010).

Star et al. 161

Performance prism implementation. In practice, the application of the performance prism model involves a series of meetings that are used to identify key stakeholders and their needs, examine organizational processes and capabilities, and select and pri- oritize those measures that are both centrally important and capable of implementation (Neely et al., 2001). To facilitate these functions, the authors suggested the develop- ment of a “measures tree . . . which identified the essential linkages between the mea- sures selected for each facet of the Performance Prism framework” (Neely et al., 2001, p. 10).

Other significant considerations include deciding which indicators will answer the identified questions and determining how and where to obtain such information (TAG, 2013). A lengthy and in-depth facilitation process is usually required to reach agree- ment on the information necessary to provide a valid picture.

As noted, one initial insufficiency of the prism model (and most other frameworks) was its lack of an ongoing review process. However, potential solutions have been proposed to address this shortcoming. The work of Najmi et al. (2012) resulted in the creation of a model to address the lack of an integrated review system. They noted two review processes to be considered when implementing PM frameworks: the review of individual measures and the review of the framework’s “supporting infrastructure” (p. 11). Manoochehr, Etebari, and Emami (2012) also offered a remediation for the lack of ongoing review by most models.

A Practical Model for Developing a PMS

To begin, prior to adoption of a framework and development of the PMS, a plan- ning team/group should be assembled. The purpose of such a team is to develop and implement the PMS. Teams should consist of representatives from all major stakeholder groups, including a broad array of organization management and staff (those who will be responsible for implementing the system and those directly impacted by system results). Teams can also include internal or external consultants.

To assist teams interested in choosing and implementing a PMS, we have cre- ated a model which provides the key elements of PMS development and applica- tion. Although guidance for the implementation of a PMS is provided by most PMS developers (e.g., Areana, Arnaboldi, Azzone, & Carlucci, 2009; Bititci, Carrie, & McDevitt, 1997; Bourne et al., 2000; Cavalluzzo & Ittner, 2004; Elg, 2007; Few, 2006a, 2006b; Guerra & Hutchinson, 2013; Harbour, 2011), criteria for choosing a specific framework are rarely provided. In addition, certain PMSs either omit or fail to emphasize concerns and considerations that should be addressed in the operationalization, implementation, and utilization of such a sys- tem. Our model, supported by the previously discussed literature, provides guid- ance and suggestions synthesized from the major frameworks. Moreover, it provides guidance for the selection and development of associated PIs. As illustrated in Figure 1, the model details the sequence of planning, defining, and decision-making activities.

162 Human Resource Development Review 15(2)

Identify Goals and Objectives

The initial step involves identification of the organizational goals and the objec- tives upon which the PMS will be founded. As per Harbour (2011), “A well- developed strategic performance objective clearly states what a system (an indi- vidual or organization) is trying to accomplish (or avoid). It should contain an action verb, the subject matter, and associated performance goals” (p. 6). There are no hard and fast rules about the numbers of goals and objectives on which to focus, but prioritization is advisable. As several PIs can be developed for a single goal or objective, it is wise to focus on only a few objectives, for reasons of both economy and utility.

Figure 1. A model for performance measurement system development.

Star et al. 163

Identify the Function, Audiences, and Frequency of System Use

Next, decisions must be made on the desired function of the information, the potential uses of the PMS’s results, and the audiences or users of those results: Who will be using the information, how frequently it will be used, and for what specific purposes? The team should also identify the primary individuals whose actions will influence goal attainment and the ways in which objective realization might occur. Clarification of the objectives to be assessed by the system and the frequency with which the information will be collected and shared are significant considerations at this step. These decisions, particularly with respect to the audi- ences, affect the transparency of the process and indicate the level of resources that may be needed.

With respect to audience, the literature unambiguously expresses that stakeholder inclusion, buy-in, and engagement are all key elements of the process (Edgar, Geare, Halhjem, Reese, & Thoresen, 2015). It is crucial at all levels of PMS development and implementation that both internal and external stakeholders are queried and involved. It is not uncommon for organizational leaders to overlook input from the persons who will be implementing these systems. Broad inclusivity is necessary to realize buy-in and the success of the PMS. Accordingly, the planning team should include represen- tatives of the user audiences.

During this phase, as well as during the development of the indicators, defini- tional clarity is important. If there is confusion or incongruity around meanings, processes and outcomes can be negatively impacted. Terms and definitions can remain idiosyncratic, reflecting an organization’s internal culture. However, if such terms are used, everyone should know and use them in the same way. It can be useful to create and disseminate an organizational glossary and share expectations for lan- guage at ongoing meetings. Doing so will help to ensure that everyone is sharing the same terminology.

Select PM Framework and Identify Types of Measures

The next two steps, selection of a PM framework and the identification of the types of measures to be included in the framework, should proceed in parallel. Potential frameworks can focus on specific areas of measurement (e.g., customer satisfac- tion, quality, finance, public opinion) and/or on development and implementation aspects (e.g., top management support, evaluation of existing system, set times- cales). The presence of existing (or readily obtainable) measures in areas empha- sized by a specific framework should encourage serious consideration of that particular framework. However, if these measures are not aligned with the PMS’s major goals and objectives, another more fitting framework should be considered. Failure to select a specific framework would prevent a group or organization from realizing the framework’s demonstrated advantages, but would not prevent the cre- ation of a framework-free PMS with previously undocumented strengths and weaknesses.

164 Human Resource Development Review 15(2)

Develop System for Maximizing Benefits of Information

To maximize the benefits of the information collected and disseminated, there must be a shared understanding of how the information will be utilized by the organization. Doing so will guide development of a system with appropriate rewards and sanctions. For example, a system developed for performance assessment (with performance- based rewards and sanctions) will be much less effective for promoting organizational learning than a system whose focus is shared responsibility and goal attainment. Informing staff that a PMS with an organizational learning focus is dissociated from rewards and punishments—and having them believe and internalize this—is challeng- ing and not possible without continuous staff involvement.

Develop PIs and Develop Procedures for Collecting PI Data

The next two steps, development of PIs and development of procedures for collecting PI data, should also be conducted in tandem. When completing these steps, it is impor- tant to keep in mind that PIs should not be merely a wish list of things one would like to measure: If the process of obtaining certain measures is costly or measures are dif- ficult to obtain in a timely fashion, alternatives should be proposed. Conversely, read- ily available data should not be the sole driver of indicator choice, as such data might not adequately assess the indicator one wishes to assess. If the PMS’s objectives include problem identification, the indicators should focus on factors that will reflect short-term progress. One should also be wary of “feel-good” indicators (indicators on which a work group or organization consistently earns very high scores). Such indica- tors rarely lead to effective change or organizational improvements. Having attained certain goals and objectives, other “stretch” goals should be set in an effort to promote organizational learning.

Finally, while many articles noted that financial and numerical measures provide critical quantitative data and can be fairly straightforward, developing accurate nonfi- nancial and qualitative measures is frequently more challenging. Time and effort are required to ensure that qualitative measures are indeed assessing what is desired. Systems and processes need to be defined in ways that will enable their measurement, such as the use of customer surveys to determine customer satisfaction.

There are numerous guides for the development of PIs (e.g., British Columbia, Office of the Auditor General, 2010; National Research Council, 2005; Parmenter, 2010, 2012, 2015). The acronym “SMART” (Government of Canada, 2015; Rozner, 2013) is often used to describe the characteristics of the objectives underlying quality PIs. This acronym stands for

Specific: The objective is clear and describes an observable action or achievement; Measurable: There is a way to assess the objective in terms of its results (e.g., qual- ity, time, quantity); Attainable: The objective of the indicator represents an achievable goal;

Star et al. 165

Relevant: Is the most important aspect of the activity being measured?; and Time-bound: Is there a deadline? Can progress be tracked?

Developing specific PIs meeting these characteristics can be informed by review- ing the literature to identify indicators which have been developed by others with simi- lar goals and objectives. In certain fields, organizations have been created to develop or endorse a standardized set of performance measures. In one discrete sphere, health care, the National Council on Quality Assurance (NCQA; n.d.) was responsible for the creation of the widely used set of measures and indicators that comprise the Healthcare Effectiveness Data and Information Set (HEDIS) (Healthcare Effectiveness Data and Information Set, n.d.). HEDIS includes measures of performance in dozens of health care areas (e.g., advising smokers to quit, breast cancer screening, child and adolescent immunization status, controlling high blood pressure, and prenatal and postpartum care). Similarly, the National Quality Forum (NQF; 2015) reviews and endorses con- sensus health care performance measures and indicators which are valid, evidence based, and accessible to the public. Their measures are presented in a range of broad areas, including cost and resource use (e.g., risk-adjusted resource use by health plan members with asthma in measurement year), efficiency (e.g., percentage of cardiac stress imaging performed in low-risk surgery patients for preoperative evaluation), outcomes (e.g., improvement in mobility using the Care Assessment and Evaluation Tool Mobility subscale), patient-reported outcomes (e.g., the Consumer Assessment of Healthcare Providers and Systems In-Center Hemodialysis Survey, with three sub- scale scores reflecting different experiences of care dimensions), and process (e.g., percentage of patients discharged on beta blockers following Coronary Artery Bypass Graft [CABG] surgery). In addition, standardized procedures for the collection of their approved measures are often provided (NQF, 2015).

Collect, Analyze, and Interpret Data

Indicator data should be subjected to practices that characterize any high-stakes data collection effort. Especially important are checks for accuracy and completeness, as well as issues of validity, reliability, and possible bias associated with the collection of such data. These checks are important in ensuring that the stakeholders and users of the data can be confident in the credibility of the information and its interpretation. If stakeholders have been involved in the entire process of PM and indicator data collec- tion and analyses, these concerns can, to a large extent, be addressed proactively. Nonetheless, even the best designed systems are not perfect. Unanticipated issues will arise; real-world changes will make revisions advisable.

Select Most Useful Reporting Format

Dashboards are a commonly used reporting format but are not the only way to share and report indicator data. Other formats may be those used in annual reports and may rely on graphical forms. As suggested by Torres, Preskill, and Piontek (2005), selecting the

166 Human Resource Development Review 15(2)

reporting format is essential for leading to stakeholder use of the information. Such reporting can aid in building awareness and support, in demonstrating results and accountability, and in decision making about changes and improvements. Thus, keep- ing in mind the information needs of the various stakeholders can suggest the most appropriate formats to convey details.

Regardless of the choice of format, adherence to good graphic design principles, as well as limiting the number of indicators included, are key principles. As with any graphic design, usability testing (Barnum, 2010; Dumas & Redish, 1999; Rubin & Chisnell, 2008) will help identify unforeseen issues and enhance the utility of the indi- cator data. Presentation of results in an attractive and easily comprehensible format can greatly facilitate the information’s utilization.

Disseminate Findings and Conclusions to Stakeholders

Once the reporting format is populated with indicator data, results are disseminated to stakeholders. Failure to disseminate findings and conclusions to stakeholders can raise questions about the impacts of their involvement. Such a failure can also generate questions regarding any subsequent actions which are based on the PMS data.

After data dissemination, meetings are held to “dig deeper” into the meanings of the findings. The data will show whether the initiative and organization are moving in the desired direction or whether course corrections may be indicated. Subsequently, the collection of supplemental information may be necessary to understanding the results. If so, such clarifying information gathering should take place prior to using the reported data to inform potential changes to processes, approaches, and strategies.

Findings should be disseminated on a regular basis. In addition to providing the bases for informing change, staff should become more knowledgeable about the indi- cators and more comfortable in using them for intended purposes. To foster use, man- agement may require action plans based on indicator results.

Iteratively Review Framework and PIs

As shown, PMSs must align with organizational strategies and the structures employed for attaining goals. As those strategies and structures evolve, the choices of PM frame- works and PIs need to be reassessed to ensure that they meet ever-changing needs. To remain relevant, the planning team should reassess the PMS and its attendant PIs on a scheduled (and frequent) basis. Failure to engage in this review and updating will, almost certainly, lead to an outdated system that will become progressively ineffective in helping the organization or initiative meet its goals and objectives.

Upon reassessment, if measures or frameworks are found no longer applicable, they should be reworked (or even abandoned) to accommodate current initiative/orga- nizational need. Toward this end, stakeholders’ ongoing input about the process and its utility will be invaluable. To clarify, such reassessment needs to be inclusive, iterative, and interactive (Franceschini, Galetto, & Maisano, 2007). When PMSs are found to be

Star et al. 167

sound, relevant, and without need of change, the collection of PI data, its analysis, and reporting should continue on an agreed-upon schedule.

Considerations in the Design and Use of PIs

In this section, we discuss issues associated with the identification and overcoming of organizational constraints, while providing guidance for dealing with matters that will likely arise in implementing the model. In addition, accountability and organizational learning, two major goals/objectives of PMSs, are discussed in greater detail, reflect- ing the importance of these goals for HRD. Finally, issues with regard to dynamic and complex systems and their relationships to PM are examined. This topic is worthy of consideration as individual, organizational, and societal factors’ dynamism and com- plexity can exert great influence upon the development and implementation of PMSs.

As previously shown, the PMS can be a powerful tool for identifying progress toward the success of organizational goals and initiatives. In turn, this progress (or lack thereof) can assist in the identification of areas of staff strengths and weaknesses. Such strengths and weaknesses are areas in which HRD interventions, focused on individuals and teams, may be crucial for goal attainment. And, after such interven- tions, effectiveness on organizational goal development can be assessed and a deter- mination made about whether some additional organizational intervention is required for improved performance.

Identifying and Overcoming Organizational Constraints

The successful implementation of PIs, and by extension PM frameworks, is dependent upon the contextual environment within which PIs are employed. Given the number of stakeholders, complexity of the environments, and the number of dimensions (PIs) to be managed, two such contextual issues are power relationships between stakeholders and conflicting stakeholder interests (Covaleski, Dirsmith, & Samuel, 1996). Both of which can lead to an imbalance in dimensions. The more complex the system and the greater the number of stakeholder influences placed upon an organization, the more likely it is that imbalance will result. When there is less conflict between stakeholder groups, even when the power balance between the groups is uneven, the indicators have a tendency to be more balanced.

In their case studies on the dynamics of PM and organizational culture, Bititci, Mendibil, Nudurupati, Garengo, and Turner (2006) found a multidirectional inter- change among organizational culture, management styles, and PM. They argued, “PMS can shape organisational culture and management style, and organisational cul- ture and leadership can affect the success of a PMS initiative,” with well-implemented PMSs leading to a “more participative and consultative management style” (Bititci et al., 2006, p. 1343). They further showed that with success, there were substantial performance improvements and a culture that valued achievement. They concluded that “management styles need to evolve as the maturity of the PMS and the organisa- tional culture evolves” (Bititci et al., 2006, p. 1344). The organizational cultures

168 Human Resource Development Review 15(2)

examined were shown to initially exhibit a more dominant top-down less consultative power base. Ultimately, cultures evolved toward a more consultative management style, though this progression required influences external to the organization.

In our proposed model, the early steps focus on sorting out questions related to organizational issues such as those listed above. For example, Step 2 involves identi- fying the functions and audiences for the developing PMS. In this process, differences in perspective between stakeholder groups, which may cause disagreement over appropriate usage, can be identified and resolved. In the step Select PM Framework, the selection process should take into account specific organizational characteristics, such as organizational culture and communication patterns.

Accountability

One major focus of consideration, with regard to PMSs, is that of accountability. Using PM for accountability purposes can provide information on whether an organization is connecting the lines between reality and vision. As we have discussed, PMSs and PIs aid organizations in making clear an initiative’s goals or a strategic direction. Furthermore, PMs suggest the work that needs to be undertaken and the departments or teams and the people responsible for that work. In turn, these functions can lead to identifying the departments, teams, and groups responsible for achieving or failing to achieve the strategy. J. Watkins and Drury (1999) conducted a series of group discus- sions with managers and professionals in the United Kingdom’s financial services sector, which focused on determining how changing organizational structures influ- ence professional skills and roles. One major finding of these interviews was that there is a movement toward greater accountability and PM.

While some research exists on process and outcome accountability, most of the literature discussed the misuses and negative and/or unintended consequences of accountability measures. In addition, these studies “represent a mere scratch on the surface of the complex concept of accountability . . . other facets of accountability are awaiting empirical exploration” (Ossege, 2012, p. 602).

As per Hailey and Sorgenfrei (2005), performance improvement, accountability, and learning are roles that are “often at odds with each other and tensions are provoked around this accountability-learning dichotomy” (p. 2). Discussions regarding account- ability versus learning generally revolve around which takes precedence and to what degree each is employed. The answer to these questions is often context dependent.

In the public sector, managers often “lament about perverse effects of accountabil- ity” (Ossege, 2012, p. 586). One such example was shared by Smith (1995): when faced with difficult decisions for which they will be held to an accountability standard, managers often choose to pass these decisions off to others, thereby maintaining their own high success rates. Such fear responses can be mitigated through assurance, and subsequent follow through, that PI outcomes will be utilized as educational and course corrective tools. Ultimately, according to Patton (2011), PM, from the macro to the micro, can help to answer the questions of accountability: Is the initiative focusing on its original intents? Is there a collective responsibility for outcomes?

Star et al. 169

Organizational Learning

Organizational learning represents another critical management objective for PIs and PM frameworks, including the measurement and promotion of that learning. Organizational learning can be viewed as the acquisition of information for the pur- poses of sharing and interpreting; and such sharing and interpreting can foster iterative strategic alignment and improved feedback systems (Argyris, 1977; Argyris & Schön, 1974, 1978). It is through such feedback systems, particularly those which include error detection and correction, that organizational learning is enhanced (Argyris & Schön, 1978; K. E. Watkins & Marsick, 1992).

According to Srimai, Damsaman, and Bangchokdee (2011) in their study of the Thai government’s use of PMS and organizational learning and its influences on stra- tegic alignment, achieving strategic alignment requires the distribution of knowledge and information within and among departments. Given PMS’s capacity to encourage both vertical and horizontal dialogues within an organization, the processes of devel- oping and implementing such systems enhanced capacity for alignment with initiative goals. Accordingly, “The translation and deployment of SPMS [strategic performance management systems] foster strategic alignment as it triggers strategic dialogue and discussion throughout an organization” (p. 60). This strategic dialogue became the practice of sharing and interpreting of information for goal alignment and feedback. Strategic PMS development and deployment had the benefit of creating internal con- sistency through sharing, discussion, the debates it generated, and the organizational learning it produced.

The frequent use of PM frameworks as tools for learning “belies the picture that they are merely instruments of managerial control or mechanisms for accountability” (Hailey & Sorgenfrei, 2005, p. 3). It has been shown that PMS activities engaged in for learning’s sake have a greater impact on overall organizational learning than do PMS activities focused on diagnosing problems (Srimai et al., 2011). While necessary for episodic review of indicators, Henri (2005) found a significantly negative relationship between the diagnostic use of PMSs and organizational learning. Even in light of this finding, it remains true that “given the lack of reliable information about investments in HRD, organizations can be expected to invest conservatively and satisfice rather than maximize employee learning and performance needs” (Kuchinke, 2003, p. 306). To whatever degree PM is used for learning, there remains a prevalent contrary belief that such measurement is used to comply with formal requirements as opposed to organizational development.

Kleiner (1997) reinforced these concerns regarding the placement of excessive emphasis on measurement with his aptly titled work, When Measurement Kills Learning. He argued that those who feel the need to focus attention on meeting mea- surement goals have less time to spend on, and less inclination toward, learning activi- ties. Furthermore, he suggested that learning is often a messy process; mistakes are inherent. Deep and transformative learning can only take place in environments where risk is allowed and support is provided (Russ-Eft, 2002). Thus, environments that promote a climate of trust and courage are most conducive to learning (Botcheva,

170 Human Resource Development Review 15(2)

Roller White, & Huffman, 2002). The arguments concerning the use of PMS to moni- tor and measure performance only, in contrast to its use for organizational learning, bear some similarity to the arguments undertaken concerning a focus on performance (Swanson, 1995) versus on learning for HRD (Alagaraja, 2012; Marsick & Watkins, 1999, 2003; O’Neil, Watkins, & Marsick, 2010).

Dynamic Complex Systems

The development of a PMS takes place within the context of individual, organiza- tional, and societal factors. All of which interact at every level in multidirectional relationships (Guerra & Hutchinson, 2013). These contexts constitute dynamic and complex systems.

Yawson (2012) defined complex systems as “interconnected parts that exhibit con- certed properties as a whole which are different from the properties exhibited by the individual constituent parts when acting alone” (p. 57). Such dynamic complexity and change have proven impacts on organizational, initiative, and personnel performance (Hailey & Sorgenfrei, 2005; Russ-Eft & Preskill, 2009; Szabla, 2007). As the disci- pline of PM seeks to attend to greater and greater system complexity, it develops newer, more detailed PM frameworks. These newer frameworks depend upon more sophisticated PIs and integrated multilevel and multidimensional structures (e.g., Fisher & Sleezer, 2003; Sleezer, Russ-Eft, & Gupta, 2014; Upton & Egan, 2010). However, in opposition, many practitioners are seeking greater simplicity and ease of applicability for PMSs (Hailey & Sorgenfrei, 2005).

Related to complexity, organizational and initiative dynamism (Bánáthy, 1996, 2000; Yawson, 2012) leads to new opportunities for engaging PMSs. As noted by Yorks and Nicolaides (2006), “Complex systems may [initially] seem simple but are dynamic, ever interacting as they evolve in a nonlinear way” (p. 145). This degree of unpredictability can make outcome measurement difficult.

One tool used for inquiring into a potentially complex initiative and organizational change is the examination of historic milestones (Hailey & Sorgenfrei, 2005). In this case, a comprised team, representing different divisions of the organization, meets to create a timeline for the organization, identifying past events and suggesting future events or goals. Such an activity can help disparate segments of the organization learn from one another to understand the problems confronting the organization. In turn, identified goals can then serve as candidate goals for the PMS.

Another related approach is that of the Future Search process (Dewey & Carter, 2003; Weisbord & Janoff, 1999). A Future Search process is particularly effective when there are conflicts to be resolved, as in situations of a merger or a change in direction for the organization. Such a process typically includes a large number of diverse stakeholders, potentially anywhere between 80 and 300 people. The process entails the examination of past landmarks, which can help to unite the diverse factions of a complex and changing organization, and therefore make it less challenging to deal with uncertainty in establishing future goals. The identified goals can then serve as candidate goals for a PMS.

Star et al. 171

A third approach to planning during uncertainty involves the use of scenario plan- ning (Chermack & Lynham, 2002; van der Merwe, 2008). Originally developed in the military, Royal Dutch Shell used the method beginning in 1967 to plan for the year 2000. It enabled the company to weather the storms of the 1973 Yom Kippur war and plummeting oil prices. Using this method, managers and employees meet in multiple workshops to identify key driving forces within the business environment. A listing of issues is developed, and each issue is rated in terms of its impact and level of uncer- tainty. Those issues that are rated high in both impact and uncertainty are used as the basis for developing scenarios. The scenario development process includes (a) identi- fying a strategic agenda, (b) challenging existing assumptions, (c) examining the external environment, (d) pulling together the available information into three or four possible futures, (e) developing stories about those futures, and (f) using the stories to adjust and refine strategic thinking (Chermack, Lynham, & van der Merwe, 2006). Data from a PMS can prove invaluable in this process, which will help the organiza- tion develop flexible strategic plans and lead to organization, group, and individual learning.

Another option would be the use of systems dynamic modeling and simulation, as discussed by Yawson (2012). Systems dynamic modeling attempts to represent the feedback processes, including a PMS, in a system. Indeed, the dynamics of a system arise from either positive feedback loops, which are self-reinforcing and accelerate change, or negative feedback loops, which are self-correcting and inhibit change. The process begins by determining the initial conditions and any limitations, based on his- tory, market research, and expert judgment. Feedback loops and their directions are then determined, along with any interconnections and time lags. For complex systems, Sterman (2001) recommended the use of computer simulations. Although not seen as a tool to predict the future, the use of systems dynamics and simulations can yield organizational, group, and individual learning.

To attend to complexity and dynamism, as with other PM considerations, regular monitoring and modification of PMSs are necessitated by changes within an organiza- tion’s priorities or initiatives. Thus, our proposed model includes the iterative review of the framework and PIs at regular intervals. This process, while essential for all PMSs, takes on particular significance with an increase in complexity of the initiative, organization, or social setting. The schedule for which reviews should occur takes into account, to whatever degree possible, the pace and processes of the sources of change. Ad hoc reviews of the PMS, outside of the planned schedule, may occasionally be beneficial and include rapid need analysis (Barksdale & Lund, 2001) as well. This reevaluation and adaptation requires new performance measures to be introduced on an ongoing basis (Hailey & Sorgenfrei, 2005; R. Watkins, 2007).

Limitations of PMSs and the Role of HRD Practice

A PMS’s indicators provide certain knowledge about an organization’s initiative but do not yield all needed information. Indicators provide a single snapshot of a specific situation at a given point in time. Therefore, cause and effect relationships can be

172 Human Resource Development Review 15(2)

difficult to establish, as rigorous experimental or quasi-experimental designs are rarely tolerated and therefore unlikely to have been conducted (Russ-Eft & Hoover, 2005). Detecting both the impacts of relationships among indicators and the outcomes of indicators could potentially require several years of monitoring. The HRD practitio- ner, in working with an organization’s PMS, must continue to remind decision makers to consider the long-term perspective. As an example, poor outcomes do not necessar- ily represent poor effort (Artley & Stroh, 2001). Failure to meet objectives can occur for a variety of reasons. For instance, organizational or individual change efforts may fail because of a lack of managerial or supervisory coaching and mentoring, mis- aligned reward systems, individual motivation, and/or individual readiness for change, among other factors (e.g., Choi & Ruona, 2011; Holton, Bates, & Ruona, 2000; Rouiller & Goldstein, 1993). All of these issues reside within the HRD practitioner’s purview. Thus, the HRD practitioner must assist the organization to identify root causes of failure.

In addition, numerical quotas do not repair defective processes (Artley & Stroh, 2001). Turning performance objectives into numerical quotas creates problems. Such quotas can do nothing to achieve improvements in processes. Rummler and Brache (1990); Bergmann, Hurson, and Russ-Eft (1999); and Sleezer et al. (2014) recom- mended that organizational process be mapped to determine the flow of the work. Naming causes and changing procedures are ultimately the actions that improve out- comes. The HRD practitioner can aid the organization by developing the appropriate groups to work on organizational process maps that identify the handoffs and the potential duplications in the work flow.

Furthermore, it is important to acknowledge that “a measured system is not the same as the actual system” (Artley & Stroh, 2001, p. 6). Measured systems represent an approximation of the actual system (Franceschini et al., 2007). Measurements are only representational facsimiles for the functioning of the genuine system. Consequently, completely accurate information and data may not be possible to generate.

Ultimately, all PM frameworks have advantages and limitations inherent within their specific models. The extensive research on framework models over the last three decades has pointed out many of both. The HRD practitioner can provide insights which will help guide the organization in selecting the most appropriate measurements and help decision makers to recognize what can and cannot be measured.

Implications for Future HRD Research

There continues to exist an ongoing concern about the lack of strong evidence on the specific benefits and limitations of PM and a belief that research to date has proved inconclusive (Micheli & Manzoni, 2010). This deficit opens the door for ongoing multidisciplinary studies in the realm of PM. It is our hope that the model we have proposed be used to organize and guide many of these research concerns and ques- tions. This includes, for example, questions about the tailoring of PMSs to reflect organizational characteristics, the process of formulating goals and objectives for a

Star et al. 173

proposed PMS, the ways that a PMS may influence communication and decision mak- ing within the organization, and numerous other issues.

Undertaking studies of organizations adopting and implementing this model would help to identify the steps that are most useful and most needed. Furthermore, as sug- gested by some of the cited studies, the culture of the organization and the level of management control may need to evolve throughout the PMSs development and implementation process. It would be enlightening to undertake studies that examine such implementation and the level of management control at various stages.

As we have described, another prominent issue in the literature is the tension between the use of PMSs and PIs for accountability versus for organizational learning. Further research on the dynamics of this conflict, and the corresponding impacts and implications for organizations, would be valuable. Does a focus on accountability reduce attention to organizational learning, and conversely, does a focus on organiza- tional learning lead to neglect of accountability concerns? And what are the organiza- tional, departmental, and individual consequences of the two different foci?

HRD researchers should be examining management’s role in determining the focus of PMs and PIs. Who are the primary decision makers, and what degree of involve- ment is needed from each of those decision makers for a successful implementation? To what extent do HRD practitioners influence the decisions, particularly concerning the focus on accountability or on organizational learning in such systems? When deciding to implement PMs and PIs, what type of information and consulting is needed by executives and managers? And, when implementing such systems, what HRD interventions are needed for management and individuals within organizations? To what extent do the HRD interventions need to change over time with the development of the PMS?

Few organizations have the time or desire to formally investigate, for example, through experimental comparisons, the advantages of different approaches to the development of their PMSs. Instead, case studies, reflecting naturalistic variation in the procedures and processes used, will probably be the dominant approach for further investigation. Such case studies can also employ survey research and other observa- tional tools, to enable participants to assess the value and utility of various elements used in the design, implementation, and information utilization process. For assessing outcome measures, one might ask about the utility of the data and how they were used to inform change. Perceived involvement in the PMS development process, the extent to which the system is integrated into the organization’s structure and practices, and the amount of senior management support and participation can be assessed and linked to outcomes. Different measures of each of the steps in the proposed model are ame- nable to such approaches.

Finally, most of the literature cited in this review comes from the perspective of researchers and organizations in North America and Europe. Presumably, organiza- tions in Africa, Asia, the Middle East, and South America face similar issues and questions. Future research can examine the similarities and differences in the devel- opment and implementation of PMS and PIs in diverse geographical and cultural contexts.

174 Human Resource Development Review 15(2)

Conclusion

A PMS can be a powerful tool for identifying progress toward the success of organiza- tional goals and initiatives. In turn, such progress, or lack thereof, can assist in the identification of staff strengths and weaknesses and the understanding of organiza- tional resources. These organizational characteristics can highlight areas in which HRD interventions, focused on individuals and teams, can serve a vital support func- tion for goal attainment.

Organizations implement different approaches to PM and PIs for a variety of rea- sons, and as a result they experience different outcomes and impacts. Although a good deal of critical examination—as well as rhetoric—exists on these topics, the field needs more empirical research to clarify the issues involved. The model pre- sented in this article can provide a blueprint for organizations interested in imple- menting a PM approach. The efforts involved in planning, designing, and implementing PMSs can be amply rewarded by gains in organizational effectiveness, efficiency, and learning.

Acknowledgments

The authors gratefully acknowledge the Robert Wood Johnson Foundation for their support of this work. They especially thank Laura Leviton for her invaluable consultation and support.

Authors’ Note

The contents of this article are the responsibility of the authors and not of the Robert Wood Johnson Foundation.

Declaration of Conflicting Interests

The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article.

Funding

The author(s) received no financial support for the research, authorship, and/or publication of this article.

References

Alagaraja, M. (2012). HRD and HRM perspectives on organizational performance: A review of literature. Human Resource Development Review, 12, 117-143. doi:10.1177/1534484312450868

Alagaraja, M., & Shuck, B. (2015). Exploring organizational alignment-employee engagement linkages and impact on individual performance: A conceptual model. Human Resource Development Review, 14, 17-37. doi:10.1177/1534484314549455

Allio, M. (2012). Strategic dashboards: Designing and deploying them to improve implementa- tion. Strategy & Leadership, 40, 24-31. doi:10.1108/10878571211257159

Star et al. 175

Areana, M., Arnaboldi, M., Azzone, G., & Carlucci, P. (2009). Developing a performance measurement system for University Central Administrative Services. Higher Education Quarterly, 63, 237-263. doi:10.1111/j.1468-2273.2008.00415.x

Argyris, C. (1977). Organizational learning and management information systems. Accounting Organizations and Society, 24, 189-204.

Argyris, C., & Schön, D. A. (1974). Theory in practice: Increasing professional effectiveness. Oxford, UK: Jossey-Bass.

Argyris, C., & Schön, D. A. (1978). Organizational learning: A theory of action approach. Reading, MA: Addison-Wesley.

Artley, W., & Stroh, S. (2001). Performance-based management handbook: Volume 2 estab- lishing an integrated performance measurement system. Retrieved from http://www.orau. gov/pbm/pbmhandbook/pbmhandbook.html

Audit Commission. (2000). On target: The practice of performance indicators. London, England: Author.

Bánáthy, B. H. (1996). Designing social systems in a changing world. New York, NY: Kluwer Academic.

Bánáthy, B. H. (2000). Guided evolution of society: A systems view. New York, NY: Kluwer Academic.

Barksdale, S., & Lund, T. (2001). Rapid needs analysis. Alexandria, VA: ASTD Press. Barnum, C. (2010). Usability testing essentials: Ready, set . . . test! Burlington, MA: Elsevier. Barr, S. (2014). Dealing with the KPI terminology problem. Retrieved from http://staceybarr.

com/measure-up/dealing-with-the-kpi-terminology-problem/ Bergmann, H., Hurson, K., & Russ-Eft, D. (1999). Everyone a leader: A grassroots model for

the new workplace. New York, NY: Wiley. Bhagwat, R., & Sharma, M. K. (2007). Performance measurement of supply chain manage-

ment: A balanced scorecard approach. Computers & Industrial Engineering, 53, 43-62. doi:10.1016/j.cie.2007.04.001

Bititci, U. S., Carrie, A. S., & McDevitt, L. (1997). Integrated performance measurement systems: A development guide. International Journal of Operations & Production Management, 17, 522-534. doi:10.1108/01443579710167230

Bititci, U. S., Mendibil, K., Nudurupati, S., Garengo, P., & Turner, T. (2006). Dynamics of performance measurement and organizational culture. International Journal of Operations & Production Management, 26, 1325-1350. doi:10.1108/01443570610710579

Bititci, U. S., Turner, T., & Begemann, C. (2000). Dynamics of performance measurement systems. International Journal of Operations & Production Management, 20, 692-704. doi:10.1108/01443570010321676

Boland, T., & Fowler, A. (2000). A systems perspective of performance management in public sector organizations. International Journal of Public Sector Management, 13, 417-446. doi:10.1108/09513550010350832

Botcheva, L., Roller White, C., & Huffman, L. C. (2002). Learning culture and outcomes mea- surement practices in community agencies. American Journal of Evaluation, 23, 421-435. doi:10.1177/109821400202300404

Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K. (2000). Designing, implementing and updating performance measurement systems. International Journal of Operations & Production Management, 20, 754-771. doi:10.1108/01443570010330739

Bours, D. (2014). What’s in a name? On indicators, measures and metrics. Retrieved from https://www.climate-eval.org/blog/whats-name-indicators-measures-and-metrics

176 Human Resource Development Review 15(2)

Bremser, W. G., & Wagner, W. P. (2013). Developing dashboards for performance manage- ment. The CPA Journal, 83, 62-67.

British Columbia, Office of the Auditor General. (2010). Guide to developing relevant key per- formance indicators for public sector reporting. Retrieved from http://www.bcauditor.com/ sites/default/files/publications/2010/report_10/report/OAGBC_KPI_2010_updated.pdf

Cavalluzzo, K., & Ittner, C. D. (2004). Implementing performance measurement innova- tions: Evidence from government. Accounting, Organizations, and Society, 29, 243-268. doi:10.1016/S0361-3682

Chen, S. (2010). The establishment and comparison of the balanced scorecard for profit and non-profit organizations. African Journal of Business Management, 4, 3005-3012.

Chermack, T. J., & Lynham, S. A. (2002). Definitions and outcome variables of scenario plan- ning. Human Resource Development Review, 1, 366-383. doi:10.1177/1534484302013006

Chermack, T. J., Lynham, S. A., & van der Merwe, L. (2006). Exploring the relationship between scenario planning and perceptions of learning organization characteristics. Futures, 38, 767-777. doi:10.1016/j.futures.2005.12.010

Choi, M., & Ruona, W. E. A. (2011). Individual readiness for organizational change and its implications for human resource and organization development. Human Resource Development Review, 10, 46-73. doi:10.1177/1534484310384957

Chow-Chua, C., & Goh, M. (2002). Framework for evaluating performance and quality improve- ment in hospitals. Managing Service Quality, 12, 54-66. doi:10.1108/09604520210415399

Covaleski, M. A., Dirsmith, M. W., & Samuel, S. (1996). Managerial accounting research: The contributions of organizational and sociological theories. Journal of Management Accounting Research, 8, 1-36. Retrieved from https://www.homeworkmarket.com/sites/ default/files/q1/04/12/managerial_accounting_research-_the_contributions_of_organiza- tional_and_social_theories.pdf

Cross, K. F., & Lynch, R. L. (1988). The SMART way to define and sustain success. National Productivity Review, 9, 23-33. doi:10.1002/npr.4040080105

Dewey, J. D., & Carter, T. J. (2003). Exploring the future of HRD: The first Future Search conference for a profession. Advances in Developing Human Resources, 5, 245-256. doi:10.1177/1523422303254627

Dumas, J. S., & Redish, J. (1999). A practical guide to usability testing. Portland, OR: Intellect Books.

Edgar, F., Geare, A., Halhjem, M., Reese, K., & Thoresen, C. (2015). Well-being and per- formance: Measurement issues for HRM research. The International Journal of Human Resource Management, 26, 1983-1994. doi:10.1080/09585192.2015.1041760

Eker, M., & Eker, S. (2009). An empirical analysis of the association between the organiza- tional culture and performance measurement systems in the Turkish manufacturing sec- tor. Journal of Economic and Social Research, 11, 42-76. Retrieved from http://fatih.edu. tr/~jesr/jesr.%20melek-semih%20eker.pdf

Elg, M. (2007). The process of constructing performance measurement. The TQM Magazine, 19, 217-228. doi:10.1108/09544780710745649

Engineering and Physical Sciences Research Council. (1998). Integrated performance mea- surement systems: Structures and relationships. Final Research Report, Grant No. GR/K 48174, Swindon, UK.

European Foundation for Quality Management. (1999). Assessing for excellence: A practical guide for self-assessment. Brussels, Belgium: EFQM Brussels Representative Office.

Few, S. (2006a). Common pitfalls in dashboard design. Retrieved from http://www.perceptu- aledge.com/articles/Whitepapers/Common_Pitfalls.pdf

Star et al. 177

Few, S. (2006b). Information dashboard design: The effective visual communication of data. Sebastopol, CA: O’Reilly Media.

Fisher, F. R., & Sleezer, C. M. (2003, October). An overview of a multilevel theory of organiza- tional performance. Proceedings from the Institute of Behavioral and Applied Management Conference, Tampa, FL.

Fitzgerald, L., Johnston, R., Brignall, T. J., Silvestro, R., & Voss, C. (1991). Performance mea- surement in service industries. London, England: CIMA.

Franceschini, F., Galetto, M., & Maisano, D. (2007). Management by measurement: Designing key indicators and performance measurements. Berlin, Germany: Springer.

Given, R. K. (2005). Seeing stars: Human resources performance indicators in the National Health Service. Personnel Review, 34, 634-647. doi:10.1108/00483480510623439

Gooijer, J. D. (2000). Designing a knowledge management performance framework. Journal of Knowledge Management, 4, 303-310.

Government of Canada. (2015). “SMART” objectives and performance indicators. Retrieved from http://www.tbs-sct.gc.ca/psm-fpfm/learning-apprentissage/ptm-grt/pmc-dgr/smart- eng.asp

Guerra, L., & Hutchinson, A. (2013). Measurable and continuous performance improvement: The development of a performance measurement, management, and improvement system. Performance Improvement Quarterly, 26, 159-173. doi:10.1002/piq.21151

Hailey, J., & Sorgenfrei, M. (2005). Measuring success issues in performance measurement. Retrieved from http://hakielimu.org/files/publications/document53measuring_success_ performance_mgmt_en.pdf

Harbour, J. L. (2011). The three “Ds” of successful performance measurement: Design, data, and display. Performance Improvement, 50, 5-12. doi:10.1002/pfi.20195

Healthcare Effectiveness Data and Information Set. (n.d.). Retrieved from http://www.ncqa.org/ tabid/59/Default.aspx

Henri, J. F. (2005). Management control systems and strategy: A resource-based perspective. Accounting, Organizations and Society, 31, 529-558. doi:10.1016/j.aos.2005.07.001

Holton, E. F., III, Bates, R. A., & Ruona, W. E. A. (2000). Development of a generalized learn- ing transfer system. Human Resource Development Quarterly, 11, 333-360.

Kaplan, R. S., & Norton, D. P. (1992). The balanced scorecard: Measures that drive perfor- mance. Harvard Business Review, 70, 71-79.

Kaplan, R. S., & Norton, D. P. (1996a). Translating strategy into action: The balanced score- card. Boston, MA: Harvard Business School Press.

Kaplan, R. S., & Norton, D. P. (1996b). Using the balanced scorecard as a strategic management system. Harvard Business Review, 74, 75-85.

Kaplan, R. S., & Norton, D. P. (2001). The strategy-focused organization: How balanced score- card companies thrive in the new business environment. Boston, MA: Harvard Business School Press.

Keegan, D. P., Eiler, R. G., & Jones, C. R. (1989). Are your performance measures obsolete? Management Accounting, 12, 45-50.

Kennerley, M., & Neely, A. (2004). Business performance measurement: Theory and practice. Cambridge, UK: Cambridge University Press.

Kleiner, A. (1997). When measurement kills learning. Journal for Quality and Participation, 20, 5-11.

Kuchinke, P. K. (2003). Contingent HRD: Toward a theory of variation and differentiation in formal human resource development. Human Resource Development Review, 2, 294-309. doi:10.1177/1534484303256885

178 Human Resource Development Review 15(2)

Lines, R. (2005). The structure and function of attitudes toward organizational change. Human Resource Development Review, 4, 8-32. doi:10.1177/1534484304273818

Mackie, B. (2008). Organizational performance management in government context: A litera- ture review. Retrieved from http://www.scotland.gov.uk/Publications/2008/08/25142353/1

Malina, M. A., & Selto, F. H. (2001). Communicating and controlling strategy: An empirical study of the effectiveness of the balanced scorecard. Journal of Management Accounting Research, 13, 47-90. doi:10.2308/jmar.2001.13.1.47

Management: Reinventing the Company. (2015, October 24). The Economist: Business Insights: Global. Retrieved from http://www.economist.com/news/leaders/21676767-entrepreneurs- are-redesigning-basic-building-block-capitalism-reinventing-company

Manoochehr, N., Etebari, M., & Emami, S. (2012). A framework to review performance prism. International Journal of Operations, 32, 1124-1146. doi:10.1108/01443571211274486

Marsick, V. J., & Watkins, K. E. (1999). Facilitating learning organizations: Making learning count. Aldershot, UK: Gower.

Marsick, V. J., & Watkins, K. E. (2003). Demonstrating the value of an organization’s learn- ing culture: The Dimensions of the Learning Organization Questionnaire. Advances in Developing Human Resources, 5, 132-151. doi:10.1177/1523422303005002002

Micheli, P., & Manzoni, J. (2010). Strategic performance measurement: Benefits, limitations, and paradoxes. Long Range Planning, 43, 465-476. doi:10.1016/j.lrp.2009.12.004

Najmi, M., Etebari, M., & Emami, S. (2012). A framework to review performance prism. Retrieved from http://ir.library.oregonstate.edu/xmlui/bitstream/handle/1957/37138/ EmamiSaminMIMEFrameworkReviewPerformance.pdf?sequence=1

National Council on Quality Assurance. (n.d.). Retrieved from http://www.ncqa.org/ HEDISQualityMeasurement.aspx

National Quality Forum. (2015). Retrieved from http://www.qualityforum.org/story/About_Us.aspx National Research Council. (2005). Key performance indicators for federal facilities portfo-

lios: Federal facilities council technical report (Committee on Performance Indicators for Federal Real Property Asset Management Publication No. 147). Washington, DC: National Academies Press.

Neely, A. (1999). The performance measurement revolution: Why now and what next? International Journal of Operations & Production Management, 19, 205-228.

Neely, A., Adams, C., & Crowe, P. (2001). The performance prism in practice. Measuring Business Excellence, 5, 6-13. doi:10.1108/01443579910247437

Neely, A., Adams, C., & Kennerley, M. (2002). The performance prism: The scorecard for measuring and managing business success. London, England: Financial Times.

Neely, A., Mills, J., Gregory, M., Richards, H., Platts, K., & Bourne, M. (1996). Getting the measure of your business. Cambridge, UK: Manufacturing Engineering Group, University of Cambridge.

Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M., & Kenneerley, M. (2000). Performance measurement system design: Developing and testing a process-based approach. International Journal of Operations & Production Management, 20, 1119-1145. doi:10.1108/01443570010343708

Nudurupati, S. S., Bititci, V., Kumar, F. T., & Chan, S. (2010). State of the art literature review on performance measurement. Computers & Industrial Engineering, 60, 279-290. doi:10.1016/j.cie.2010.11.010

Ogata, K., & Goodkey, R. (2002). Redefining government performance. In A. Neely (Ed.), Business performance measurement (pp. 259-278). Cambridge, UK: Cambridge University Press.

Star et al. 179

O’Neil, J., Watkins, K., & Marsick, V. (2010). Action learning and the learning organization. In L. Dilworth, Y. Boryshuk & A. Mumford (Eds.), Action learning and its applications (pp. 154-165). New York, NY: Palgrave Macmillan.

Osborne, D., & Gaebler, T. (1992). Reinventing government. New York, NY: Plume Books. Ossege, C. (2012). Accountability—Are we better off without it? An empirical study on the

effects of accountability on public managers’ work behaviour. Public Management Review, 14, 585-607. doi:10.1080/14719037.2011.642567

Parmenter, D. (2010). Key performance indicators: Developing, implementing, and using win- ning KPIs. Hoboken, NJ: Wiley.

Parmenter, D. (2012). Key performance indicators for government and nonprofit agencies: Implementing winning KPIs. Hoboken, NJ: Wiley.

Parmenter, D. (2015). Key performance indicators: Developing, implementing, and using win- ning KPIs (3rd ed.). Hoboken, NJ: Wiley.

Patton, M. Q. (2011). Developmental evaluation: Applying complexity concepts to enhance innovation and use. New York, NY: Guilford Press.

Pun, K. F., & White, A. S. (2005). A performance measurement paradigm for integrating strategy formulation: A review of systems and frameworks. International Journal of Management Reviews, 7, 49-71. doi:10.1111/j.1468-2370.2005.00106.x

Rouiller, J. Z., & Goldstein, I. L. (1993). The relationship between organizational transfer climate and positive transfer of training. Human Resource Development Quarterly, 4, 377-390. doi:10.1002/hrdq.3920040408

Rozner, S. (2013). Developing and using key performance indicators: A toolkit for health sector managers (Health Finance & Governance Project). Bethesda, MD: Abt Associates.

Rubin, J., & Chisnell, D. (2008). Handbook of usability testing: How to plan, design, and con- duct effective tests (2nd ed.). Indianapolis, IN: Wiley.

Rummler, G., & Brache, A. (1990). Improving performance: How to manage the white space on the organizational chart. San Francisco, CA: Jossey-Bass.

Russ-Eft, D. (2002). A typology of training design and work environment factors affect- ing workplace learning and transfer. Human Resource Development Review, 1, 45-65. doi:10.1177/1534484302011003

Russ-Eft, D., & Hoover, A. (2005). The joys and challenges of experimental and quasi-experimental designs. In R. A. Swanson & E. F. Holton III (Eds.), Research in organizations: Foundational principles, processes, and methods of inquiry (pp. 75-95). San Francisco, CA: Berrett-Koehler.

Russ-Eft, D., & Preskill, H. (2009). Evaluation in organizations: A systematic approach to enhancing learning, performance, and change (2nd ed.). New York, NY: Basic Books.

Schiff, C. (2008). Three things you should know about dashboards. DM Review, 18, 29. Sleezer, C. M., Russ-Eft, D. F., & Gupta, K. (2014). A practical guide to needs assessment (3rd

ed.). San Francisco, CA: Wiley. smartKPIs.com. (2010). KPIs, KRIs, PIs, metrics and measures. Retrieved from http://www.

smartkpis.com/pages/context/info-i8.html Smith, P. (1995). On the unintended consequences of publishing performance data in

the public sector. International Journal of Public Administration, 18, 277-310. doi:10.1080/01900699508525011

Srimai, S., Damsaman, N., & Bangchokdee, S. (2011). Performance measurement, orga- nizational learning and strategic alignment: An exploratory study in Thai public sector. Measuring Business Excellence, 15, 57-69. doi:10.1108/13683041111131628

Sterman, J. D. (2001). System dynamics modeling: Tools for learning in a complex world. California Management Review, 43, 8-25. doi:10.2307/41166098

180 Human Resource Development Review 15(2)

Stolz, I., & McLean, G. N. (2009). Organizational skills for a corporate citizen: Policy analysis. Human Resource Development Review, 8, 173-196. doi:10.1177/1534484309334099

Swanson, R. A. (1995). Human resource development: Performance is the key. Human Resource Development Quarterly, 6, 207-213. doi:10.1002/hrdq.3920060208

Szabla, D. B. (2007). A multidimensional view of resistance to organizational change: Exploring cognitive, emotional, and intentional responses to planned change across perceived change leadership strategies. Human Resource Development Quarterly, 18, 525-558. doi:10.1002/ drdq.1218

Technology Affinity Group. (2013). Data at a foundation’s fingertips: Creating and build- ing dashboards. Retrieved from http://www.tagtech.org/?page=publicreports&;hhSearch Terms=%22creating+and+dashboards%22#

Torraco, R. J. (2011). Writing integrative literature reviews: Guidelines and examples. Human Resource Development Review, 4, 356-367. doi:10.1177/1534484305278283

Torres, R. T., Preskill, H., & Piontek, M. (2005). Evaluation strategies for communicating and reporting: Enhancing learning in organizations (2nd ed.). Thousand Oaks, CA: SAGE.

Upton, M. G., & Egan, T. (2010). Three approaches to multilevel theory building. Human Resource Development Review, 9, 333-356. doi:10.1177/1534484310380333

van der Merwe, L. (2008). Scenario-based strategy in practice: A framework. Advances in Developing Human Resources, 10, 216-239. doi:10.1177/1523422307313321

Watkins, J., & Drury, L. (1999). New organizational structures: Skill implica- tions for professionals. Human Resource Development International, 2, 181-203. doi:10.1080/13678869900000022

Watkins, K. E., & Marsick, V. (1992). Building the learning organization: A new role for human resource developers. Studies in Continuing Education, 14, 115-129. doi:10.1080/0158037920140203

Watkins, R. (2007). Performance by design: The systematic selection, design, and development of performance technologies that produce results. Amherst, MA: HRD Press.

Webster, J., & Watson, R. T. (2002). Analyzing the past to prepare for the future: Writing a literature review. MIS Quarterly, 26, 13-23.

Weisbord, M. R., & Janoff, S. (1999). Future Search: An action guide to finding common ground in organizations and communities. San Francisco, CA: Berrett-Koehler.

Yawson, R. M. (2012). Systems theory and thinking as a foundational theory in human resource development: A myth or reality? Human Resource Development Review, 12, 53-85. doi:10.1177/1534484312461634

Yorks, L., & Nicolaides, A. (2006). Complexity and emergent communicative learning: An opportunity for HRD scholarship. Human Resource Development Review, 5, 143-147. doi:10.1177/1534484306287559

Author Biographies

Sequoia Star, MEd, is a research associate with Oregon State University and an independent consultant in the field of adult education and leadership. Her focus is on qualitative research, developmental evaluation, program development, and curriculum development. She is the recipient of numerous awards and scholarships, including the Oregon Governor’s Award for Crime Victims’ Services.

Darlene Russ-Eft, PhD, is professor and Discipline Liaison of Adult Education and Higher Education Leadership in the College of Education at Oregon State University. Her research, books, and articles focus on program evaluation, workplace learning and development, and

Star et al. 181

competency research. She was president of the Academy of Human Resource Development; a former director of the International Board of Standards for Training, Performance, and Instruction; a former board member of the American Evaluation Association; and an editor of the Human Resource Development Quarterly.

Marc T. Braverman, PhD, is a professor and extension specialist in the School of Social and Behavioral Health Sciences at Oregon State University (OSU). His research interests include program evaluation design and analysis, the design and delivery of community interventions, health promotion theory, adolescent health, smoking prevention, and tobacco policy. He is a former associate dean for Extension and Outreach in OSU’s College of Public Health and Human Sciences.

Roger Levine, PhD, is an independent consultant in Redwood City, California. He was a man- aging research scientist at a large, not-for-profit research organization, where he created a Cognitive Survey Laboratory and ran a Usability Laboratory. He has conducted research and published in the areas of program evaluation; education research; survey research; diversity in Science, Technology, Engineering, and Math (STEM) fields; emergency medical services; chronic disease; and patient experience of care measurement.