Control 1(XmR Chart)

Objective:
An I-MR chart was plotted for the Doctor’s office to ensure the specifications were performing as planned and the patients and Doctors were satisfied.
Instructions for you:
1. Please indicate if the data is Normally distributed
2. Please indicate if the control chart is stable and if any Shewhart Rules have occurred.
3. Based on these results, describe what you would do next.
Data:
Target Assignment Date - Submit by the end of Week 8 or earlier
Project: SSG120
Deliverable: XmR Chart
Student last name: Your last name here
Based on the Normal test (above), is the process Normally Distributed?
Please indicate if the control chart is stable and if any Shewhart Rules have occurred
Based upon your analysis of the stability of this control chart, what would you do next?

Control 2 (Pp Ppk)

Objective:
A capability study was completed. Please advise if the process is stable and any analysis you find is relevant.
Instructions for you:
1. Based on the following Capability Analysis results, state whether or not the proces is acceptable and justify your conclusion
Analysis:
TARGET ASSIGNMENT DATE - Submit in Week 8 or earlier
Project: SSG120
Deliverable: Pp Ppk
Student last name: Your last name here
Is the process acceptable? What is the basis for your decision?
How to submit an Assignment
To send each assignment to your instructor:
Click-and-hold the LEFT mouse button at the TOP-LEFT corner of the
peach-colored box, then while holding down on that button, drag to
the LOWER-RIGHT corner of the box. This will highlight the entire
peach-colored box. Release the mouse button. Copy the content (Edit>Copy, or CTRL-C on PC)
(Edit>Copy or CMD-C on Mac)
Go to your Villanova website and follow this sequence:
1. COURSE MENU
2. CLASS ROSTER
3. Click on your instructor's email envelope icon
4. Type "Check My Work - Pp, Ppk - HEALTHCARE" in the SUBJECT box.
5. Click once inside of the message box
6. Paste the content (Edit>Paste or CTRL-V on PC or CMD-V on Mac) into the email
Don't be concerned if after you paste it, the appearance of the text is out of
alignment. It will straighten out after you hit SEND.
7. SEND Check your SENT ITEMS folder afterward to see how it straightened out.
8. DO NOT SEND ANY ATTACHMENTS UNLESS YOUR INSTRUCTOR SPECIFICALLY ASKS YOU TO!!
Please 'hand-in' your assignments throughout the course.
DO NOT SAVE THEM FOR THE END.
The deadline for having all project deliverables 100% correct
is 7 days prior to the end of the course.

Control 3 (Control Plan)

Objective:
Please complete a Control and Monitoring Plan for the project.
Instructions for you:
1. Using the following template, create a Control Plan for the "Vital Few" Operating Metrics which can serve as the basis for a Dashboard (HINT: Your Data Collection Plan is a Good Place to Start)
CONTROL PLAN TEMPLATE (For the "Vital Few")
SOP # PROCESS STEP WHAT'S CONTROLLED INPUT OR OUTPUT SPECIFICATION CHARACTERISTIC SPECIFICATIONS METHOD OF MEASUREMENT METHOD OF CONTROL SAMPLE SIZE FREQUENCY WHO / WHAT MEASURES RECORDING LOCATION DECISION / CORRECTIVE ACTION
LEARN MORE ABOUT SMARTSHEET FOR PROJECT MANAGEMENT
https://goo.gl/6pfVZY

image1.emf

image2.png

image3.emf

image4.emf

image5.png