Proposal Writing
SGS 901: ICT & RESEARCH METHODS
MODULE: Proposal Writing
by
Prof. Ibisime Etela, (PhD, RAS) ([email protected]; [email protected]; 07034378380)
Dean, Faculty of Agriculture
&
Member, Africa Centre of Excellence in Oilfield Chemicals Research (CEFOR)
University of Port Harcourt, Nigeria
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
2
IARD & CEFOR, UniPort
Pre-Lecture Questionnaire 1. Have you taken a formal course on proposal writing before? (Yes / No)
2. If your response to Question 1 is Yes, 2(a) When was the course? ……………………………… (dd/mm/yyyy) 2(b) Who was (were) the organizer(s)? ………………………………….. ………………………………………………………………………………….
3. What is your area of strength in proposal writing? …………………….. ……………………………………………………………………………………
4. What is your area of weakness in proposal writing? ……………………. …………………………………………………………………………………….
5. Have you secured grant/fellowship/scholarship before? (Yes / No)
6. If yes, please, provide year, name of award and funding body/agency ……………………………………………………………………………………
7. What is your expectation(s) from this module on proposal writing? …………………………………………………………………………………… …………………………………………………………………………………… ……………………………………………………………………………………
3
IARD & CEFOR, UniPortFood for Thought
“You are either
Running with a VISION
or
Going on a MISSION
or
Burning with a PASSION
in life.
But, if you do not belong to any of these then, life for you will or is reduced to a burden”
Dr. David Oyedepo
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
4
INTRODUCTION
❑ Learning is a tool for capacity building
❑ Experiential learning enhances capacity
❑ However, experiential learning takes a lot of time, energy and other resources (infrastructure; equipment, etc)
❑ Grantseeking is an annual business conglomerate worth multitrillion naira. What is your share?
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
5
PURPOSE OF PRESENTATION
✓ Create awareness for potential experts of proposal writing
✓ Make you interested and well-mobilized for seeking
grants ✓ Help you become active members of, at least, one
functional research team or the other ✓ Establish a reformed UniPort postgraduate
programme where grantsmanship is a practice, routine and even a culture or lifestyle
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
LECTURE STRUCTURE
○ The art of proposal writing (Part I)
○ Creating logframe and project budget (Part II)
○ Approach for project implementation (Part III)
IARD & CEFOR, UniPort
6
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
LEARNING OBJECTIVES
○ Capacity to outline a research or project proposal
○ Enable participants prepare preliminary proposals
○ Participants draft fundable proposals
IARD & CEFOR, UniPort
7
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
LECTURE PATTERN AND ASSESSMENT
○ Throughout Lecture: Participatory learning
○ End of Lecture: - Participants outline own research project proposal
- Participants develop own fundable proposals
- Draft fundable proposals, review and submit
IARD & CEFOR, UniPort
8
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
9
The art of proposal writing (Part I)
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
OUTLINE OF PRESENTATION (PART 1) IARD & CEFOR,
UniPort
10
❖ Channels of Scientific Communication
❖ Proposal as a Concept
❖ Frequently Asked Questions
❖ The Challenge
❖ Writing a Winning Proposal
❖ Project Proposal Format
❖ Some Pre-Proposal Steps to Follow
❖ Details on Each Proposal Section
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
CHANNELS OF SCIENTIFIC COMMUNICATION
The different underlisted channels serve different purposes: 1)Research Journals 2)Research Reviews
3)Short Communications
4)Conference Papers and Posters
5)Thesis / Dissertation
6)Books and Chapters in Books
7)Annual and Technical Reports
8)Working Papers
9)Newsletters
10)Websites
11)Blogs and Discussion groups
12)Project Proposals and Reports
IARD & CEFOR, UniPort
11
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
PROPOSAL AS A CONCEPT
○ It is an art mastered via practise
○ Set of mini-research papers yet, to be implemented
○ Effective communication essential for good proposal
○ Two types of proposals: - long proposals - shorter letter proposals
○ Some organizations require Pre-Proposals or Concept Notes as entry points for proposals
IARD & CEFOR, UniPort
12
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
FREQUENTLY ASKED QUESTIONS IARD & CEFOR,
UniPort
13
Do I have a chance to secure grant?
Yes, 50-100% Is it easy to
secure grants? Never!
What do funders seek?
Contact one, past reviewers/grantees
Is writing a fundable proposal
really worth it? Yes, but, time consuming
How much can I request? See
guidelines
Do I need personal contact to get funded?
Unnecessary but, might be helpful
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
THE CHALLENGE IARD & CEFOR,
UniPort
14
○ Good number of professionals find it difficult to put down ideas in simple, easy-to-follow pattern
○ Others even think that, writing a proposal is very difficult and time-consuming
○ Often times, many persons with bright ideas do not allow such ideas see the light of day
○ Doing it, systematically, following smaller step- by-step tasks makes it easier to put on paper
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
15
Do your homework and plan the proposal –
contact key persons to help plan proposal and maximize possibility of
success
Write a carefully written, well-
reasoned proposal – good ideas poorly written
may be rejected
You must identify potential donors or funders
- each donor or funder has specific guidelines
Writing a Winning
Proposal – teamwork and three things are needful
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
16
ADVANTAGE OF TEAM WORK
Poor team building
Good team building
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
PROJECT PROPOSAL FORMAT
Specific proposal formats differ from one organization to another but, the basic elements are similar:
1)Project Title/Topic
2)Project Leader / Principal Investigator with affiliation
3)Executive Summary
4)Abbreviations and Acronyms
5)Introduction
6)Problem Statement and Justification
7)Goal and Objectives
IARD & CEFOR, UniPort
17
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
PROJECT PROPOSAL FORMAT (CONT’D)
8) Expected Outputs
9) Methodology
10) Collaborators
11) Time Frame for project implementation
12) Project Time Line / Work Plan
13) Logical Framework
14) Project Budget
15) Annexes
EMPHASIS: Different donor agencies insist on different ways of arranging these basic elements of a typical proposal.
IARD & CEFOR, UniPort
18
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
SOME PRE-PROPOSAL STEPS TO FOLLOW (FINE-TUNE & INCREASE COMPETITIVE ADVANTAGE) IARD & CEFOR,
UniPort
19
STEP 1: Request for current application forms/guidelines
STEP 2: Call a past grantee (of same donor or funder)
STEP 3:
Call a past reviewer (to same donor or funder)
STEP 4:
Contact Program Officer of the call for proposal
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
1) PROJECT TITLE OR TOPIC
○ It is one of the most important parts of a proposal
○ Should be catchy and attract the interest of potential donors
○ It should be concise - maximum of 16 words but, 5 to 10 words is ideal
○ It should, accurately, reflect the contents of the proposal
○ It should carry selling words that would make it easy to pick up by future researchers
IARD & CEFOR, UniPort
20
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
EXERCISE 1: CONCEIVE PROJECT TITLE:
REVISE THE TITLE OF YOUR PROJECT PROPOSAL TO BE BETWEEN 5 & 10
WORDS
IARD & CEFOR, UniPort
21
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
22
○ Research Grant-Winning Proposal Writing Workshop for doctoral candidates
○ Rebranding Centre for Oilfield Chemicals Research for Increased Donor Funding
○ Building University of Port Harcourt Staff and Students Capacity for Writing Grant-Winning Proposals
EXAMPLES 1: SAMPLE PROJECT TITLES
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
23
EXAMPLES 1: SAMPLE PROJECT TITLES IARD & CEFOR,
UniPort
○ Observe the title above and comment, freely, on it
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
2) PROJECT LEADER OR PRINCIPAL INVESTIGATOR
○ Responsible for proper project implementation – usually, abridged curriculum vitae to be attached
○ Must be a ‘Champion’ or ‘Change Agent’ – an individual who: – believes in the new idea or concept – is motivated enough to convince others about the project – ensures project buy-in (acceptance of/support for it)
○ Able to secure commitment from heads of collaborating stakeholders and staff within his organization
○ Have good knowledge of his organization’s SWOT Analysis
IARD & CEFOR, UniPort
24
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
3) EXECUTIVE SUMMARY
○ Preferably, written last, and can stand alone
○ Is comprehensive / detailed yet, not too long, logical sequence of project proposal - 250 to 500 words in length
○ Proposal assessors use it to decide project funding suitability
○ It comprises short interconnected sentences indicating: – a brief project justification – an outline of project work plan – the expected project outputs – the significance of the project outputs
IARD & CEFOR, UniPort
25
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
4) ABBREVIATIONS AND ACRONYMS
○ Simply, shows abbreviations in proposal with their meanings
Other terminologies
○ Impact: expected project goal – plan influence on beneficiaries
○ Outcome: expected project result – has consequence on impact
○ Output: achievements realized from project implementation
○ Activities: specific actions taken during implementation
IARD & CEFOR, UniPort
26
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
5) INTRODUCTION
○ Are you competent, credible, possess professional and organizational qualifications?
○ What is the significance of your new idea or concept?
○ Endeavour to link your project with the funder’s priorities
○ Generally, your introductory section should: – clearly, establish who you are – describe the goals of your organization – demonstrate your track record in the project subject area – logically, connect to the problem statement
IARD & CEFOR, UniPort
27
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
6) PROBLEM STATEMENT AND JUSTIFICATION
○ Purpose of study – condition to be changed
○ Extensive literature search on current thinking in the area
○ Demonstrate that, the identified problem can be solved
○ Generally, this section should: – show the importance and significance of the problem – indicate how problem relates to your organizational goals
– elicit the interest of the reviewer to read further
– relate problem and outputs to human needs and societal benefits
○ Certain statements weaken your case, avoid them: – “very little is known about …”
– “there is a lack of information about …”
– “no research has been conducted on …”
IARD & CEFOR, UniPort
28
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
29
7a) GOAL
○ Goal is the ultimate, global or long term project outcome(s) ○ Goal seeks to answer the so what project questions? ○ Goals are achievable 2-5 years and should be SMART
Inappropriate!! Appropriate!!
To improve health To improve health practices of people engaged in international trade and development
To reduce trade conflict
To increase effective management of trade conflicts among spare parts dealers in Rivers State
To increase standards of living
To decrease costs of doing car business in the southern part of Nigeria
SMART: Specific; Measurable; Achievable; Realistic; Time-bound
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
30
7a) GOALS (cont’d): IARD & CEFOR,
UniPort
• Show the desired outcomes, accomplishments, results or purpose the project seeks to achieve - NOT THE ACTIVITY OR PROCESS.
• Indicate the expected broad changes in conditions (e.g. behaviour; attitude; economic; knowledge; capacity) and answer the “SO WHAT” after project completion question.
• Demonstrate how successful implementation of the project will contribute towards a larger development impact (e.g. any or combination of the UN Post-2015 SDGs).
• Usually, goals reflect a result achieved in an intermediate time period (2-5 years) - NOT IMMEDIATELY AFTER PROJECT COMPLETION, which is OUTPUT.
How to Write Quality Goals
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
EXERCISE 2: DEVELOP PROJECT GOAL
DEVELOP APPROPRIATE GOAL(S) FOR THE REVISED PROJECT TITLE
IARD & CEFOR, UniPort
31
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
32
○ Establish a reformed postgraduate programme where grantsmanship is a practice, routine and institutional culture
○ Towards a rebranded Centre for Oilfield Chemicals Research where grantsmanship is a lifestyle and a key performance indicator
○ Institutionalize grantsmanship in the University of Port Harcourt
IARD & CEFOR, UniPort
EXAMPLES 2: SAMPLE PROJECT GOALS
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
7b) OBJECTIVES
○ Objectives (immediate outcomes) are specific compared to goals (ultimate global outcomes)
○ Objectives state project outcomes (i.e. end products)
○ Objectives are used to indicate: – hypotheses and or research questions – the intended outcomes of the project – they are SMART and can be evaluated or tested later – the importance of the outcomes to the funder
○ Good objectives state WHAT and WHEN something will be done NOT WHY or HOW it will be done (methodology)?
SMART: Specific; Measurable; Achievable; Realistic; Time-bound
IARD & CEFOR, UniPort
33
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
7b) OBJECTIVES IARD & CEFOR,
UniPort
34
• A statement of the desired, Specific, Measurable, Appropriate (Achievable), Realistic and Time-based program results.
• A well written objective(s) gives you direction for moving closer to your goal.
• It is, directly, linked to the goal(s) and intended output(s) required to attain goal- products, results, information, processes, services, etc.
• Reflect on what you hope to produce by undertaking a specific activity
• Reflects a result to be achieved in a, relatively, short period of time (0-2 years)
How to Write Quality Objectives
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
7b) OBJECTIVES IARD & CEFOR,
UniPort
35
Attributes of SMART Objectives • Specify concrete events or actions to be taken
• Measure the quantities (amount; number; per cent; volume, etc) of resources, activities or changes to be used and the corresponding benefits (outputs; outcomes; impacts)
• Appropriate results that, logically, relates to the problem statement and desired effects are necessary
• Realistic results achievable with the available resources and implementation plan
• Time period when the objective(s) will be achieved will facilitate project M&E
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
7b) OBJECTIVES IARD & CEFOR,
UniPort
36
Simple Logic for Writing SMART Objectives
To __________ (action/direction of change) the ________ (what knowledge, attitude, practices will be changed) In _______ (targeted population or area of change) by _______ (the expected amount of change in number or percent) as measured by ______(how will you measure the change) by _______ (time frame)
Examples 1.To increase the number of grants secured in the Centre
for Oilfield Chemicals Research by 25% (as measured by school records) by December 30, 2018.
3.To organize four training workshops on proposal writing skills to 200 faculty and postgraduate students (as measured by workshop reports) by December 30, 2018.
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
EXERCISE 3: PROJECT OBJECTIVE(S):
DEVELOP APPROPRIATE OBJECTIVE(S) FOR THE PROJECT GOAL(S) WRITTEN
IARD & CEFOR, UniPort
37
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
38
○ To create awareness for potential experts of grant-winning proposal writing
○ To elicit interest in seeking research grants by University of Port Harcourt staff and students
○ To facilitate creation of, at least, one functional faculty-student research team at the Centre for Oilfield Chemicals Research
IARD & CEFOR, UniPort
EXAMPLES 3: PROJECT OBJECTIVES
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
8) EXPECTED OUTPUTS
○ Should be clearly defined – for example, say my study will improve oil recovery by 15% in horizontal oil wells and not to say it will increase the productivity of oil wells in the Gulf of Guinea
○ Clearly defined outputs make it possible to know when project objectives have been achieved
○ Generally, the expected outputs must be: – significant – finite – measurable – specific
IARD & CEFOR, UniPort
39
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
40
EXPECTED OUTPUTS (cont’d) (Indicators help point towards Project Objectives)
IARD & CEFOR, UniPort
What Is an Indicator? A variable measures one aspect of a programme, project or outcome
Usefulness of Indicators An appropriate set of indicators includes, at least, one indicator for each significant aspect of a programme or project
Types of Indicators 1) Output indicator
2) Impact indicator
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
41
EXPECTED OUTPUTS (cont’d) (Indicators that Objectives are being achieved)
Output Indicator:
Measures product(s) produced and are quantitative -
number of persons or participants trained;
number of tangible things (hardware/software) created;
number of journal/conference papers published, and
Project report or student thesis/dissertation, etc.
Impact Indicator:
Measures actual change and are qualitative -
positive change in attitude,
improved practice, policy, etc.
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
42
IARD & CEFOR, UniPort
EXPECTED OUTPUTS (cont’d) (Guiding Criteria for Determining Indicators)
Generally, indicators must be Specific, Achievable, Realistic, and have Direct Link to the Project, while answering the following four critical questions:
Does it indicate the quantity we intend to assess?
Does it help us to know the quality we are expecting?
Does it show the timeframe we hope to achieve it?
Does it identify the location where it will occur in?
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
43
IARD & CEFOR, UniPort
EXPECTED OUTPUTS (cont’d) (Common Indicator Matrices)
• Counts • Number of staff and students trained • Number of workshop training materials distributed
• Calculations: percentages, rates, ratios • % of trained staff and students who wrote proposals • ratio of staff and students in research teams • rate of increase in number of proposals submitted
• Index, composite measures • Quality index comprising the sum of scores on separate
outcome indicators
• Thresholds and Frequency • presence or absence, observed or not observed, yes or no • pre-determined level or standard • daily, weekly, monthly, quarterly, bi-annually, annually,
biennially
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
44
IARD & CEFOR, UniPort
Pre-defined Indicators could be sourced from:
• past years of a programme
• related or similar programmes
• lists of global or recommended indicators (https:// unstats.un.org/sdgs/indicators/Official%20Revised %20List%20of%20global%20SDG%20indicators.pdf)
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
45
IARD & CEFOR, UniPortUseful Information Sources for Setting
Indicator Targets:
• Past trends
• Client expectations
• Donor expectations
• Expert opinion
• Research findings
• What has been accomplished elsewhere
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
46
IARD & CEFOR, UniPort
Key Questions for Selecting and Using Indicators
• Do they meet programmatic needs?
• Will they give you useful information for decision making?
• Are they feasible considering time, money and staffing?
• Do they match external requirements?
• Are the data available?
• How accurate are the data?
• Are they standard indicators used across projects,
programs, countries?
• Are you collecting the information, appropriately?
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
47
IARD & CEFOR, UniPortEXPECTED OUTCOMES
○ Capacity to outline a research or project proposal
○ Interest in seeking potential donors and preparing preliminary proposals
○ Willingness to draft and submit fundable proposals
○ Formation or membership of a functional faculty- student research team
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
9) METHODOLOGY
○ Details activities (i.e. the HOW?) to achieve each objective
○ Presents a clear picture or scope of the study population
○ Shows the sequence, flow and interrelationship of activities
○ Indicates planned staffing and equipment requirements (what is available and the gap to be filled to accomplish objectives)
○ States associated risks and mitigation strategies for success
○ Summarize on a one-page time-and-task chart with milestones
IARD & CEFOR, UniPort
48
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
49
❑ After identifying the problem to solve and project objectives, the researcher needs to plan a sequence of activities to achieve the objectives
❑ The sequence of activities will depend on the type of experimental units
❑ The type of experimental units will lead to the particular experimental design
❑ Adopting the right experimental design results to a cost-effective and efficient way to achieve project deliverables
9) METHODOLOGY (cont’d) IC
T a
n d
R esea
rch M
eth od
s: P rop
osa l W
ritin g
IARD & CEFOR, UniPort
50
❑ To describe the step-by-step set of activities required to achieve set project objectives
❑ To present a clear picture of the experimental units (for empirical studies) and the study population (for social sciences)
❑ To give an indication of human, material and other resources needed to, successfully, implement the project
❑ To tell the reviewer the creative aspect of your proposed study and
❑ To sell the uniqueness of your approach to solving the identified problem
9) WHY SELECT A METHOD(S) IC
T a
n d
R esea
rch M
eth od
s: P rop
osa l W
ritin g
IARD & CEFOR, UniPort
51
❖ Assume you have the grant and have to start spending
❖ What is the first thing I will do or procure? – staffing (recruit; train), equipment, infrastructure, etc
❖ Who will do it?
❖ When will it be done?
❖ What will I do next?
❖ Keep asking the, “What should I do next?” to lead you through the whole procedures
❖ Identify the major milestones and group them into time- and-task chart – simple manageable steps to implement
9) HOW DO I WRITE A GOOD METHODOLOGY IC
T a
n d
R esea
rch M
eth od
s: P rop
osa l W
ritin g
EXERCISE 4: WRITING METHODOLOGY
DEVELOP APPROPRIATE RESEARCH METHODOLOGY FOR ACHIEVING THE
LISTED OBJECTIVES
IARD & CEFOR, UniPort
52
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
53
❑ Experimental designs help you to collect, process and analyze data from your experiment (mostly biological sciences) and studies (applicable also to social sciences)
❑ Experiments and or studies are, usually, conducted using relevant experimental designs
❑ There are two major types of experiments:
➢ Absolute: mean or variance (weight; height; length, etc)
➢ Comparative: compare between treatments; levels of treatments; social behaviours of different populations or gender; teaching methods, etc
9) WHY SELECT EXPERIMENTAL DESIGNS? IC
T a
n d
R esea
rch M
eth od
s: P rop
osa l W
ritin g
IARD & CEFOR, UniPort
54
9) WHAT ARE EXPERIMENTAL DESIGNS
❑ When appropriately selected, they enable the researcher carry out his/her project
❑ There are, basically, two types:
➢ Design structure: assigns experimental units into homogeneous groups or blocks
➢ Treatment structure: deals with grouping based on treatment combinations of different orders
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
55
9) DESIGNS STRUCTURE
❑ Completely Randomized Design (CRD) or Simple Random Sampling Method
❑ Randomized Complete Block Design (RCBD) or Stratified Random Sampling Method
❑ Latin square design or Systematic Sampling (select every j-th unit)
❑ Others are: ▪ Lattice design ▪ Split-plot; Double Split (Split-Split) Plot designs ▪ Nested design ▪ Cluster Sampling, etc
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
56
9) TREATMENT STRUCTURE
❑ One-way: a set of n treatments (3 or 4 treatments on growth
of animal or plant)
❑ Two-way: x of Treatment A combined with z of Treatment B
to give a xz Treatment A and B combinations
❑ Three or higher order of treatment combinations: depending on the complexity of the project
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
57
9) EXAMPLES OF DATA SOURCES (FOR SOCIAL SCIENCE RESEARCH)
❑ Qualitative Methods: colour, attitude, preference, etc
➢ Focus group discussion
➢ Key informant interviews
➢ Participatory rural appraisal/rapid appraisal techniques
❑ Quantitative Methods: numbers, weight, percent, etc
➢ Adequacy and plausibility assessments
➢ Surveys
➢ Pre-Post training tests
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
58
9) CRITERIA FOR SELECTING EXPERIMENTAL DESIGNS
Nature of experimental units – level of homogeneity
The type of treatment design structure
The level of precision desired – separating experimental errors, block effects, etc
Amount of resources available – number of animals, plot size, soil nutrient concentration gradient, time availability, etc
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
59
9) CRITERIA FOR SELECTING EXPERIMENTAL DESIGNS
Remember, there is always
an alternate route
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
10) COLLABORATORS
○ Individuals and organizations including governments and their agencies sharing common goals / objectives as planned project
○ They partake in project execution or implementation
○ Seek their consents before including them in proposal
○ Assign specific roles to each of them in areas of competence
○ Most donors encourage multidisciplinary and or transdisciplinary collaborations and partnerships
○ Networking and collaborating enrich proposal
IARD & CEFOR, UniPort
60
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
10) COLLABORATORS (cont’d) IARD & CEFOR,
UniPort
61
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
11) TIME FRAME FOR PROJECT IMPLEMENTATION
○ It is the section that tells the duration of the project or research
○ Duration can be expressed in months or years
○ Some funders stipulate project duration
○ This section guides the table of Time line or Work Plan
IARD & CEFOR, UniPort
62
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
12) PROJECT TIME LINE / WORK PLAN (AN EXAMPLE OF A GANTT CHART) IARD & CEFOR,
UniPort
63
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
64
Creating logframe and project budget (Part II)
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (ASSOCIATED TERMINOLOGIES) IARD & CEFOR,
UniPort
65
○ Indicators/targets: show when objectives have been achieved
○ Means of Verification: sources of data to authenticate targets
○ Assumptions: things considered necessary for project success
○ Impact: expected project goal – plan influence on beneficiaries
○ Outcome: expected project result – is a consequence of impact
○ Output: achievements realized from project implementation
○ Activities: specific actions taken during implementation
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (SUMMARY OF TWO FRAMEWORKS) IARD & CEFOR,
UniPort
66
Type of Framework
Brief Description
Use for Program Management
Basis for Monitoring and Evaluation of PHE
Logic model
Logically, links inputs, processes, outputs, and outcomes of planned activities
Shows the causal relationship between inputs and reaching the objectives
Shows intended progress of activities at all stages of the program – aids indicator selection
Indicator matrix
Logically, links programme goal, objectives, outputs, outcomes, and activities
Shows the causal relationship and steps between activities and meeting objectives
Guides monitoring and aids assessment by stating the information you will collect, how, when, where, and why
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (KEY TERMS ASSOCIATED WITH LOGIC MODEL) IARD & CEFOR, UniPort
67
1. Inputs: human, financial, social, political, or other resources needed to begin / complete programme
2. Processes: activities that produce immediate results – what will you be doing? Methodology?
3. Outputs: immediate results from your processes – what are the results of your activities?
4. Outcomes: longer term or intermediate results – the progress towards achieving your objectives.
5. Impact: long-term changes necessary to sustain your goal.
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (DEFINITION & PURPOSE OF LOGIC MODEL) IARD & CEFOR, UniPort
68
Definition: • Diagrams that, identify and illustrate the linear
relationships flowing from inputs, processes, outputs, and outcomes.
• Inputs or resources affect processes or activities, which produce immediate results or outputs, ultimately leading to longer term or broader results or outcomes.
Purpose: • Provides a streamlined interpretation of planned use of
resources and desired ends. • Clarifies project/programme assumptions about linear
relationships between key factors relevant to desired ends
• Other terms used: M&E Frameworks, indicator matrixes
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (TYPICAL LOGIC MODEL FOR TRAINING ACTIVITY) IARD & CEFOR, UniPort
69
INPUT PROCESS OUTPUT OUTCOME IMPACT
Times and skills to
develop new agricultural technology
training curriculum
Conduct training events
Local farmers trained in new
techniques
Increase in agricultural production from those who adopt
new technologies
Increased food
security in target
population
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (TYPICAL LOGIC MODEL FOR FAMILY PLANNING ACTIVITY) IARD & CEFOR, UniPort
70
INPUT • Human
and financial resources
• Demand for FP in the community
PROCESS • Educate men and women about the advantages of modern method use
• Distribute FP methods in the community
• Train program staff in providing FP information and methods
OUTPUT • Sessions
held in community about family planning methods
• Increased interest in FP
• FP methods distributed in communities
• Clinic staff trained in FP method counseling
OUTCOME 1. Increased
access to contraceptive methods
2. Increased access to FP counseling
3. Increased number of new users of modern methods
4. Increased male participation in FP decisions
IMPACT • Increased contraceptive prevalence
70
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
EXERCISE 5: Create a Logic Model for Your Project
Goal: …
Objective 1: Objective 2: Objective 3:
Activity 2:
Activity 4: Activity 5: Activity 3:
Activity 1:
71
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
EXAMPLE 5: Create a Logic Model for Your Project
72
Goal: Improve the quality of life of people living in forest corridors and ecosystems while insuring sustainable management of Nepal’s natural resources
Objective 1: Health outcomes
of forest-dependent communities
improved by 2008
Objective 2: Enhance capacity of user groups to promote human and ecosystem health by 2007
Objective 3: Increase support
In forest user groups for PHE
by 2008
Activity 2: Develop
Community- based
Distribution System for
FP Products
Activity 4: Promote the Use of Improved Cooking
Stoves
Create Livelihood Opportunities that are
Eco-friendly (i.e., briquette
making from invasive plant species)
Activity 5: Empower Community Forest User Groups (CFUGs) to Manage Forest Assets and
Integrate P&H Interventions into Their Five-year Operational
Plans
Activity 3: Disseminate
FP HIV/AIDS
& PHE Information
through Non-formal Education Channels
Activity 1: Promote Family
Planning as a
Sustainable Livelihood
Approach (SLA) using
Traditional Media (street
Drama)
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (INSERTING INDICATORS TO LOGIC MODEL) IARD & CEFOR, UniPort
73
Input Activity/ Process
Output Outcomes Impact
Quantifiable resources going in to your activities – the things you budget for.
1. What you do to accomplish your objectives?
Immediate results from your activity – people trained, services provided, items produced
Longer-term change in knowledge, attitude, behaviour, etc. related to program goal
Long-term, population level change. Can relate to a program or organization’ s vision/ mission statement
Indicators (example)
How do you measure this?
How do you measure this?
How do you measure this?
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (INSERTING INDICATORS TO FAMILY PLANNING LOGIC MODEL) IARD & CEFOR, UniPort
74
OUTCOME 1. Increased access to FP services 2. Increased condom use
Indicators:
IMPACT • Increased contraceptive prevalence
OUTCOME 1. Increased
access to FP services
2. Increased condom use
3. Increased male participation in FP
OUTPUT • Increased
interest in FP
• Sessions held in community about family planning methods
• Clinic staff trained in FP method counselling
INPUT • Human and
financial resources
• Demand for FP in the community
PROCESS • Educate women about the advantages of modern method use
• Distribute FP methods in the community
• Train program staff in providing FP information and methods
INPUT PROCESS OUTPUT OUTCOME IMPACT
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
13) LOGICAL FRAMEWORK (INSERTING INDICATORS TO FAMILY PLANNING LOGIC MODEL)
IARD & CEFOR, UniPort
75
Indicators:
INPUT PROCESS
OUTPUT • % of program
staff trained to provide FP information to youth
• # of educational sessions held in the community about FP methods
OUTCOME % of women who were clients of community-based FP distributor last year
• # of new acceptors of FP methods
• % of men who approved of FP for themselves or their partners
IMPACT • Contraceptive
prevalence rate
IMPACT • Increased
contraceptive prevalence
OUTCOME 1. Increased
interest in FP
2. Increased access to FP services
3. Increased male participation in FP
OUTPUT • Increased
condom use
• Sessions held in community about FP methods
• Clinic staff trained in FP method counselling
INPUT • Human and
financial resources
• Demand for FP in the community
PROCESS • Educate women
on advantages of modern FP
• Distribute FP materials in the community
• Train program staff in providing FP information and materials
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
76
Definition: A standardized summary of the project and its logic.
The Indicator Matrix is also called the M&E Framework
Purposes: • Summarizes what the project intends to do and how • Summarizes outputs and outcomes that will be monitored and
evaluated • Details the indicators that will be used to measure progress
and achievement of objectives • Encourages discussion of data sources
13) LOGICAL FRAMEWORK (DEFINITION & PURPOSE OF INDICATOR MATRIX)
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
LOGICAL FRAMEWORK (CONT’D) IARD & CEFOR,
UniPort
77
○ Donors who require a logframe also provide formats
○ Is a project planning and management tool useful for evaluation
○ Is a simple table or matrix that clearly summarizes the project
Project objective:
Objectively Verifiable Indicators (OVI)
Means of Verification (MOV)
Assumptions and Risks with Mitigation Plan
Impact
Outcome
Output(s)
Activities
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
LOGICAL FRAMEWORK (CONT’D) IARD & CEFOR,
UniPort
78
Project summary Measurable Indicators
Means of verification
Important Assumptions
Impact: (Max 30 words)
Outcome: (Max 30 words)
0.1 0.2 etc.
0.1 0.2 etc.
Outputs: 1.
1.1 1.2 etc.
1.1 1.2 etc.
2.
3. N.B. - If you have more than 3 outputs, insert a row(s). It is advised to have less than 6 outputs since this level of detail can be provided at the activity level.
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
LOGICAL FRAMEWORK (CONT’D) IARD & CEFOR,
UniPort
79
Problem Statement: A description of the problem that a programme or project seeks to solve
Goal: The intended aim or impact over the life of a programme or project
Outcomes: The changes expected to result from a programme or project - positive changes among clients, communities, systems or organization
Rationales: Explain why you believe the programme activities will produce results
Resources: People, time, materials, funds required for a programme or project
Activities: The actions a programme or project shall take to to achieve desired results
Outputs: The tangible, direct products or results of the programme or project activities
Assumptions /Risks: State the factors necessary for programme or project success already in place
External Factors: Other influences on programme or project results; circumstances beyond programme or project control
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
14) PROJECT BUDGET
○ This section is very crucial in the proposal because, it can lead to your proposal being thrown out, especially, when the budget gives you out as not being very knowledgeable about the project you are proposing to implement
○ Strictly, follow budget format/guidelines provided by the funder
○ Must be realistic, detailed, and accurate
○ Make provisions for inflation in multi-year projects
○ Avoid the following, when preparing budget:
– sloppiness (incomplete budget)
– wastages (inflated budgets are signals of waste) – creating doubts (when budgets are too low)
– calculation errors (portray you as careless)
IARD & CEFOR, UniPort
80
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
SAMPLE PROJECT BUDGET SUMMARY (Remember, Detailed Budget Must be Prepared as Provided in the Specific Call for Proposal or Concept Note Since Different Projects
have Different Durations - 6; 12, 18, 24, 36, 48 or more months)
IARD & CEFOR, UniPort
81
Budget Item Year 1 Year 2 Year 3 Total ($) %
Travels 20,800 21,840 22,880 65,520 15.1
Equipment 30,080 31,584 33,088 94,752 21.8
Other direct costs 14,250 14,963 15,675 44,888 10.3
Salaries and Stipends 14,700 15,435 16,170 46,305 10.6
Consultants 7,000 7,350 7,700 22,050 5.1
Contracted Services 44,700 46,935 49,170 140,805 32.4
Total Direct Costs 131,530 138,107 144,683 414,320 95.2
Institutional Indirect Costs 6,580 6,910 7,235 20,716 4.8
Grand Total 138,110 145,017 151,918 435,036 100
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
15) ANNEXES
○ Provide details of other documents that support proposal
○ Also, contain maps and other explanatory diagrams, if any
IARD & CEFOR, UniPort
82
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
CHECKLIST FOR FLYING PROPOSALS (PARTS I & II) IARD & CEFOR, UniPort
83
❑ Can your idea be presented in one or two sentences?
❑ Is there a definite problem targeted for solution?
❑ Is your idea a creative or unconventional approach to solving the identified problem?
❑ Does your idea have the relevant scientific solution to succeed?
❑ Can the idea be, successfully, implemented within the proposed budget?
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
84
Approach for project implementation (Part III)
IARD & CEFOR, UniPort
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
OUTLINE OF PRESENTATION (PART III) IARD & CEFOR,
UniPort
85
❖ Project Implementation Plan
❖ Implementation Plan Outlines
❖ Critical Success Factors
❖ Project Team and Leadership
❖ Managing Donor Responses
❖ Grants Management Basics
❖ Sources of Funding Opportunities
❖ Further Readings
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
PROJECT IMPLEMENTATION PLAN
Why prepare an Implementation Plan? To answer three fundamental questions:
What is or are the project objective(s)?
How will the project be executed?
What are the indicators that the objectives have been achieved?
IARD & CEFOR, UniPort
86
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IMPLEMENTATION PLAN OUTLINES
○ Project Title – 5 to 10 words ideal (or maximum 16 words)
○ Justification – state problem/challenge, reason for occurrence, collaborators (if any)
○ Project Objectives – indicate purpose for study
○ Target Audience – state direct and indirect beneficiaries
○ Project Benefits – outline short-, medium- and long-term specify whether direct or indirect
○ Inputs – personnel, equipment, communication facilities, etc available/needed to conduct project activities
IARD & CEFOR, UniPort
87
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IMPLEMENTATION PLAN OUTLINES (CONT’D)
○ Outputs – specify quantitative and qualitative results
○ Project Activities – outline activities to complete project
○ Roles and Responsibilities – specify activities per named team member / due dates
○ Project Budget – indicate items and costs; direct/indirect costs; value in-kind, in-time, sunk cost
(embedded cost, prior year cost, stranded cost, sunk capital)
○ Timeline – Gantt chart should be attached; milestones
○ Monitoring and Evaluation – regular meetings; reports
IARD & CEFOR, UniPort
88
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
89
Critical Success Factors
Commitment from heads of stakeholder
units
Good knowledge of your organization’s
SWOT Analysis
Commitment from all staff of your organization
Need for a Champion or Change
Agent
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
PROJECT TEAM MEMBERSHIP
➢ Good knowledge of internal organizational functions and procedures
➢ Appreciates the “unwritten” organizational cultures
➢ Good interpersonal relationship
➢ Prior experience of good team work
IARD & CEFOR, UniPort
90
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
PROJECT TEAM LEADERSHIP
☑ Leadership capacity – guides team for solutions
☑ Excellent communication skills
☑ Understands the vision of the organization
☑ Easy access to organization’s leadership and management team
☑ Tactfulness, patience, ability to think – emotional intelligence
IARD & CEFOR, UniPort
91
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
PROJECT TEAM LEADERSHIP (CONT’D) IARD & CEFOR,
UniPort
92
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
MANAGING DONOR RESPONSES
❖ Proposal Accepted – implement project as approved
❖ Proposal Returned for Revision – revise and resubmit according to reviewer’s comments
❖ Proposal Rejected – ask for Debriefing – politely, ask for suggestions and criticisms – use response to appreciate why rejected – do not judge, blame or feel bad – rather, identify the learning points – improve the proposal for next time
IARD & CEFOR, UniPort
93
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
GRANTS MANAGEMENT BASICS
❖ After securing the grant, WHAT NEXT?
IARD & CEFOR, UniPort
94
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
ROLES AND RESPONSIBILITIES (GRANTEE)
❖ Ensure compliance with donor/funder regulations
❖ Maintain adequate financial and technical records
❖ Communicate, regularly, with all stakeholders
❖ Ensure effective cash management
❖ Monitor and evaluate budget against activities
❖ Ask for “No-Cost Extension (NCE), where necessary
IARD & CEFOR, UniPort
95
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
ROLES AND RESPONSIBILITIES (PROJECT MANAGER)
❖ Performs overall responsibility and oversight including managing contracted services
❖ Comprehend and comply with terms and conditions of the grant
❖ Ensure successful achievement of project goal(s) and objective(s)
❖ Submission of relevant progress, procurement and financial reports within stipulated deadlines
❖ Maintain all records for audit purposes
IARD & CEFOR, UniPort
96
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
RISK INDICATORS IN GRANTS MANAGEMENT
❖ Misuse of project funds
❖ Failure to comply with agreed rules and regulations
❖ Tolerance of misconduct or violation of grants conditions
❖ Spend funds on wrong budget category
❖ Allow ongoing minor problems left unresolved
❖ Compromising meeting project goals and giving false certification of requirements
IARD & CEFOR, UniPort
97
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
BEST PRACTICES IN GRANTS MANAGEMENT
❖ Organize for receipt and management of grants
❖ Convene meeting of all stakeholders once grant is received
❖ Ensure consensus and regular team building efforts through effective communication
❖ Develop internal guideline for managing grants
❖ Have internal quality assurance in place
❖ Continually, build team stakeholder capacity
IARD & CEFOR, UniPort
98
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
IARD & CEFOR, UniPort
99
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
SOURCES OF FUNDING OPPORTUNITIES
❑ Through search engines – Google ❑ International donors and funders: AAU (www.aau.org);
ACU (https://www.acu.ac.uk); AGRA (www.agra.org);
BMGF (www.gatesfoundation.org); DFID (www.gov.uk/dfid);
DAAD (https://www.daad.de/); USAID (www.grants.gov);
EU (EuropeAid); Sida (www.sida.se); Fulbright (www.cies.org); IDRC (www.idrc.ca); IFS (www.ifs.se); NSF (www.nsf.gov)
❑ National donors and funders:
PTDF (www.ptdf.gov.ng); TETFund (www.tetfund.gov.ng);
NAPEP (www.napepnigeria.org); NCRI (www.arcnigeria.org) ❑ Some Embassies and High Commissions in Nigeria ❑ Newsletters: AfNet; CKDN; SciDev.net; PAEPARD; Rellefweb ❑ Databases: www.terravivagrants.org; www.fundfomgos.org ❑ Local and Foreign Newspapers and Magazines
IARD & CEFOR, UniPort
100
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
FURTHER READINGS ○ Common Grant Application (National Network of
Grantsmakers), http://www.nng.org/cga.html. ○ Grant Writing Tips Sheet, http://grants1.nih.gov/grants/
grant_tips .htm. ○ Grant-writing Tools for Non-profit Organizations (Non-Profit
Guides), http://www.npguides.org/. ○ Onoja, A.O. (2012) Guide to Modern Research Report Writing
and Dissemination Organization, Criterion Consult (Nig.), Lagos, Nigeria.
○ Sample proposals: http://www.npguides.org/guide/ sample_proposals.htm.
○ Vincent, F. (2003) Fundraising and Financial Management – A guide for NGOs and Southern Development Organizations, Development and Innovation Network (IRED), Geneva, Switzerland.
IARD & CEFOR, UniPort
101
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
102
IARD & CEFOR, UniPort
Post-Lecture Questionnaire 1. Were your expectations met? (Yes / No)
2. If your response to Question 1 is Yes, please, state how: …………………………………………………………………………………… …………………………………………………………………………………… ……………………………………………………………………………………
3. Please, suggest areas for improving the presentation? ……………….. ……………………………………………………………………………………
4. Which aspect of the presentation did you dislike most? ……………….. …………………………………………………………………………………….
5. What aspect of the presentation did you like most? …………………….. …………………………………………………………………………………….
6. In what way(s) has the presentation, changed your thinking? ……….. ……………………………………………………………………………………
7. Please, state your key next steps to actualize this new thinking …………………………………………………………………………………… …………………………………………………………………………………… ……………………………………………………………………………………
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
103
Thank You
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g
104
TAKE HOME ASSIGNMENT Write a concept note on the new project topic you developed during the module and email ([email protected]) for review.
Email Subject Line: INRES 2021 PhD Concept Note - first name.surname
The format should be in: • Font type and size = Arial 12 • Line spacing = single line • Not more than three A4 pages plus one for logframe
Submission Timeline: • 14th July 2021: Student emails draft proposal • 28th July 2021: Lecturer returns reviewed draft • 4th August 2021: Student re-mails revised draft • 11th August 2021: Lecturer confirms revision
- Student proofreads work & searches for donors - Student locates prospective funding source - Then, apply based on potential donor deadline
IC T
a n
d R
esea rch
M eth
od s: P
rop osa
l W ritin
g