Processes, Facilities, and Work Systems ( discussion )
Work Design and Measurement
Chapter 7
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
You should be able to:
LO 7.1 Explain the importance of work design
LO 7.2 Compare and contrast the two basic approaches to job design
LO 7.3 Discuss the advantages and disadvantages of standardization
LO 7.4 Describe behavioral approaches to job design
LO 7.5 Discuss the impact of working conditions on job design
LO 7.6 Compare the advantages and disadvantages of time-based and output-based pay systems
LO 7.7 Explain the purpose of methods analysis and describe how methods studies are performed
LO 7.8 Describe four commonly used techniques for motion study
LO 7.9 Define a standard time
LO 7.10 Describe and compare time study methods and perform calculations
LO 7.11 Describe work sampling and perform calculations
LO 7.12 Compare stopwatch time study and work sampling
Chapter 7: Learning Objectives
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Job Design
Job design
The act of specifying the contents and methods of jobs
What will be done in a job
Who will do the job
How the job will be done
Where the job will be done
Importance
Organization’s are dependent on human efforts to accomplish their goals
Many job design topics are relevant to continuous and productivity improvement
Objectives
Productivity
Safety
Quality of work life
LO 7.1
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Efficiency vs. Behavioral Job Design
Efficiency School
Emphasizes a systematic, logical approach to job design
A refinement of Frederick Winslow Taylor’s scientific management concepts
Behavioral School
Emphasizes satisfaction of needs and wants of employees
LO 7.2
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Specialization
Specialization
Work that concentrates on some aspect of a product or service
| Advantages | |
| For management: Simplifies training High productivity Low wage costs | For employees: Low education and skill requirements Minimum responsibility Little mental effort needed |
| Disadvantages | |
| For management: Difficult to motivate quality Worker dissatisfaction, possibly resulting in absenteeism, high turnover, disruptive tactics, poor attention to quality | For employees: Monotonous work Limited opportunities for advancement Little control over work Little opportunity for self-fulfillment |
LO 7.3
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Behavioral Approaches to Job Design
Job Enlargement
Giving a worker a larger portion of the total task by horizontal loading
Job Rotation
Workers periodically exchange jobs
Job Enrichment
Increasing responsibility for planning and coordination tasks, by vertical loading
LO 7.4
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Motivation
Motivation is a key factor in many aspects of work life
Influences quality and productivity
Contributes to the work environment
Trust is an important factor that affects motivation
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Teams
Teams take a variety of forms:
Short-term team
Formed to collaborate on a topic or solve a problem
Long-term teams
Self-directed teams
Groups empowered to make certain changes in their work processes
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Benefits of teams
Higher quality
Higher productivity
Greater worker satisfaction
Team problems
Some managers feel threatened
Conflicts between team members
Teams
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Quality of Work Life
Quality of work life affects not only workers’ overall sense of well-being and contentment, but also their productivity
Important aspects of quality of work life:
How a worker gets along with co-workers
Quality of management
Working conditions
Compensation
LO 7.5
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Compensation
It is important for organizations to develop suitable compensation plans for their employees
Compensation approaches
Time-based systems
Output-based systems
Incentive systems
Knowledge-based systems
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Time-based system
Compensation based on time an employee has worked during the pay period
Output-based (incentive) system
Compensation based on amount of output an employee produced during the pay period
Compensation Systems
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Comparing Compensation Approaches
| Management | Worker | |
| TIME-BASED Advantages | Stable labor costs Easy to administer Simple to compute pay Stable Output | Stable pay Less pressure to produce than under output system |
| Disadvantages | No incentive for workers to increase output | Extra efforts not rewarded |
| OUTPUT-BASED Advantages | Lower cost per unit Greater output | Pay related to efforts Opportunity to earn more |
| Disadvantages | Wage computation more difficult Need to measure output Quality may suffer Difficult to incorporate wage increases Increased problems with scheduling | Pay fluctuates Workers may be penalized because of factors beyond their control (e.g., machine breakdown) |
LO 7.6
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Individual incentive plans
Straight piecework
Worker’s pay is a direct linear function of his or her output
Minimum wage legislation has reduced their popularity
Base rate + bonus
Worker is guaranteed a base rate, tied to an output standard, that serves as a minimum
A bonus is paid for output above the standard
Group incentive plans
Tend to stress sharing of productivity gains with employees
Individual and Group Incentive Plans
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Knowledge-based pay
A pay system used by organizations to reward workers who undergo training that increases their skills
Three dimensions:
Horizontal skills
Reflect the variety of tasks the worker is capable of performing
Vertical skills
Reflect the managerial skills the worker is capable of
Depth skills
Reflect quality and productivity results
Knowledge-Based Pay Systems
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Management Compensation
Many organizations used to reward managers based on output
New emphasis is being placed on other factors of performance
Customer service
Quality
Executive pay is increasingly being tied to the success of the company or division for which the executive is responsible
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Methods Analysis
Analyzing how a job gets done
It begins with an analysis of the overall operation
It then moves from general to specific details of the job concentrating on
Workplace arrangement
Movement of workers and/or materials
Methods Analysis
LO 7.7
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
The need for methods analysis can arise from a variety of sources
Changes in tools and equipment
Changes in product design or introduction of new products
Changes in materials and procedures
Government regulations or contractual agreements
Accidents or quality problems
The Need for Methods Analysis
LO 7.7
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Methods Analysis Procedure
Identify the operation to be studied, and gather relevant data
Discuss the job with the operator and supervisor to get their input
Study and document the present methods
Analyze the job
Propose new methods
Install the new methods
Follow up implementation to assure improvements have been achieved
LO 7.7
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Consider jobs that:
Have a high labor content
Are done frequently
Are unsafe, tiring, unpleasant, and/or noisy
Are designated as problems
Quality problems
Processing bottlenecks
etc.
Guidelines for Selecting a Job to Study
LO 7.7
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Analyzing the Job: Flow Process Charts
Flow process chart
Chart used to examine the overall sequence of an operation by focusing on movements of the operator or flow of materials
LO 7.7
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Analyzing the Job: Worker-Machine Chart
Worker machine chart
Chart used to determine portions of a work cycle during which an operator and equipment are busy or idle
LO 7.7
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Motion study
Systematic study of the human motions used to perform an operation
Motion Study Techniques
Motion study principles– guidelines for designing motion-efficient work procedures
Analysis of therbligs– basic elemental motions into which a job can be broken down
Micromotion study– use of motion pictures and slow motion to study motions that otherwise would be too rapid to analyze
Charts– activity or process charts, simo charts (simultaneous motions)
Motion Study
LO 7.8
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Developing Work Methods
In developing work methods that are motion efficient, the analyst attempts to
Eliminate unnecessary motions
Combine activities
Reduce fatigue
Improve the arrangement of the workplace
Improve the design of tools and equipment
LO 7.8
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Work Measurement
Work measurement is concerned with how long it should take to complete a job.
It is not concerned with either job content or how the job is to be completed since these are considered a given when considering work measurement.
LO 7.9
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Work Measurement
Standard time
The amount of time it should take a qualified worker to complete a specified task, working at a sustainable rate, using given methods, tools and equipment, raw material inputs, and workplace arrangement.
Commonly used work measurement techniques
Stopwatch time study
Historical times
Predetermined data
Work sampling
LO 7.9
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Stopwatch Time Study
Used to develop a time standard based on observations of one worker taken over a number of cycles.
Standard Elemental Times
are derived from a firm’s own historical time study data.
Predetermined time standards
involve the use of published data on standard elemental times.
Work sampling
a technique for estimating the proportion of time that a worker or machine spends on various activities and idle time.
Work Measurement Techniques
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Stopwatch Time Study
Used to develop a time standard based on observations of one worker taken over a number of cycles.
Basic steps in a time study:
Define the task to be studied and inform the worker who will be studied
Determine the number of cycles to observe
Time the job, and rate the worker’s performance
Compute the standard time
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
The number of observations to collect is a function of
Variability of the observed times
The desired level of accuracy
Desired level of confidence for the estimated job time
Number of Cycles to Observe
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Observed Time
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Normal Time
Assumes that a single performance rating has been made for the entire job
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Normal Time
Assumes that performance ratings are made on an element-by-element basis
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Standard Time
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Historical Times
Standard Elemental Times are derived from a firm’s own historical time study data.
Over time, a file of accumulated elemental times that are common to many jobs will be collected.
In time, these standard elemental times can be retrieved from the file, eliminating the need to go through a new time study to acquire them.
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Predetermined time standards involve the use of published data on standard elemental times.
Developed in the 1940s by the Methods Engineering Council.
The MTM (methods-time-measurement) tables are based on extensive research of basic elemental motions and times.
To use this approach, the analyst must divide the job into its basic elements (reach, move, turn, etc.) measure the distances involved, and rate the difficulty of the element, and then refer to the appropriate table of data to obtain the time for that element
Predetermined Time Standards
LO 7.10
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Work sampling is a technique for estimating the proportion of time that a worker or machine spends on various activities and the idle time.
Work sampling does not require timing an activity or involve continuous observation of the activity
Uses:
ratio-delay studies which concern the percentage of a worker’s time that involves unavoidable delays or the proportion of time a machine is idle.
analysis of non-repetitive jobs.
Work Sampling
LO 7.11
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Work Sampling
LO 7.11
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Work Sampling vs. Stopwatch Time Studies
| Advantages | |
| Observations are spread out over a period of time, making results less susceptible to short-term fluctuations There is little or no disruption of work Workers are less resentful Studies are less costly and less time-consuming, and the skill requirements of the analyst are much less Studies can be interrupted without affecting the results No timing device is required It is well suited for nonrepetitive tasks | |
| Disadvantages | |
| There is much less detail on the elements of a job Workers may alter their work patterns when they spot the observer, thereby invalidating the results In many cases, there is no record of the method used by the worker Observers may fail to adhere to a random schedule of observations It is not well suited for short, repetitive tasks Much time may be required to move from one workplace to another and back to satisfy the randomness requirement |
LO 7.12
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
Job Design Success
Success factors:
Carried out by personnel with appropriate training and background
Consistent with the goals of the organization
In written form
Understood and agreed to by both management and employees
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
It is important to make design of work systems a key element of strategy:
People are still at the heart of the business
Workers can be valuable sources of insight and creativity
It can be beneficial to focus on quality of work life and instilling pride and respect among workers
Companies are reaping gains through worker empowerment
Operations Strategy
Copyright ©2018 McGraw-Hill Higher Education
7-‹#›
mean
Sample
error
acceptable
Maximum
percentage
accuracy
Desired
deviation
standard
Sample
confidence
desired
for
needed
stddev.
normal
of
#
where
or
2
2
=
=
=
=
=
÷
ø
ö
ç
è
æ
=
÷
ø
ö
ç
è
æ
=
x
e
a
s
z
e
zs
n
x
a
zs
n
ns
observatio
of
Number
times
recorded
of
Sum
time
Observed
OT
where
OT
=
=
=
=
å
å
n
x
n
x
i
i
rating
e
Performanc
PR
time
Normal
NT
where
PR
OT
NT
=
=
´
=
(
)
j
j
x
x
j
j
j
j
element
for
rating
e
Performanc
PR
element
for
time
Average
time
Normal
NT
where
PR
NT
=
=
=
´
=
å
on workday
based
percentage
Allowance
1
1
AF
time
job
on
based
percentage
Allowance
1
AF
and
factor
Allowance
AF
time
Standard
ST
where
AF
NT
ST
day
job
=
-
=
=
+
=
=
=
´
=
A
A
A
A
size
Sample
size
sample
by the
divided
s
occurrence
of
number
(the
proportion
Sample
ˆ
confidence
desired
achieve
to
needed
deviations
standard
of
Number
)
ˆ
1
(
ˆ
=
=
=
-
=
n
p
z
n
p
p
z
e
percent
error
maximum
)
ˆ
1
(
ˆ
2
=
-
÷
ø
ö
ç
è
æ
=
e
p
p
e
z
n