CIS 499
Project Plan
Name
CIS 499
Professor
Date
Project Plan
Remove - Use this section to type an introduction- Write Develop a thirty to forty (30-40) page design document – NOT including Title, diagram, source page in which you: Remove
REMOVE - Paragraphs – Start first sentence with either 5 to 7 spaces (Note: all paragraphs should be in unison - REMOVE.
Note: Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and Source follow SWS or school-specific format. Check with your professor for any additional instructions. - REMOVE.
Written Project Plan
REMOVE - Write a five to ten (5-10) page executive summary that provides a high-level technical overview of your project in which you: - REMOVE
Project and Control Measures.
REMOVE - Describe the scope of the project and control measures. - REMOVE
Goals and Objectives.
REMOVE - Describe the goals and objectives of the project. - REMOVE
High-Level Overview.
REMOVE - Include a high-level overview of all project deliverables. - REMOVE
Realistically Estimated Cost Analysis.
REMOVE - Give a detailed, realistically estimated cost analysis of the entire project, including human capital. - REMOVE
Project Plan Solution.
REMOVE - Relate the value of the project plan solution to the competitive advantage that information technology will afford your organization. - REMOVE
Development and Implementation.
REMOVE - Recommend solution providers who can assist with development and implementation. - REMOVE
REMOVE Combine all previous documentation for Project Deliverables 1-5 in which you:
Project Deliverable 1: Project Plan Inception
Project Deliverable 2: Business Requirements
Project Deliverable 3: Database and Data Warehousing Design
Project Deliverable 4: Analytics, Interfaces, and Cloud Technology
Project Deliverable 5: Infrastructure and Security
Use at least five (5) quality resources in this assignment, (Recommend six or more). Note: Wikipedia and similar Websites do not qualify as quality resources.
· Provide all aspects of the information technology implementation into the project plan.
· Revise the documentation based on feedback from the earlier evaluation of your deliverable. – REMOVE.
Remove - Section 1 of this assignment must follow these formatting requirements:
· This course requires use of new Strayer Writing Standards (SWS). The format is different than other Strayer University courses. Please take a moment to review the SWS documentation for details.
· Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow SWS or school-specific format. Check with your professor for any additional instructions.
· Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
· Include charts or diagrams created in MS Visio or Dia as an appendix of the project plan. All references to these diagrams must be included in the body of the project plan.-remove
Project Deliverable 1: Project Plan Inception
Project Deliverable 2: Business Requirements
Project Deliverable 3: Database and Data Warehousing Design
Project Deliverable 4: Analytics, Interfaces, and Cloud Technology
Project Deliverable 5: Infrastructure and Security
Sources
Remove - The use of at least five (5) quality resources in this assignment Recommend six or more (6). Note: Wikipedia and similar. Websites do not qualify as quality resources. PROVIDE IN-TEXT CITATION-Remove
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
2