Case Study #1 - Week 4 Rohith Kumar Mara on Fri, Jan 31 2020, 11:04 AM
100% highest match Submission ID: 28f959de-9dd5-46ad-8f0f-da32c68fa9df
Attachments (1)
FIRST COME FIRST SERVED Case Study.docx
Running head: 1 "FIRST COME FIRST SERVED" 2 RESOURCES CHALLENGE 1
"FIRST COME FIRST SERVED" RESOURCES CHALLENGE 2
Title: 3 FIRST COME FIRST SERVED CASE STUDY STUDENT NAME:ROHITH
KUMAR MARA
4 INSTITUTION:UNIVERSITY OF CUMBERLANDS
Date:1/31/2020
1. 4 DESCRIBE SOME OF THE RESOURCE CONSTRAINTS THAT SUNRISE
AND ITS PROJECT MANAGERS ARE FACING.
SUNRISE RESTORATION AND REMODELING IS A SMALL PRIVATELY-
OWNED COMPANY. IN MOST OF THE SMALL COMPANIES, THE MAJOR
CONSTRAINT LIES IN THE BUDGET. ON TOP OF THE BUDGET, IF THERE ARE
MORE PROJECTS HANDLED AT THE SAME TIME AND RESOURCE SHARING,
RESOURCES ARE ALSO A BIG CONCERN. WHILE DISCUSSING RESOURCE-
CONSTRAINED BASED ON THE GIVEN TOPIC, WE CAN SEE, FROM THE
(http://safeassign.blackboard.com/)
FIRST COME FIRST SERVED Case Study.docx Word Count: 1,500 Attachment ID: 2514932474
100%
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 2/24
OWNER'S PERSPECTIVE, THERE ARE PROJECT MANAGERS WHO ARE NOT
WILLING TO WORK WITH ONE ANOTHER. LIMITED TECHNICIANS AND
UNAVAILABILITY OF LOW COST, EFFICIENT SUB-CONTRACTORS. IN
ADDITION TO THAT, EQUIPMENT IS ALSO LIMITED. CONSIDERING THE
GIVEN EXAMPLE, THEY ONLY HAVE ONE EQUIPMENT. 1 THE RULE "FIRST
COME FIRST SERVED" 4 WAS MEANT TO AVOID MISUSES OF EQUIPMENT
AND TECHNICIANS BUT IT HAS TURNED OUT IN FAVOR OF KEN, AS HE
WORKS THINGS OUT CLEVERLY. THE 3 MAIN RESOURCE CONSTRAINTS
INCLUDE EQUIPMENT, TECHNICIANS AND SUB-CONTRACTORS. THE
EQUIPMENT IS LIMITED IN NUMBER AND THE PROJECT MANAGER WHO
GETS HAND FIRST ON THE EQUIPMENT ARE ENTITLED TO THAT
EQUIPMENT FOR THE DURATION OF THE USE. THIS LEAVES OTHER
PROJECT MANAGERS IDLE FOR THE TIME BEING IF THERE IS A
DEPENDENCY ON THAT EQUIPMENT. ADDITIONALLY, FROM THE LOOKS OF
CONTEXT, THERE IS NO RESERVATION POLICY WHICH MAKES IT
DIFFICULT FOR PLANNING THE PROJECTS. THIS GOES THE SAME WITH
TECHNICIANS. TECHNICIANS ARE INTENDED TO BE A SUPPLEMENTAL
HUMAN RESOURCE, WORKING IN ADDITION TO THE SUBCONTRACTOR
EXPERTS. SINCE THE EFFICIENT TECHNICIANS ARE LIMITED IN NUMBER,
IT FACES THE SAME DIFFICULTY AS EQUIPMENT. SUNRISE DOES NOT HAVE
A HUGE LIST OF EFFICIENT SUB-CONTRACTORS WHO CAN BE HIRED AT
LOW COSTS AND EXTRACT GOOD RESULTS. HENCE RELYING ON SUB-
CONTRACTORS ABILITY IS A CONSTRAINT (PINTO, J.K., 2019).
2. 4 IS SUNRISE'S CURRENT METHOD OF PRIORITIZING RESOURCE
ASSIGNMENTS VIABLE? WHY OR WHY NOT?
SUNRISE'S CURRENT METHOD OF PRIORITIZING RESOURCE ASSIGNMENTS
IS NOT VIABLE. THEIR CURRENT PRACTICE OF FIRST COME FIRST SERVE
BASIS IS NOT EFFICIENT AS PROJECT MANAGERS HAVE CANNOT PLAN
THEIR ACTIVITIES IN THE FUTURE. IF WE TAKE THE GIVEN EXAMPLE, DUE
TO THE LIMITED NUMBER OF EQUIPMENT, TYLER COULD NOT GET THE
EQUIPMENT THAT DELAYED HIS PART OF THE PROJECT FOR 3-DAYS
WHILE THE EQUIPMENT IS IN USE BY KEN. THESE 3 DAYS OF IDLENESS
NOT ONLY INCUR PROJECT TIME DELAY, BUT WORKERS NEED TO BE PAID,
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 3/24
PROJECT MANAGERS NEED TO PAY. IF ANY FOLLOW ON ACTIVITY IS BEING
PLANNED WHICH INCLUDES EXTERNAL PARTIES/VENDORS, THAT WOULD
BE IN JEOPARDY. FEES TO ACCOMMODATE IN AN UPDATED TIME/DAY
SETTING WILL BE INCURRED. ALSO, THIS WOULD FALL UNDER THE LUCK
CATEGORY OF THE PROJECT MANAGER GETTING THE EQUIPMENT EVEN
AFTER 3RD DAY. THIS MIGHT BE A SMALL COMPANY BUT IT DOES INCLUDE
MORE THAN TWO PROJECT MANAGERS AND IT IS HIGHLY LIKELY FOR THE
THIRD MANAGER TO GET HOLD OF EQUIPMENT BEFORE TYLER, WHICH
WOULD BE A VERY BAD SCENARIO FOR TYLER’S PROJECT. IF THE PROJECT
MANAGER’S MAIN CONCERN DRILL DOWN TO HOW TO GET HOLD OF
EQUIPMENT FIRST, HIS OTHER PROJECT-RELATED ACTIVITIES WILL BE IN
TROUBLE. FIRST COME FIRST SERVED BASES COULD HOLD GOOD IF IT HAS
A RESERVATION SYSTEM. THE FIRST AVAILABLE PERSON TO RESERVE THE
UNIT FOR THE FUTURE ACTIVITY SHOULD BE ALLOWED TO USE IT. THIS
GIVES ENOUGH TIME FOR THE PROJECT MANAGER TO PLAN
ACCORDINGLY.
3. 4 HOW COULD TECHNOLOGY ALLEVIATE SOME OF SUNRISE'S
RESOURCE MANAGEMENT ISSUES?
TECHNOLOGY HAS BEEN VERY HELPFUL IN DEALING WITH SITUATIONS
LIKE THESE, AS MENTIONED IN A GIVEN CASE STUDY PERTAINING TO
RESOURCE MANAGEMENT. AS MENTIONED ABOVE, THE RESERVATION
SYSTEM WOULD HELP THE PROJECT MANAGER EFFICIENTLY PLAN FOR
THE PROJECT. IF ALL PROJECT MANAGER'S PLANS ARE HIGHLIGHTED
UNDER ONE APPLICATION, IT WOULD SHOW ALL CONFLICTING ACTIVITIES
OR RESOURCE ALLOCATION BEFOREHAND GIVING THE PROJECT
MANAGER ENOUGH TIME TO NEGOTIATE OR LOOKOUT FOR ALTERNATIVES
OR PROVIDE TIMELINE ESTIMATES ACCORDINGLY (FELIPE, ERIC, PIERRE,
& DAVY, 2019). ALTHOUGH NOT ALL PROJECT MANAGERS WOULD WANT
THEIR PLANS TO BE DISCLOSED TO ONE ANOTHER, TECHNOLOGY CAN
HELP KEEP THE REST OF THE PLAN HIDDEN FROM OTHER PROJECT
MANAGERS AND ONLY HIGHLIGHT THE CONFLICTING PARTS. HERE IS
WHERE PROJECT MANAGEMENT RELATED SOFTWARE CAN BE REALLY
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 4/24
HELPFUL TO UNDERSTAND THE AVAILABILITY OF THE GIVEN RESOURCE
IN FUTURE TIME.
4. 5 WOULD TYLER'S SUGGESTION TO HIRE ADDITIONAL TECHNICIANS
AND PURCHASE MORE EQUIPMENT TO SOLVE THE RESOURCE PROBLEMS
AT SUNRISE? 4 WHY OR WHY NOT?
TYLER'S SUGGESTIONS ARE BASED ON HIS CURRENT PROJECT AND THAT
IS NOT ENTIRELY. HENCE, HIS SUGGESTIONS TO ADD TECHNICIANS AND
PROCURE MORE EQUIPMENT ARE NOT GOING TO SOLVE THE OVERALL
PROBLEM. IT MIGHT SOLVE HIS PROBLEM PERTAINING TO HIS PROJECT,
BUT IT WILL CREATE A PROBLEM FOR HIS OWNER AS RIGHTLY
MENTIONED, IDLENESS OF EQUIPMENT. THE MAIN PROBLEM IS WITH
EQUIPMENT NOT AVAILABLE AT A GIVEN TIME. TIME IS THE PROBLEM.
HENCE, A SOLUTION SHOULD COME OUT DEALING WITH HOW THE
EQUIPMENT WOULD BE AVAILABLE EQUALLY TO ALL PROJECT MANAGERS
AND ON TIME. ADDING NEW EQUIPMENT WOULD INCREASE IDLE TIME
AND THAT IDLE TIME EATS UP THE BUDGET FROM THE COMPANY, WHICH
NO COMPANY WANTS AND IS NOT EFFICIENT. AS RIGHTLY STATED, THE
ISSUE HAS OCCURRED FOR JUST ONE PROJECT MANAGER OUT OF MANY,
SO IT IS MORE SUBJECTIVE THAN OBJECTIVE. THE PROJECT MANAGER
NEEDS TO BE CO-OPERATIVE AND WORK HOW OTHER PROJECT MANAGERS
WOULD, WHO ARE NOT COMPLAINING (BENJAMIN K. & Robert M., 2019).
5. 4 PUT YOURSELF IN TYLER 'S POSITION AND CREATE A ONE-PAGE
PROPOSAL FOR THE SUNRISE OWNER. OUTLINE THE CURRENT ISSUES
BRIEFLY WITH CORRESPONDING DETAILED RECOMMENDATIONS FOR
ACTION. YOUR ACTIONABLE IMPROVEMENTS MUST BE SPECIFIC, ADDRESS
YOUR (TYLER'S) CONCERNS, ALIGN WITH THE OWNER'S PRIORITIES, AND
OUTLINE THE BENEFITS OF YOUR SOLUTIONS IN A PERSUASIVE MANNER
PROPOSAL FOR ONGOING IDENTIFIED ISSUES
TO, OWNER, SUNRISE RECONSTRUCTION AND REMODELING, ISSUE
DESCRIPTION: UNAVAILABILITY OF RESOURCES ON TIME LEADING TO
FAILURE OF DELIVERING RESULTS AND UNSATISFACTORY CUSTOMER
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 5/24
REMARKS. RESOURCES ARE NOT ALLOCATED IN ADVANCE AND DUE TO
THE FIRST COME FIRST SERVED POLICY, IT IS ONLY AT THE TIME OF NEED,
WE REALIZE THAT EQUIPMENT IS NOT AVAILABLE. THE SAME GOES FOR
THE TECHNICIANS.
Recommendation: 4 HIRING NEW TECHNICIANS AND PROCURING NEW
EQUIPMENT WILL ONLY INCUR ADDITIONAL CHARGES DURING THEIR
DOWNTIME AS RIGHTLY OUTLINED BY YOU. I DO AGREE WITH THAT
STATEMENT AND I GOT AN OPPORTUNITY TO WIDEN THE REQUIREMENT.
BASED ON MY RESEARCH, I BELIEVE MAKING USE OF FREE TO VERY
CHEAP COMPUTER APPLICATIONS WOULD HELP US RESOLVE THIS ISSUE.
MY COLLEAGUE WORKING IN ANOTHER COMPANY MENTIONS HOW THEY
USE RESERVATION SYSTEMS BASED ON PROJECT COMMITMENTS AND
THAT HAS BEEN WORKING OUT PRETTY WELL. OUR FIRST COME FIRST
SERVED BASIS CAN PROVE TO BE MORE ADVANTAGEOUS IF USED FOR THE
RESERVATION. THE FIRST PERSON TO RESERVE IT CAN RESERVE IT FOR
HIS PROJECTS. THIS WILL GIVE ENOUGH TIME FOR OTHER PROJECT
MANAGERS TO ALIGN THAT SPECIFIC ACTIVITY TO MAKE MAXIMUM OUT
OF THE EQUIPMENT. I AM SURE YOU BROUGHT UP THE POINT ABOUT THE
IDLE TIME OF NEW EQUIPMENT BASED ON CURRENT DOWNTIME OF THE
EQUIPMENT WE HAVE. ADDING THE TECHNOLOGY/SOFTWARE FACTOR
WILL NOT ONLY HELP PROJECT MANAGERS TO SCHEDULE ACTIVITIES
BASED ON AVAILABILITY, BUT THIS WILL ALSO REDUCE THE IDLE TIME OF
CURRENT EQUIPMENT. THIS WILL HELP THE COMPANY TAKE MORE
PROJECTS THAN WE CURRENTLY ARE HANDLING. THE APPLICATIONS
AVAILABLE IN THE MARKET CAN ALSO BE USED FOR INTEGRATING THE
TIMELINES OF ALL PROJECT MANAGERS. THIS WILL NOT ONLY GIVE
PROJECT MANAGERS, A HIGH-LEVEL OVERVIEW OF EQUIPMENT AND
TECHNICIAN AVAILABILITY BUT ALSO PROVIDE YOU A TIMELINE ON THE
IDLENESS OF PROJECT MANAGERS, WHICH COULD BE USED TO
ACCOMMODATE IN OTHER PROJECTS. I WOULD ALSO LIKE TO HAVE THE
FIRST COME FIRST SERVED BASIS BE ACTIVE AS OF NOW WHEN THE
EQUIPMENT/TECHNICIANS ARE NOT BOOKED BY ANY PROJECT
MANAGERS.
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 6/24
I REALLY HOPE THIS SUGGESTION WOULD BE BENEFICIAL TO ALL
STAKEHOLDERS IN THE COMPANY. IF YOU WOULD LIKE TO UNDERSTAND
MORE ABOUT AVAILABLE APPLICATIONS ONLINE, I CAN CERTAINLY
PROVIDE YOU A LIST AND SET UP A MEETING TO UNDERSTAND FURTHER.
Yours faithfully, Rohith Kumar Mara
References
Benjamin K. & Robert M. (2019). Earned Green value management for Project Management:
A systematic review. Journal of Cleaner Production, 30(18), pp. 180-197. 6 RETRIEVED
FROM HTTP://EDS.A.EBSCOHOST.COM/EDS/DETAIL/DETAIL?
VID=1&SID=C50F9F20-8BBF-4360-A96B-51E2427E1DBB%40SDC-V-
SESSMGR02&BDATA=JKF1DGHUEXBLPXNOAWIMC2L0ZT1LZHMTBGL2ZQ%
3D%3D#AN=137094206&DB=BUH
Felipe S., Eric B., Pierre M., & Davy M. (2019). 7 A STEP FOR IMPROVING THE
TRANSITION BETWEEN TRADITIONAL TO AGILE PROJECT MANAGEMENT
USING A PROJECT MANAGEMENT MATURITY MODEL. JOURNAL OF
MODERN PROJECT MANAGEMENT, 7(1), PP. 102-119. 6 RETRIEVED FROM
HTTP://EDS.A.EBSCOHOST.COM/EDS/DETAIL/DETAIL?
VID=1&SID=351650AE-A958-4E12-B92C-2A4CAA8437EF%40SDC-V-
SESSMGR01&BDATA=JKF1DGHUEXBLPXNOAWIMC2L0ZT1LZHMTBGL2ZQ%
3D%3D#AN=137048666&DB=BUH
4 PINTO, J.K. (2019). Project Management: 4 ACHIEVING COMPETITIVE
ADVANTAGE (5TH ED).
Boston: Pearson
Citations (7/7) 1 Another student's paper
2 Another student's paper
3 Another student's paper
4 Another student's paper
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 7/24
Matched Text
5 Non-existent paper
6 Another student's paper
7 Another student's paper
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
"FIRST COME FIRST SERVED"
Source - Another student's paper "First Come, First Served"
Suspected Entry: 87% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE RULE "FIRST COME FIRST SERVED"
Source - Another student's paper "First Come, First Served"
Suspected Entry: 75% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
RESOURCES CHALLENGE 1 "FIRST COME FIRST SERVED"
Source - Another student's paper First come, first served 1
Suspected Entry: 64% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
FIRST COME FIRST SERVED CASE STUDY STUDENT NAME:ROHITH KUMAR MARA
Source - Another student's paper Case Study “first Come, First Served”
Suspected Entry: 76% match
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 8/24
Uploaded - FIRST COME FIRST SERVED Case Study.docx
INSTITUTION:UNIVERSITY OF CUMBERLANDS
Source - Another student's paper University of the Cumberlands
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
DESCRIBE SOME OF THE RESOURCE CONSTRAINTS THAT SUNRISE AND ITS PROJECT MANAGERS ARE FACING
Source - Another student's paper Describe some of the resource constraints that Sunrise and its project managers are facing
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
SUNRISE RESTORATION AND REMODELING IS A SMALL PRIVATELY-OWNED COMPANY
Source - Another student's paper Sunrise Restoration and Remodeling is a small privately-owned company
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IN MOST OF THE SMALL COMPANIES, THE MAJOR CONSTRAINT LIES IN THE BUDGET
Source - Another student's paper In most of the small companies, the major constraint lies in the budget
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
ON TOP OF THE BUDGET, IF THERE ARE MORE PROJECTS HANDLED AT THE SAME TIME AND RESOURCE SHARING, RESOURCES ARE ALSO A BIG CONCERN
Source - Another student's paper On top of budget, if there are more projects handled at same time and resource sharing, resources are also a big concern
Suspected Entry: 93% match
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&att… 9/24
Uploaded - FIRST COME FIRST SERVED Case Study.docx
WHILE DISCUSSING RESOURCE-CONSTRAINED BASED ON THE GIVEN TOPIC, WE CAN SEE, FROM THE OWNER'S PERSPECTIVE, THERE ARE PROJECT MANAGERS WHO ARE NOT WILLING TO WORK WITH ONE ANOTHER
Source - Another student's paper While discussing about resource constrained based on the given topic, we can see, from owner’s perspective, there are project manager’s who are not willing to work with one another
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
LIMITED TECHNICIANS AND UNAVAILABILITY OF LOW COST, EFFICIENT SUB-CONTRACTORS
Source - Another student's paper Limited technicians and unavailability of low cost, efficient sub-contractors
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IN ADDITION TO THAT, EQUIPMENT IS ALSO LIMITED
Source - Another student's paper In addition to that, equipment is also limited
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
CONSIDERING THE GIVEN EXAMPLE, THEY ONLY HAVE ONE EQUIPMENT
Source - Another student's paper Considering given example, they only have one equipment
Suspected Entry: 89% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
WAS MEANT TO AVOID MISUSES OF EQUIPMENT AND TECHNICIANS BUT IT HAS TURNED OUT IN FAVOR OF KEN, AS HE WORKS THINGS OUT CLEVERLY
Source - Another student's paper The rule “First Come First Served” was meant to avoid misuses of equipment and technicians but it has turned out in favor of Ken, as he works things out cleverly
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 10/24
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE 3 MAIN RESOURCE CONSTRAINTS INCLUDE EQUIPMENT, TECHNICIANS AND SUB- CONTRACTORS
Source - Another student's paper The 3 main resource constraints include equipment, technicians and sub-contractors
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE EQUIPMENT IS LIMITED IN NUMBER AND THE PROJECT MANAGER WHO GETS HAND FIRST ON THE EQUIPMENT ARE ENTITLED TO THAT EQUIPMENT FOR THE DURATION OF THE USE
Source - Another student's paper The equipment is limited in number and the project manager who gets hand first on the equipment are entitled to that equipment for the duration of the use
Suspected Entry: 98% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THIS LEAVES OTHER PROJECT MANAGERS IDLE FOR THE TIME BEING IF THERE IS A DEPENDENCY ON THAT EQUIPMENT
Source - Another student's paper This leaves other project managers idle for the time being if there is dependency on that equipment
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
ADDITIONALLY, FROM THE LOOKS OF CONTEXT, THERE IS NO RESERVATION POLICY WHICH MAKES IT DIFFICULT FOR PLANNING THE PROJECTS
Source - Another student's paper Additionally, from the looks of context, there is no reservation policy which makes it difficult for planning the projects
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THIS GOES THE SAME WITH TECHNICIANS
Source - Another student's paper This goes the same with technicians
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 11/24
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
TECHNICIANS ARE INTENDED TO BE A SUPPLEMENTAL HUMAN RESOURCE, WORKING IN ADDITION TO THE SUBCONTRACTOR EXPERTS
Source - Another student's paper Technicians are intended to be a supplemental human resource, working in addition to the subcontractor experts
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
SINCE THE EFFICIENT TECHNICIANS ARE LIMITED IN NUMBER, IT FACES THE SAME DIFFICULTY AS EQUIPMENT
Source - Another student's paper Since the efficient technicians are limited in number, it faces the same difficulty as equipment
Suspected Entry: 93% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
SUNRISE DOES NOT HAVE A HUGE LIST OF EFFICIENT SUB-CONTRACTORS WHO CAN BE HIRED AT LOW COSTS AND EXTRACT GOOD RESULTS
Source - Another student's paper Sunrise does not have a huge list of efficient sb- contractors who can be hired at low costs and extract good results
Suspected Entry: 67% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
HENCE RELYING ON SUB-CONTRACTORS ABILITY IS A CONSTRAINT (PINTO, J.K., 2019)
Source - Another student's paper Hence relying on sub-contractor’s ability is a constraint
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IS SUNRISE'S CURRENT METHOD OF PRIORITIZING RESOURCE ASSIGNMENTS VIABLE
Source - Another student's paper Is Sunrise's current method of prioritizing resource assignments viable
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 12/24
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
WHY OR WHY NOT
Source - Another student's paper Why or why not
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
SUNRISE'S CURRENT METHOD OF PRIORITIZING RESOURCE ASSIGNMENTS IS NOT VIABLE
Source - Another student's paper Sunrise’s current method of prioritizing resource assignments is not viable
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THEIR CURRENT PRACTICE OF FIRST COME FIRST SERVE BASIS IS NOT EFFICIENT AS PROJECT MANAGERS HAVE CANNOT PLAN THEIR ACTIVITIES IN THE FUTURE
Source - Another student's paper Their current practice of first come first serve basis is not efficient as project managers have cannot plan their activities in future
Suspected Entry: 93% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IF WE TAKE THE GIVEN EXAMPLE, DUE TO THE LIMITED NUMBER OF EQUIPMENT, TYLER COULD NOT GET THE EQUIPMENT THAT DELAYED HIS PART OF THE PROJECT FOR 3- DAYS WHILE THE EQUIPMENT IS IN USE BY KEN
Source - Another student's paper If we take the given example, due to limited number of equipments, Tyler could not get the equipment which delayed his part of the project for 3-days while the equipment is in use by Ken
Suspected Entry: 88% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THESE 3 DAYS OF IDLENESS NOT ONLY INCUR PROJECT TIME DELAY, BUT WORKERS NEED TO BE PAID, PROJECT MANAGERS NEED TO PAY
Source - Another student's paper These 3 days of idleness not only incur project time delay, but workers need to be paid, project manager need to paid
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 13/24
Suspected Entry: 93% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IF ANY FOLLOW ON ACTIVITY IS BEING PLANNED WHICH INCLUDES EXTERNAL PARTIES/VENDORS, THAT WOULD BE IN JEOPARDY
Source - Another student's paper If any follow on activity is being planned which include external parties/vendors, that would be in jeopardy
Suspected Entry: 96% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
FEES TO ACCOMMODATE IN AN UPDATED TIME/DAY SETTING WILL BE INCURRED
Source - Another student's paper Fees to accommodate in updated time/day setting will be incurred
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
ALSO, THIS WOULD FALL UNDER THE LUCK CATEGORY OF THE PROJECT MANAGER GETTING THE EQUIPMENT EVEN AFTER 3RD DAY
Source - Another student's paper Also, this would fall under luck category of the project manager getting the equipment even after 3rd day
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THIS MIGHT BE A SMALL COMPANY BUT IT DOES INCLUDE MORE THAN TWO PROJECT MANAGERS AND IT IS HIGHLY LIKELY FOR THE THIRD MANAGER TO GET HOLD OF EQUIPMENT BEFORE TYLER, WHICH WOULD BE A VERY BAD SCENARIO FOR TYLER’S PROJECT
Source - Another student's paper This might be a small company but it does include more than two project managers and it is highly likely for the third manager to get hold of equipment before Tyler, which would be a very bad scenario for Tyler’s project
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
Source - Another student's paper
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 14/24
IF THE PROJECT MANAGER’S MAIN CONCERN DRILL DOWN TO HOW TO GET HOLD OF EQUIPMENT FIRST, HIS OTHER PROJECT- RELATED ACTIVITIES WILL BE IN TROUBLE
If the project manager’s main concern drill down to HOW to get hold of equipment first, his other project related activities will be in trouble
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
FIRST COME FIRST SERVED BASES COULD HOLD GOOD IF IT HAS A RESERVATION SYSTEM
Source - Another student's paper First Come First Served bases could hold good, if it has a Reservation system
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE FIRST AVAILABLE PERSON TO RESERVE THE UNIT FOR THE FUTURE ACTIVITY SHOULD BE ALLOWED TO USE IT
Source - Another student's paper First available person to reserve the unit for future activity, should be allowed to use it
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THIS GIVES ENOUGH TIME FOR THE PROJECT MANAGER TO PLAN ACCORDINGLY
Source - Another student's paper This gives enough time for project manager to plan accordingly
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
HOW COULD TECHNOLOGY ALLEVIATE SOME OF SUNRISE'S RESOURCE MANAGEMENT ISSUES
Source - Another student's paper How could technology alleviate some of Sunrise's resource management issues
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
Source - Another student's paper
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 15/24
TECHNOLOGY HAS BEEN VERY HELPFUL IN DEALING WITH SITUATIONS LIKE THESE, AS MENTIONED IN A GIVEN CASE STUDY PERTAINING TO RESOURCE MANAGEMENT
Technology has been very helpful in dealing with situations like these, as mentioned in given case study pertaining to resource management
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
AS MENTIONED ABOVE, THE RESERVATION SYSTEM WOULD HELP THE PROJECT MANAGER EFFICIENTLY PLAN FOR THE PROJECT
Source - Another student's paper As mentioned above, the reservation system would help project manager efficiently plan for project
Suspected Entry: 85% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IF ALL PROJECT MANAGER'S PLANS ARE HIGHLIGHTED UNDER ONE APPLICATION, IT WOULD SHOW ALL CONFLICTING ACTIVITIES OR RESOURCE ALLOCATION BEFOREHAND GIVING THE PROJECT MANAGER ENOUGH TIME TO NEGOTIATE OR LOOKOUT FOR ALTERNATIVES OR PROVIDE TIMELINE ESTIMATES ACCORDINGLY (FELIPE, ERIC, PIERRE, & DAVY, 2019)
Source - Another student's paper If all project manger’s plans are highlighted under one application, it would show all conflicting activities or resource allocation beforehand giving project manager enough time to negotiate or look out for alternatives or provide timeline estimates accordingly
Suspected Entry: 94% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
ALTHOUGH NOT ALL PROJECT MANAGERS WOULD WANT THEIR PLANS TO BE DISCLOSED TO ONE ANOTHER, TECHNOLOGY CAN HELP KEEP THE REST OF THE PLAN HIDDEN FROM OTHER PROJECT MANAGERS AND ONLY HIGHLIGHT THE CONFLICTING PARTS
Source - Another student's paper Although not all project managers would want their plans to be disclosed to one another, but technology can help keep rest of the plan hidden from other project manager and only highlight the conflicting parts
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
Source - Another student's paper
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 16/24
HERE IS WHERE PROJECT MANAGEMENT RELATED SOFTWARE CAN BE REALLY HELPFUL TO UNDERSTAND THE AVAILABILITY OF THE GIVEN RESOURCE IN FUTURE TIME
Here is where project management related software can be really helpful to understand availability of given resource in future time
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
WHY OR WHY NOT
Source - Another student's paper Why or why not
Suspected Entry: 98% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
TYLER'S SUGGESTIONS ARE BASED ON HIS CURRENT PROJECT AND THAT IS NOT ENTIRELY
Source - Another student's paper Tyler’s suggestions are based on his current project and that is not in entirely
Suspected Entry: 96% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
HENCE, HIS SUGGESTIONS TO ADD TECHNICIANS AND PROCURE MORE EQUIPMENT ARE NOT GOING TO SOLVE THE OVERALL PROBLEM
Source - Another student's paper Hence, his suggestions to add technicians and procure more equipment is not going to solve overall problem
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IT MIGHT SOLVE HIS PROBLEM PERTAINING TO HIS PROJECT, BUT IT WILL CREATE A PROBLEM FOR HIS OWNER AS RIGHTLY MENTIONED, IDLENESS OF EQUIPMENT
Source - Another student's paper It might solve his problem pertaining to his project, but it will create problem for his owner as rightly mentioned, idleness of equipment
Suspected Entry: 89% match
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 17/24
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE MAIN PROBLEM IS WITH EQUIPMENT NOT AVAILABLE AT A GIVEN TIME
Source - Another student's paper The main problem is with equipment not available on given time
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
TIME IS THE PROBLEM
Source - Another student's paper Time is the problem
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
HENCE, A SOLUTION SHOULD COME OUT DEALING WITH HOW THE EQUIPMENT WOULD BE AVAILABLE EQUALLY TO ALL PROJECT MANAGERS AND ON TIME
Source - Another student's paper Hence, a solution should come out dealing with how the equipment would be available equally to all project managers and on time
Suspected Entry: 96% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
ADDING NEW EQUIPMENT WOULD INCREASE IDLE TIME AND THAT IDLE TIME EATS UP THE BUDGET FROM THE COMPANY, WHICH NO COMPANY WANTS AND IS NOT EFFICIENT
Source - Another student's paper Adding new equipment would increase the idle time and those idle time eats up budget from company, which no company wants and is not efficient
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
AS RIGHTLY STATED, THE ISSUE HAS OCCURRED FOR JUST ONE PROJECT MANAGER OUT OF MANY, SO IT IS MORE SUBJECTIVE THAN OBJECTIVE
Source - Another student's paper As rightly stated, the issue has occurred for just one project manager out of many, so it is more subjective than objective
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 18/24
Suspected Entry: 92% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE PROJECT MANAGER NEEDS TO BE CO- OPERATIVE AND WORK HOW OTHER PROJECT MANAGERS WOULD, WHO ARE NOT COMPLAINING (BENJAMIN K
Source - Another student's paper The project manager needs to be co-operative and work how other project managers would, who are not complaining
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
PUT YOURSELF IN TYLER 'S POSITION AND CREATE A ONE-PAGE PROPOSAL FOR THE SUNRISE OWNER
Source - Another student's paper Put yourself in Tyler 's position and create a one-page proposal for the Sunrise owner
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
OUTLINE THE CURRENT ISSUES BRIEFLY WITH CORRESPONDING DETAILED RECOMMENDATIONS FOR ACTION
Source - Another student's paper Outline the current issues briefly with corresponding detailed recommendations for action
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
YOUR ACTIONABLE IMPROVEMENTS MUST BE SPECIFIC, ADDRESS YOUR (TYLER'S) CONCERNS, ALIGN WITH THE OWNER'S PRIORITIES, AND OUTLINE THE BENEFITS OF YOUR SOLUTIONS IN A PERSUASIVE MANNER
Source - Another student's paper Your actionable improvements must be specific, address your (Tyler's) concerns, align with the owner's priorities, and outline the benefits of your solutions in a persuasive manner
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
PROPOSAL FOR ONGOING IDENTIFIED ISSUES
Source - Another student's paper PROPOSAL FOR ONGOING IDENTIFIED ISSUES
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 19/24
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
TO, OWNER, SUNRISE RECONSTRUCTION AND REMODELING, ISSUE DESCRIPTION
Source - Another student's paper To, Owner, Sunrise Reconstruction and Remodeling, Issue Description
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
UNAVAILABILITY OF RESOURCES ON TIME LEADING TO FAILURE OF DELIVERING RESULTS AND UNSATISFACTORY CUSTOMER REMARKS
Source - Another student's paper Unavailability of resources on time – leading to failure of delivering results and unsatisfactory customer remarks
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
RESOURCES ARE NOT ALLOCATED IN ADVANCE AND DUE TO THE FIRST COME FIRST SERVED POLICY, IT IS ONLY AT THE TIME OF NEED, WE REALIZE THAT EQUIPMENT IS NOT AVAILABLE
Source - Another student's paper Resources are not allocated in advance and due to the first come first served policy, it is only at the time of need, we realize that equipment is not available
Suspected Entry: 82% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE SAME GOES FOR THE TECHNICIANS
Source - Another student's paper Same goes with the technicians
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
HIRING NEW TECHNICIANS AND PROCURING NEW EQUIPMENT WILL ONLY INCUR ADDITIONAL CHARGES DURING THEIR DOWNTIME AS RIGHTLY OUTLINED BY YOU
Source - Another student's paper Hiring new technicians and procuring new equipment will only incur additional charges during their downtime as rightly outlined by you
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 20/24
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
I DO AGREE WITH THAT STATEMENT AND I GOT AN OPPORTUNITY TO WIDEN THE REQUIREMENT
Source - Another student's paper I do agree with that statement and I got an opportunity to widen the requirement
Suspected Entry: 93% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
BASED ON MY RESEARCH, I BELIEVE MAKING USE OF FREE TO VERY CHEAP COMPUTER APPLICATIONS WOULD HELP US RESOLVE THIS ISSUE
Source - Another student's paper Based on my research, I believe making use of free to very cheap computer application would help us resolve this issue
Suspected Entry: 95% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
MY COLLEAGUE WORKING IN ANOTHER COMPANY MENTIONS HOW THEY USE RESERVATION SYSTEMS BASED ON PROJECT COMMITMENTS AND THAT HAS BEEN WORKING OUT PRETTY WELL
Source - Another student's paper My colleague working in another company mentions how they use reservation system based on project commitments and that has been working out pretty well
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
OUR FIRST COME FIRST SERVED BASIS CAN PROVE TO BE MORE ADVANTAGEOUS IF USED FOR THE RESERVATION
Source - Another student's paper Our First Come First Served basis can prove to be more advantageous if used for reservation
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE FIRST PERSON TO RESERVE IT CAN RESERVE IT FOR HIS PROJECTS
Source - Another student's paper The first person to reserve it can reserve it for his projects
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 21/24
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THIS WILL GIVE ENOUGH TIME FOR OTHER PROJECT MANAGERS TO ALIGN THAT SPECIFIC ACTIVITY TO MAKE MAXIMUM OUT OF THE EQUIPMENT
Source - Another student's paper This will give enough time for other project managers to align that specific activity to make maximum out of the equipment
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
I AM SURE YOU BROUGHT UP THE POINT ABOUT THE IDLE TIME OF NEW EQUIPMENT BASED ON CURRENT DOWNTIME OF THE EQUIPMENT WE HAVE
Source - Another student's paper I am sure you brought up the point about idle time of new equipment based on current downtime of the equipment we have
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
ADDING THE TECHNOLOGY/SOFTWARE FACTOR WILL NOT ONLY HELP PROJECT MANAGERS TO SCHEDULE ACTIVITIES BASED ON AVAILABILITY, BUT THIS WILL ALSO REDUCE THE IDLE TIME OF CURRENT EQUIPMENT
Source - Another student's paper Adding the technology/software factor will not only help project managers to schedule activities based on availability, but this will also reduce the idle time of current equipment
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THIS WILL HELP THE COMPANY TAKE MORE PROJECTS THAN WE CURRENTLY ARE HANDLING
Source - Another student's paper This will help company take more projects than we currently are handling
Suspected Entry: 100% match
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 22/24
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THE APPLICATIONS AVAILABLE IN THE MARKET CAN ALSO BE USED FOR INTEGRATING THE TIMELINES OF ALL PROJECT MANAGERS
Source - Another student's paper The applications available in market, can also be used for integrating timelines of all project managers
Suspected Entry: 99% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
THIS WILL NOT ONLY GIVE PROJECT MANAGERS, A HIGH-LEVEL OVERVIEW OF EQUIPMENT AND TECHNICIAN AVAILABILITY BUT ALSO PROVIDE YOU A TIMELINE ON THE IDLENESS OF PROJECT MANAGERS, WHICH COULD BE USED TO ACCOMMODATE IN OTHER PROJECTS
Source - Another student's paper This will not only give project managers, a high-level overview of equipment and technician availability, but also provide you timeline on idleness of project managers, which could be used to accommodate in other projects
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
I WOULD ALSO LIKE TO HAVE THE FIRST COME FIRST SERVED BASIS BE ACTIVE AS OF NOW WHEN THE EQUIPMENT/TECHNICIANS ARE NOT BOOKED BY ANY PROJECT MANAGERS
Source - Another student's paper I would also like to have the First Come First Served basis be active as of now, when the equipment/technicians are not booked by any project managers
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
I REALLY HOPE THIS SUGGESTION WOULD BE BENEFICIAL TO ALL STAKEHOLDERS IN THE COMPANY
Source - Another student's paper I really hope this suggestion would be beneficial to all stakeholders in the company
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
IF YOU WOULD LIKE TO UNDERSTAND MORE ABOUT AVAILABLE APPLICATIONS ONLINE, I
Source - Another student's paper If you would like to understand more about available applications online, I can certainly provide you a list and set up a meeting to understand further
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 23/24
CAN CERTAINLY PROVIDE YOU A LIST AND SET UP A MEETING TO UNDERSTAND FURTHER
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
PINTO, J.K
Source - Another student's paper Pinto, J.K
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
ACHIEVING COMPETITIVE ADVANTAGE (5TH ED)
Source - Another student's paper Achieving Competitive Advantage (5th ed)
Suspected Entry: 100% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
WOULD TYLER'S SUGGESTION TO HIRE ADDITIONAL TECHNICIANS AND PURCHASE MORE EQUIPMENT TO SOLVE THE RESOURCE PROBLEMS AT SUNRISE
Source - Non-existent paper Would Tyler’s suggestion to hire additional technicians and purchase more equipment to solve the resource problems at Sunrise
Suspected Entry: 67% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
RETRIEVED FROM HTTP://EDS.A.EBSCOHOST.COM/EDS/DETAIL/DE TAIL?VID=1&SID=C50F9F20-8BBF-4360-A96B- 51E2427E1DBB%40SDC-V- SESSMGR02&BDATA=JKF1DGHUEXBLPXNOAWI MC2L0ZT1LZHMTBGL2ZQ%3D%3D#AN=13709420 6&DB=BUH
Source - Another student's paper Retrieved from http://eds.a.ebscohost.com/eds/detail/detail? vid=1&sid=3cc45cc6-67ad-4f22-9ffa- ab2080a17183%40sdc-v- sessmgr01&bdata=JkF1dGhUeXBlPXNoaWImc2l0ZT 1lZHMtbGl2ZQ%3d%3d#AN=116839989&db=edb
Suspected Entry: 71% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
Source - Another student's paper
2/12/2020 SafeAssign Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_114256_1&paperId=2514932474&&a… 24/24
RETRIEVED FROM HTTP://EDS.A.EBSCOHOST.COM/EDS/DETAIL/DE TAIL?VID=1&SID=351650AE-A958-4E12-B92C- 2A4CAA8437EF%40SDC-V- SESSMGR01&BDATA=JKF1DGHUEXBLPXNOAWI MC2L0ZT1LZHMTBGL2ZQ%3D%3D#AN=13704866 6&DB=BUH
Retrieved from http://eds.a.ebscohost.com/eds/detail/detail? vid=1&sid=3cc45cc6-67ad-4f22-9ffa- ab2080a17183%40sdc-v- sessmgr01&bdata=JkF1dGhUeXBlPXNoaWImc2l0ZT 1lZHMtbGl2ZQ%3d%3d#AN=116839989&db=edb
Suspected Entry: 93% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
A STEP FOR IMPROVING THE TRANSITION BETWEEN TRADITIONAL TO AGILE PROJECT MANAGEMENT USING A PROJECT MANAGEMENT MATURITY MODEL
Source - Another student's paper A Step for Improving THE TRANSITION BETWEEN TRADITIONAL PROJECT MANAGEMENT TO AGILE PROJECT MANAGEMENT Using a Project Management Maturity Model
Suspected Entry: 78% match
Uploaded - FIRST COME FIRST SERVED Case Study.docx
JOURNAL OF MODERN PROJECT MANAGEMENT, 7(1), PP
Source - Another student's paper Journal of Modern Project Management, 7(3), 1–29