REQUIREMENTS MANAGEMENT PLAN
Project Title ___________________________ Date: ________________________
Collection
|
|
Analysis
|
|
Categories
|
|
**Documentation (my part)
|
|
**Prioritization( my part)
|
|
Page 1 of 2
REQUIREMENTS MANAGEMENT PLAN
**Metrics( my part)
|
|
Traceability Structure
|
|
Tracking
|
|
Reporting
|
|
Validation
|
|
Configuration Management
|
|
Page 2 of 2
Elements of the Requirements Management Plan
|
Requirements collection |
Describe how requirements will be collected. Consider techniques such as brainstorming, interviewing, observation, etc. |
|
Requirements analysis |
Describe how requirements will be analyzed for prioritization, categorization , impact to the product and project approach |
|
Requirements categories |
Identify categories for requirements, such as business, stakeholder, quality etc. |
|
Requirements documentation |
Define how requirements will be documented. The format for requirements documentation may range from a simple spreadsheet, to more elaborate forms containing detailed descriptions and attachments. |
|
Requirements prioritization |
Identify the prioritization approach to requirements. Certain requirements will be non-negotiable, such as those that are regulatory, or those that are needed to comply with the organization’s policies or infrastructure. Other requirements may be nice to have, but not necessary for functionality. |
|
Requirements metrics |
Document the metrics that requirements will be measured against. For example, if the requirement is that the product must be able to support 150 lbs., the metric may be that it is designed to support 120% (180 lbs.) and that any design and engineering decisions that cause the product to go below the 120% need approval by the customer. |
|
Requirements traceability structure |
Identify the information that will be used to link requirements from their origin to the deliverables that satisfy them. |
|
Requirements tracking |
Describe how often and what techniques will be used to track progress on requirements. |
|
Requirements reporting |
Describe how reporting on requirements will be conducted and indicate the frequency. |
|
Requirements validation |
Identify the various methods that will be used to validate requirements, such as inspection, audits, demonstration, testing, and so forth. |
|
Requirements configuration management |
Describe the configuration management system that will be used to control requirements, documentation, the change management process, and the authorization levels needed to approve changes. |