Project Management

profilekishu2993
Requirement_Final.docx

Title:

Analyzing the project delay causes and how global construction companies are coping with it

Contents:

1. Cover Page

2. Abstract

3. Introduction – Actual objective introduction regarding project delay causes.

4. Project Related Delays – Discuss below phases with clear description of each factor and their corresponding examples (specific examples for each issue).

a. Planning Phase

· Scope Change

· Design Errors

· Complexity

b. Build Phase

· Contracting

· Procurement

c. Final Phase

· Post Execution

5. Construction Project Related Delays – An overview on construction project related delays and cover the topics below with clear description of each delay cause, their corresponding examples again (specific examples for each issue) and how the global companies are dealing with the delays.

a. Resources Related

· Owner Related Delays

· Consultant Related Delays

· Contractor Related Delays

· Material Related Delays

· Labor and Equipment Related Delays

b. Project Related

c. External Factor Related

6. Conclusion

7. References

Notes:

References available

1. Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research, 5(1), 49-55. doi:10.1016/j.jare.2012.11.005. Retrieved on 01/26/2019

2. Ahmed, Twana. (2015). Delay in Construction Project, 14-15. Retrieved on 01/26/2019

3. Five Causes of Project Delay and Cost Overrun, and Their Mitigation Measures. (n.d.). Retrieved from https://www.linkedin.com/pulse/five-causes-project-delay-cost-overrun-mitigation-measures-buys on 01/26/2019

We need 15 pages of a document with APA formatted references and in text citations.

12 font-size, 1” margins, double-spaced, including figures, tables, etc.

APA formatted

Minimum six (6) sources - at least four (4) from peer reviewed journals.ss