“smart rat trap” report
SYSTEMS ENGINEERING (CSE-401)
//Report writing guidelines
Title Page //its template is provided on last page
Declaration
Acknowledgment
Abstract
List of contents
List of Figured
List of Tables
Chapter no. 1
1.1 Introduction
1.2 Problem Statement
1.3 Proposed Solution
1.4 Scope of Project // statement describing where project can be implemented.
Chapter no. 2
2.1 System Methodology
2.2 Software Process Model
2.3 Roles and Responsibilities // sample table is shown below
Student
Name
Role Responsibilities
A Project Manager
B Design Engineer
2.4 Tools and Technique // List software and Hardware required to build project
Chapter no. 3
3.1 Project Management Plan
3.2 List of tasks // WBS of the project
3.3 Gantt Chart //Use online website for designing of Gantt chart
3.4 Develop Project design using system decomposition // level 0, level 1
Chapter no. 4
4.1 Requirement Specification
4.2 Functional Requirements
4.3 Non Functional Requirements
4.4 Behavior Modeling // use online website for designing of diagram
4.4.1 State Diagram
4.4.2 Flowchart Diagram
4.4.3 Dataflow Diagram
4.4.4 Entity Relationship Diagram
4.4.5 Use case Diagram
4.4.6 Class Diagram
4.4.7 Activity Diagram
4.5 System Architecture
4.6 Circuit Diagram
4.7 User Interface Design //In which form end product will go in customer hands
Chapter no. 5
5.1 Testing
5.2 Test Plan
Name Responsible for
Student x Unit Testing
Student y Requirements Testing
5.3 Requirements Testing
5.4 User Testing Stage
5.5 Development of Testing Stage //Specify test cases to be tested
Test Case
ID
Requirement
Number
Input Expected Output
DP_1 FR1 Press button Turn on System
DP_2 NF1 Response System will turn on within 2 sec.
5.6 A Matrix Test //It should be in Tabular form
Chapter no. 6
6.1 Conclusion
6.2 Future Work
References
Title of Project
Systems Engineering (CSE-401)
BSc.in Computer Engineering
Yanbu University College
Student Name ID
Supervised by:
Engr. Uzma Azeem