Renovation at Neuberger Hall
Wed, Oct 24, 2018
In this class, we were toured the renovation at Neuberger hall. Before entering the building, PPE was provided at the construction site. The students were wearing safety glasses, hard hat, safety vest. First, we were touring the site in two separate groups. the tour last approximately for one hour, from 10:30 to 11:30. The professor plan to meet in the breezeway between Neuberger hall and SMSU. There was an engineer instructor that were touring the students. His name was Steve. There were 5 floors in the building and 2 elevators. The 5th floor was only for the storages, not much going on, there is also a fire department in the 5th floor. 4th floor has a 4 big skylights. The 3rd floor has a fire tabs, rebuilt new skylight, and also we can look the skylight from this floor. It also has the language department. On the second floor, there are 5 general classrooms, new floor covering, lights, conference room, his office was in this floor, student launch art department in the middle, math lab, painting classes, drawing classes, 3 court classes, dark room for photography memory. The first floor going to be for the student’s success, office register, finance, OIT health move from smith building, concrete to glass brodway facing, staircase. The basement has a fire water, staircase, OIT department, OIT class drop in class, AV systems, math lab 85 seat, electronic room, left tunnel to smith building.