Ledger sheets

profilembibey
QuantitySheet6-3.xls

Sheet1

QUANTITY SPREADSHEET
Sheet No. 6-3
Project: Date:
Estimator: Checked:
Footing Forms Concrete
Exterior (lf) Interior (lf)
Starting in lower-left corner and progressing counterclockwise Starting in lower-left corner and progressing counterclockwise A* lf
B lf
C lf
D lf
E lf
F lf
G lf
H lf
I lf
J lf
K lf
L lf
M lf
N† lf
O lf
P lf
Q lf
R lf
S lf
T lf
U lf
Footing length 0 lf
Concrete volume 0.00 cu ft
Columns 22.29 cu ft
Total volume 22.29 cu ft
Total volume 0.83 cu yd
Total volume with waste 0.84 cu yd
Concrete - unit cost cu yd
Concrete - total cost $0.00
Subtotal 0 Subtotal 0 Reinforcing Steel
Total Footing Form 0 lf Rebar 0 lf
*Starting with footing along left side of building and progressing counterclockwise Ó 2008 American Technical Publishers, Inc. All rights reserved.
†Add 2 front columns and 1 side column