ICT STRATEGIC PLAN QPRC

ICT STRATEGIC PLAN / i

FOREWORD ICT is an integral part of our everyday personal and professional lives. We depend on technology to interact or transact with individuals, government or business; communicate with those bodies; or search for information. The rapid and relentless evolution of ICT environments present real challenges to QPRC – as a disruptor and enabler. We need to ensure we are contemporary in our use of technology, secure in our platforms and check we don’t ‘over invest or underutilise’.

It is clear that we need to be more connected, more often, to and from more locations, than ever before. At the same time, we find ourselves at the crux of the digital revolution which sees customers placing higher demands on easy access to relevant information and for their “voice” to be heard via the channel of their choice.

Looking through the rear-vision mirror, ICT strategies of the past have focussed purely on technology – systems and gadgets. However, we now have an organisation and community with higher levels of technological literacy and demands for digitalism.

We have taken a future-focussed approach identifying the People, Process and Technological elements to ensure sustainable solutions to meet

customers’ expectation and to position our organisation to transform.

Our ICT Strategic Plan will guide the investment and actions to design, develop and deliver services, automate existing services, and to more effectively interact and transact with stakeholders.

The ICT Strategic Plan will help shape Council’s Resourcing Strategy, guiding workforce and financial decisions.

I’d like to think our approach to enabling services and transactions will be ‘digital by default’.

Peter Tegart

Chief Executive Officer

ICT STRATEGIC PLAN / ii

EXECUTIVE SUMMARY ICT is an increasingly important driver of continued organisational transformation. Therefore, the ICT Strategic Plan charts the path forward not only for QPRC’s Digital Branch, but also for the organisation as a whole. Four key strategies underpin this plan:

Optimised Organisation: Develop an ICT Workforce Management Plan, champion meaningful change, and implement modern ICT service management and business- oriented ICT security to enhance efficiency, effectiveness, and optimal utilisation of ICT systems and services.

Digitally Enabled Workforce: Enhance digital dexterity, optimise the Enterprise Resource Planning (ERP) system, improve remote working, and drive a unified approach to ICT architecture to enable more effective use of ICT, and greater collaboration and knowledge sharing across the organisation.

Citizen-centric Services: Digitally enabled services, Smart City initiatives, user-centric design, co-design with citizens, and regular feedback and insights, all contribute towards understanding and translating the community’s needs into targeted, effective service delivery. QPRC aims to align and integrate ICT and customer strategy through the lens of people, process, and technology.

Open and Connected: Build and leverage external partnerships, utilise business intelligence to extract value from data, and implement a considered benefits management approach to ICT, to enable the optimal use of QPRC’s resources to realise organisational goals.

The four core strategies were developed through analysis of business and community requirements, as well as general factors driving ICT change. They form an important part of QPRC’s blueprint to capitalise on the momentum gained from the Council’s recently completed transition phase. The successful execution of these strategies will help the Council move forward with confidence through the transformation phase, and achieve sustained, long-term success.

At its core, the ICT Strategic Plan reaffirms the Council’s citizen- centric vision to ‘Transact through Digital, Interact through People’ and its commitment to facing the challenges of a rapidly changing world through community engagement, responsiveness to change, and innovative, community-focused, technology solutions that address citizens’ needs in the twenty-first century. The ICT Strategic Plan will be reviewed annually, to ensure that it continues to meet the expectations of key stakeholders and the wider community.

This plan is more than just a ‘technology plan’; it is a significant strategic planning artefact to be owned and driven by the entire organisation, in order to ensure that the community’s current and future needs are supported through a whole-of-capability approach to ICT that encompasses people, process and technology.

The ICT Strategic Plan serves as a roadmap for the digital enablement of council operations, community services and local government initiatives, thereby enabling the Council to fulfil its commitment to deploying new technology and smart thinking, and delivering real benefits to the community in jobs, education, innovation, commerce, and liveability.

1

2

3 4

ICT STRATEGIC PLAN / 1

ASPIRATIONS AND VALUES Our aspirations and values provide focal points that help align everyone to the same purpose. Values determine important characteristics in the way we work together.

Our Aspirations Our aspirations for QPRC’s ICT Strategy are to positively change the way Council transacts and interacts with our staff, ratepayers, visitors and businesses, and strive to develop and support a reliable and secure digital and communications platform designed to provide smart and authoritative self-service and mobile services to staff, residents and businesses in the LGA.

Our Values In line with the broader organisation, the values of ICT management are innovation, continuous improvement, integrity and respect. As a team, we recognise that digital/technology holds the key to initiating and delivering innovation and improvements. We are committed to QPRC’s value statement our reputation matters.

ICT STRATEGIC PLAN / 2

OVERVIEW Context The transition phase, a major and complex exercise, ensured the merger of the Queanbeyan City and Palerang Councils into the entity known as QPRC. The transition resulted in extensive changes to QPRC’s organisational structure, processes and systems, which have had a significant impact on how the Digital Branch supports the rapidly changing needs of the organisation. The Digital team will play an increasingly pivotal role in the next phase of QPRC’s transformation, facilitating the optimisation and further evolution of the organisation.

Following the transition phase, which capitalised on the opportunity to rationalise and improve systems and implement important systems such as Enterprise Resource Planning (ERP), the Digital Branch now seeks to realise the full benefits of these business systems.

Like any organisation, QPRC needs to respond to changes in its external environment now and into the future. Technological advances will continue to support the increasing shift to digital service delivery and automation, and more sophisticated, better integrated systems. The rapid uptake of digital services and innovative technologies is also driving increased user expectations as the community demands a better customer experience, commonly characterised by digital/online services. Government

policies, directions and investments are also driving changes in the ICT environment. Commonwealth, state and local government continue to make investments in digital workplace policies and there are opportunities for QPRC to partner with other organisations to promote innovation in ICT service delivery. QPRC’s ongoing partnerships with ServiceNSW and the ACT Government for digital solutions and Smart City initiatives demonstrate this intent.

As we enter the next phase of our organisational journey, QPRC must not lose sight of its core role of providing services to its staff and the community. Some of these services will continue to evolve – for example, digital and online services. However, the actual services and needs of the community will remain largely stable. The most important aspect of the ICT strategic plan is, perhaps, the need to provide ICT products and services as effectively and efficiently as possible to maintain QRPC’s role in supporting the community, development needs, local economy, infrastructure, and natural environment.

The ICT Strategic Plan is not a ‘technology plan’, but a key strategic planning artefact that needs to be owned and driven by all parts of the organisation to ensure that their current and future needs are supported through a whole-of-capability approach to ICT which encompasses people, process and technology.

ICT STRATEGIC PLAN / 3

Drivers for Digital Government QPRC is committed to leveraging new technology and smart thinking to deliver real benefits for our community, in jobs, education, innovation, commerce, and liveability. The following operations, services and initiatives play a key role in achieving this commitment.

Branch Operations

Data Driven Decision Making

Transparency

Digital Transactions

Digitally Integrated Services

Connected Community

Smart Cities

Economic Development

Innovation

ICT STRATEGIC PLAN / 4

What does success look like? A digital region provides major benefits for our staff, residents, visitors, and businesses. Digital inclusion increases social and civic engagement, improves opportunities for business to succeed and scale, facilitates community development, and contributes to the creation of employment opportunities and the economic health of the region.

In alignment with QPRC’s Digital Economy and Smart Community Strategy, we are committed to harnessing the power of data, leveraging the convenience of online services, increasing our local, national and global connectivity, and strengthening our economy through key digital economy objectives such as leveraging digital/remote/flexible working and catalysing city/town transformations.

Continuing to transform our services so that they best suit a community that is learning to engage online will lead to a more efficient local government, capable of responding to the needs of our communities to transact how and when they want. It will enable the Council to respond more effectively to people’s needs.

Our program of service reviews and our partnership with Service NSW enables us to streamline and digitise processes, affording the opportunity to enhance the customer experience by expanding and improving online services such as customer requests, development applications, and certificate requests.

The concept of ‘Transact through Digital, Interact through People’ will form the foundation for identifying, designing, and implementing digital systems that drive organisation efficiency and allow resources to be redeployed to front line community services.

To ensure that a stable, reliable and business- oriented service is maintained now and into the future, a direct focus will be placed on delivering technologically progressive, secure and scalable networks, systems and applications.

Being better connected will enable greater participation of our communities in decision making that influences the kind of region where they want to live and work.

Improving digital infrastructure through Smart City initiatives such as publicly accessible Wi-Fi will connect our communities and provide an environment where creativity and commerce can grow. These improvements will provide access to data that will inform longer-term planning and policy decisions.

In recent years there has been increasing recognition of the importance of smart hub incubators. QPRC’s CBD Transformation Strategy compliments the ICT strategy in seeking to foster a culture of supporting innovation, with particular focus on supporting entrepreneurship in the start-up sector.

Council will also foster a culture of supporting innovation internally, becoming a digitally enabled workplace that offers flexible working arrangements, nurtures its employees to upskill for the future and attracts and retains the top talent. QPRC will collaborate with business, government, academia, education providers and advocacy groups to actively participate in realising the digital future of the region.

ICT STRATEGIC PLAN / 5

Strategy Map This strategy map provides an overview of the four key strategies that underpin this ICT Strategic Plan and the underlying objectives that will enable each strategy to be realised. Each objective is linked to one or more of the three components that collectively make up QPRC’s ICT capability: people, process and technology.

1 Optimised Organisation

2 Digitally Enabled Workforce

3 Citizen-centric Services

4 Open and Connected

ICT WORKFORCE PLAN

ENHANCED DIGITAL DEXTERITY

CO-DESIGN AND COLLABORATION

BUILD AND LEVERAGE EXTERNAL PARTNERSHIPS

COMMITMENT TO ORGANISATIONAL EVOLUTION

OPTIMISATION OF THE ERP SYSTEM

COMMUNICATION (LIVE STREAM + YOUR VOICE)

BENEFITS MANAGEMENT APPROACH

MODERN ICT SERVICE MANAGEMENT

REMOTE WORKING WITH SEAMLESS USER EXPERIENCE

DIGITALLY ENABLED SERVICES, SMART CITIES AND IOT

BUSINESS INTELLIGENCE AND DATA ANALYTICS

BUSINESS-ORIENTED ICT SECURITY

UNIFIED TECHNOLOGY PLATFORM

P E O P P R O C

P R O C T E C H T E C H

P E O P

T E C H

T E C H

P R O C

P E O P

P R O C

T E C H

P E O P P E O P P E O P

T E C H

LEGEND: P e o p l e P r o c e s s T e c h n o l o g y

P E O P P R O C

T E C H

ICT STRATEGIC PLAN / 6

STRATEGY 1: Optimised Organisation People Objective 1.1: ICT Workforce Management Plan Develop an ICT Workforce Management Plan that focuses on the sourcing, retention and attraction of ICT staff. Develop an ICT Workforce Management Plan that promotes QPRC as an employer of choice and promotes cross-skilling, flexible working and succession planning to reduce over-reliance on individuals and promote mobility, and a shared culture and operating model across locations.

Objective 1.2 Commitment to Organisational Evolution Build on the commitment to champion change within ICT and across the Council, for organisational evolution. The Digital Branch will champion change to develop and implement improvement initiatives. Digital staff will actively advocate for the business and proactively engage stakeholders, identifying change champions to promote the effective use of ICT across the business and promoting ICT as a key partner in developing measurable business outcomes.

Process Objective 1.3 Modern ICT Service Management Implement modern ICT service management tools and approaches to deliver and report on ICT services. QPRC will implement a modern approach to ICT service management that provides demonstrable improvements in the delivery and reporting of ICT services. This includes improved monitoring, management and reporting, improved performance, capability building to enhance proactive analysis, issue management, configuration management, and developing contemporary policy and directives to improve risk management.

Technology Objective 1.4 Business-oriented ICT Security Ensure an appropriate balance between ICT security, performance and convenience. QPRC will continue to maintain the integrity of its system through robust security assessments, penetration testing regimes, ongoing refinement of its network layer protection, and identity and access management systems. Security controls, however, will be balanced against the need to maintain performance and convenience. Restrictive policies and controls will only be applied when there is a genuine need.

ICT STRATEGIC PLAN / 7

Strategy 2: Digitally Enabled Workforce People Objective 2.1 Enhanced Digital Dexterity Build user maturity in the effective use of ICT through ongoing learning and development. QPRC will continue to support its people by enabling users to resolve their own ICT issues, where possible, and make better use of existing ICT services and products. This will be achieved by building on existing learning and development products, including eLearning.

Through existing and new internal user groups, QPRC seeks to develop and maintain a knowledge base (KB) for self-help services, enabling the Digital team to focus on more complex technical solutions.

Ongoing service or process reviews across the organisation will, in some cases, result in reconfiguring systems to enable staff to work in more efficient ways.

Process Objective 2.2 Optimisation of the ERP System Optimise integrated Enterprise Resource Planning (ERP) system. The Digital Branch will engage business units to facilitate process review in order to effect process redesign and optimise the ERP system. This system supports community engagement, development and regulatory services, asset and works management, HR management and corporate services..

Technology Objective 2.3: Remote Working with Seamless User Experience. Improve remote working and support more flexible, activity-based working arrangements. The Digital Branch will serve as an enabler for remote working through the use of mobile technology, and strive to achieve a seamless user experience, ensuring that staff can work across Council locations, business areas, and remotely. The Digital Branch will also explore opportunities to trial and implement activity-based working (noting that activity-based working is a whole-of-business change that encompasses technology, culture and process).

Objective 2.4: Unified Technology Platform Drive a common approach to ICT architecture across all locations and functions. The Digital Branch will continue to consider and implement a unified approach to ICT architecture, bringing linkages where required through solutions such as API’s, considering each on their merit and their ability to integrate seamlessly with existing systems, in order to shape, enhance, and harmonise QPRC’s network, systems, applications, security, Cloud strategy and Data Centre strategy.

ICT STRATEGIC PLAN / 8

STRATEGY 3: Citizen-centric Services

People Objective 3.1 Co-design and Collaboration Promote the voice of the community in ICT products and services through co-design and collaboration. QPRC will identify and define the needs of the community. In designing and implementing ICT products and services, QPRC will embed user- centred design practices into its digital projects and collaborate with citizens through co-design. This includes, but is not limited to, user involvement in problem definition and solution design, and piloting initiatives with interested community members.

Process Objective 3.2 Communication (Livestream + Your Voice) Engage the community and collect their input and insights regularly, through services such as livestream and Your Voice. The Council will engage with the community on relevant issues in a two-way conversation, in alignment with QPRC’s Community Engagement and Participation Plan, to determine how digital services can enable community outcomes. QPRC will use suitable tools from the Your Voice website to engage with the community, using the Community Engagement Toolkit as a guide, and deploy a variety of methods to engage with and inform the community about the Council’s work, including social media, website, newsletters, media releases, live-streaming of Council meetings, etc.

Technology Objective 3.3 Digitally Enabled Services, Smart Cities and IoT Utilise digitally enabled services, Smart City initiatives and the ‘Internet of Things (IoT) to meet community expectations. QPRC will endeavour to capitalise on the investment priorities outlined by state, territory and commonwealth government partners, while continuing its ‘digital-by-default’ approach to services. The Council is committed to promoting more efficient and effective practices, while enhancing citizens’ access to digital enabled services, Smart City initiatives and IoT, and catering to diverse community needs.

ICT STRATEGIC PLAN / 9

STRATEGY 4: Open and Connected People Objective 4.1 Build and Leverage External Partnerships Build and leverage external partnerships to share, scale up and reuse common ICT capabilities and needs. QPRC will identify, develop and pursue opportunities to partner with local, state, territory and commonwealth government entities to offer shared services and deploy joint initiatives such as the Regional Digital Connectivity program. We will also leverage our relationship with Service NSW to deploy online portals and apps, leverage Smart City technologies, and explore the reuse of spatial data and infrastructure, managing associated data sovereignty and privacy risks as required.

Process Objective 4.2 Benefits Management Approach Implement a benefits management approach to identify the benefits from ICT investments, and then track, monitor and realise those benefits over time. QPRC will continue to implement a benefits management approach in accordance with project management frameworks to better identify the benefits from ICT investments, and then track, monitor and realise those benefits over time. This approach will include defining the logic that underpins ICT investments, identifying baseline and target measures, and regularly reporting benefits to governance and oversight bodies to hold business owners accountable for benefits realisation, making necessary adjustments to in-flight projects.

Technology Objective 4.3 Business Intelligence and Data Analytics Utilise business intelligence and analytics capabilities to extract value from existing and future data holdings. QPRC will continue to enhance its business intelligence (BI) and analytics capabilities, improving the use of existing data to draw insights and tailor products and services to the needs of the community. The Council will also collaborate with the ACT and Commonwealth Governments to explore big data and open government opportunities and initiatives.

ICT STRATEGIC PLAN / 10

REVIEWING AND MONITORING THE PLAN Oversight The Portfolio General Manager, Organisation Capability is the owner of the ICT Strategic Plan and is responsible for overseeing its implementation.

Review The Digital Branch will review and update the ICT Strategic Plan on an annual basis (or sooner if required). This is because the ICT Strategic Plan is a ‘living’ document that needs to reflect the changing needs of QPRC and the community it is supporting. As such, strategies, objectives and tasks should be reviewed, revised, added or removed as dictated by the changing strategic environment and priorities of QPRC. The primary objective of the annual review is to ensure that ongoing investment in people, processes and technology is aligned with, and responds to, the needs of the business.

The annual review of this document will form part of the broader ICT planning cycle and the Council’s integrated planning framework. As such, the planning cycle is intended as an open and ongoing dialogue with key stakeholders. The annual review will:

• reflect on the outcomes from the previous planning cycle, • consider ICT trends and external influences, • take a holistic approach to analysing the business environment, • validate current ICT strategies and projects, • workshop ICT strategies with key stakeholders, • re-publish the ICT Strategic Plan, if necessary, • communicate the key changes in the republished plan, • integrate the plan with the Resource Strategy, and • provide data for PEP reports and analytics.

ICT STRATEGIC PLAN / 11

IMPLEMENTATION ROAD MAP This Implementation Roadmap provides an indicative plan to meet the strategies and objectives contained within the ICT Strategic Plan. It is positioned as ‘indicative’, given that the owner of each accountable area needs to continually review and refine the underlying approach to ensure that the objectives and outcomes are achieved, rather than following a pre-defined, activity-based plan.

Strategy 1 – Optimised Organisation: What needs to be done? ID Objective Outcomes

What needs to be done? [2020 – 2024]

Time- frame

Owner

1.1

• ICT Workforce Management Plan: Develop an ICT Workforce Management Plan that focuses on the sourcing, retention and attraction of ICT staff.

• Increased candidate pool for vacancies.

• Increased investment in ICT training.

• Increased access to contingent skills.

• Improved retention rate.

• Develop ICT Workforce Management Plan and skills matrix as per the Position Description.

• Implement identified workforce strategies (including strategic sourcing arrangements for labour needs, filling identified training gaps, targeted recruitment and succession planning).

Q2–Q3 2020

Service Manager, Workplace and Culture.

1.2

• Commitment to Organisational Evolution: Build on the commitment to champion change within ICT and across the Council, for organisational evolution.

• Increased awareness of ICT capabilities to support business outcomes / reform.

• Continue to implement ICT change champions program.

2020 onwards

Service Manager, Digital.

ICT STRATEGIC PLAN / 12

ID Objective Outcomes

What needs to be done? [2020 – 2024]

Time- frame

Owner

1.3

• Modern ICT Service Management: Implement modern ICT service management tools and approaches to deliver and report on ICT services.

• Improved user satisfaction for core ICT services.

• Increased visibility of ICT performance and key metrics.

• Implement modern ICT service management approach (sequenced to improve monitoring and reporting, proactive issue management, and configuration management).

2020-2021

Service Manager, Digital.

1.4

• Business-oriented ICT Security: Ensure an appropriate balance between ICT security, performance and convenience.

• Reduced risk / occurrence of data and/or information breaches.

• Increased user appreciation of the need for, and use of, balanced security controls.

• Conduct security assessments and penetration testing.

• Review and update the DRP annually.

• Refine network layer protection and identity and access management.

• Engage business to ensure that security controls, including workplace surveillance and safeguards, are not overly restrictive or hamper business outcomes.

• Educate users on the need for appropriate security controls.

• Align ICT security with risk framework, report to ARIC, take part in internal audits, participate in BCP tests.

2020 onwards

Service Manager, Digital.

Strategy 1 – Optimised Organisation (Continued)

ICT STRATEGIC PLAN / 13

Strategy 2 – Digitally Enabled Workforce: What needs to be done? ID Objective Outcomes

What needs to be done? [2020 – 2024]

Time- frame

Owner

2.1

• Enhanced Digital Dexterity: Build user maturity in the effective use of ICT through ongoing learning and development.

• Increase use of self-help services and ICT training products.

• Reduced demand on ICT service desk for user training issues.

• Develop and promote existing training products.

• Build enhanced knowledge base for self-help services.

• Target strategies for reducing service desk enquiries.

2020 onwards

Service Manager, Digital.

2.2

• Optimisation of the ERP System: Optimise integrated Enterprise Resource Planning (ERP) system.

• Increased delivery of projects on time, budget and scope.

• Improved ERP capabilities. • Increased integration of key

information systems.

• Continue to facilitate process review to effect process redesign and optimise the ERP system.

• Lead the configuration and integration of TechOne modules through to completion.

2020 onwards

Service Manager, Digital.

2.3

• Remote Working with Seamless User Experience: Improve remote working and support more flexible, activity-based working arrangements.

• Increased staff mobility and remote working capability.

• Explore and develop activity-based work (ABW), work from home.

• Review and continuously improve remote working capabilities for a seamless user experience.

• Provide technology solutions that support ABW, in accordance with Work from Home (WFH) policy.

• Develop technology solutions to enable hot desking that prepares staff, in advance, for more efficient

2020

Service Manager, Digital.

ICT STRATEGIC PLAN / 14

ID Objective Outcomes

What needs to be done? [2020 – 2024]

Time- frame

Owner

2.3

ways of working in QPRC’s proposed new headquarters.

2020

Service Manager, Digital.

2.4

• Unified Technology Platform: Drive a common approach to ICT architecture across all locations and functions.

• Consistent user experience across all Council locations and business areas.

• Ongoing development and refinement of ICT systems architecture, network design and data centre strategy as part of the transformation process.

• Migrate QPRC’s systems to the Microsoft Azure Cloud in a considered and controlled manner.

2020-2023

Service Manager, Digital.

Strategy 2 – Digitally Enabled Workforce (Continued)

(Cont’d)

ICT STRATEGIC PLAN / 15

Strategy 3 – Citizen-centric Services: What needs to be done? ID Objective Outcomes

What needs to be done? [2020 – 2024]

Time- frame

Owner

3.1

• Co-design and Collaboration: Promote the voice of the community in ICT products and services through co-design and collaboration.

• Improved community satisfaction with ICT services.

• Continue to enhance user-centred design and co-design practices, and whole-of-organisation change initiatives.

• Explore and develop the use of mobile apps to enable community participation and input.

2020 onwards

Service Manager, Digital.

3.2

• Communication (Livestream + Your Voice): Engage the community and collect their input and insights regularly, through services such as livestream and Your Voice.

• Increased user involvement in digital/ online services and service design and delivery.

• Continue to engage community members and encourage feedback on digital products and services.

• Continue to facilitate regular collection of input and insights from the community through services like livestream and Your Voice.

2020 onwards

Service Manager, Customer & Communicati on.

3.3

• Digitally Enabled Services, Smart Cities and IoT: Utilise digitally enabled services, Smart City initiatives and the ‘Internet of Things (IoT) to meet community expectations.

• Increase in digital service uptake • Improved perception of QPRC

regions as Smart Cities.

• Explore opportunities to partner with other government organisations to implement digitally enabled services, Smart City technologies, and IoT.

2020 onwards

Service Manager, Business & Innovation.

ICT STRATEGIC PLAN / 16

Strategy 4 – Open and Connected: What needs to be done? ID Objective Outcomes

What needs to be done? [2020 – 2024]

Time- frame

Owner

4.1

• Build and Leverage External Partnerships: Build and leverage external partnerships to share, scale up and reuse common ICT capabilities and needs.

• Lead: Increased reuse of existing QPRC capabilities.

• Leverage: Increased use of other partner organisations’ / other organisations’ capabilities.

• Continue to deploy the Partnership Strategy that identifies potential partners, opportunities, and tangible actions to lead and leverage ICT capabilities

• In line with the Partnership Strategy, explore feasibility studies to build a shared services hub for other organisations.

2020 onwards

Service Manager, Digital.

4.2

• Benefits Management Approach: Implement a benefits management approach to identify the benefits from ICT investments, and then track, monitor and realise those benefits over time.

• Increased scrutiny of new project proposals based on problem analysis and intended benefits.

• Increased delivery of business benefits from ICT investments.

• Implement benefits management framework.

• Train staff in use of the framework. • Refine the framework.

• Provide relevant inputs into the Long Term Financial Plan (LTFP) and the Delivery Plan (DP) to ensure that QPRC is digitally contemporary.

• Generate funding through identified and reserved savings, such as the creation of a 'revolving fund'.

2020 onwards

Service Manager, Digital.

ICT STRATEGIC PLAN / 17

ID Objective Outcomes

What needs to be done? [2020 – 2024]

Time- frame

Owner

4.3

Business Intelligence and Data Analytics: Utilise business intelligence and analytics capabilities to extract value from existing and future data holdings.

• Increased use of data to inform decisions.

• Improved environment and development monitoring.

• Optimised survey processes. Use of drone technology to inspect the condition of infrastructure assets.

• Optimise imagery storage and processing technique.

• Trial deep learning processes for change detection.

• Improve positioning capabilities for drones.

• Develop feature extraction and measurement process for surveys.

• Obtain consensus in the infrastructure strategic asset management area, underpinned by the Operational Plan, Delivery Plan and Long Term Financial Plan.

2020 onwards

Service Manager, Digital.

Strategy 2 – Digitally Enabled Workforce (Continued)

ICT STRATEGIC PLAN / 18

APPENDIX A Executive Summary …from the Digital Economy and Smart Community Strategy Digital technology is an increasingly important influence that shapes social interaction, employment, collaboration, entertainment, decision-making and every aspect of our environment. Smart communities recognise this trend and use technology to expand opportunities and deliver benefits to the community.

This Strategy formally states our aspiration for Queanbeyan-Palerang to be a ‘smart community’ – from the city of Queanbeyan, to the townships of Bungendore and Braidwood, and our villages and rural properties.

It builds on existing plans and work, including the Queanbeyan CBD Transformation Strategy, and the ACT- Queanbeyan-Palerang Regional Council Memorandum of Understanding. It extends and reinforces our commitment to digital excellence, which recently saw QPRC endorse the principles of the ACT’s Digital Government Strategy.

This Strategy looks to deliver on the aspiration of the Community Strategic Plan that we have a diverse, resilient and smart economy fostering businesses that create jobs and wealth for all in our community.

Queanbeyan-Palerang Regional Council is committed to creating opportunities in the digital age – building our digital economy, harnessing the power of data for decision making, leveraging the convenience of online services, and increasing our local, national and global connectivity.

ICT STRATEGIC PLAN / 19

APPENDIX B Executive Summary …from the Community Engagement and Participation Plan The Community Engagement and Participation Plan provides Council staff with guidance when undertaking community engagement activities. It also serves to outline what the community can expect from Council with regard to community engagement.

This plan was developed with two purposes in mind. First, to outline the community

engagement and public exhibition practices that Council will undertake for projects, policies, concept designs, infrastructure, budgets and more. Second, it outlines how and when Council will undertake community participation when exercising relevant planning functions.

The plan was prepared to meet the requirements of a Community Participation

Plan (CPP) under the Environmental Planning and Assessment Act 1979 (EP&A Act). Information about community participation in Council’s planning functions can be found in Section 2 of the plan, which outlines the background, including EP&A Act principles that guide public participation, community participation in strategic planning matters, and development assessment including notifications and submissions.

ICT STRATEGIC PLAN / 20

APPENDIX C Summary: ERP System and Performance One of the risks presented by the amalgamation of the two councils was the inefficient use of disparate technology and corporate applications. Therefore, the consolidation and migration of various systems into a single ERP platform was of paramount importance to the success of the new organisation.

The new ERP system was commissioned in July 2019.

Current Status QPRC is currently operating in the CI environment for Property and Rating (P&R). The Systems team is working with TechOne on the implementation of P&R operations in an enhanced, web-based, user-friendly Ci Anywhere (CiA) environment, but it is still in the early stages.

The CES EAM Mobility solution has been rolled out in various sections to perform asset inspection and maintenance activities.

TechOne is currently working on the development of an API that allows a two- way data flow: from the NSW Planning Portal directly into the P&R System, and requests from Council flowing back to the applicant through the same API.

Finance and EAM Asset modules are integrated and automated, contributing towards improved management of capital and operations projects. Also, the ETL configured between the Contract Management and Finance modules allows automation of supplier data flow into the creditors’ section in the Contract Management module.

ECM is mostly in CiA; only specific administration functions are still within the CI environment. New functionality is being introduced as part of the TechOne 2020A release, which will have a flow-on effect in other areas such as P&R and CES.

HRP is almost all in CiA now, with only a few functions needing to be actioned in CI. The eRecruitment module is in CiA but has not yet gone live. TechOne is still working on an Award Interpreter with Tanda, which is currently on hold.

TechOne CES is regularly rolling out new products/modules into the CiA environment.

The detailed status of all major ERP components and their ecosystems is outlined in the tables below.

ICT STRATEGIC PLAN / 21

TechnologyOne Financials

ETL for Financials Fully functional

Expense Management New module Analytics for Financials New module

BPA Forms Financials New module

Accounts Payable Fully functional Allocations for Financials Fully functional

Fixed Assets

BI Analysis for Financials Fully functional BI Dashboard for Financials Fully functional

External Systems Interface

General Subsidiary Ledger and Management Functions Fully Functional & Integrated Purchasing Cards Fully functional

Workflow Maintenance for Financials Fully functional

XLOne Reporting for Financials Fully functional XLOne Modelling for Financials Fully functional

MyPurchase Cards Fully functional

MyQuickReconciliation Fully functional MyStandardReports & Enquiries (Financials) Fully functional

MyWorkflow (Financials) Fully functional

Reconciliation Fully functional Recurring Documents Fully functional

Web Services for Financials Fully functional

ICT STRATEGIC PLAN / 22

TechnologyOne Property

EDMS - Container Creation Fully functional Analytics for Property New module

BPA Forms Property New module

EDMS - Data Synchronisation Fully functional

GIS Integration - Navigation

GIS Integration - Embedded Mapping Fully functional GIS Integration - Data Sync & Reconciliation

Animal Management NA in NSW

Quick Address Integration Fully functional Bonds and Guarantees Not yet implemented

Certificates Fully functional

EDMS - Document Registration Fully functional Request Management Fully functional

Debtors Fully functional

Developer Levies Fully functional eCustomer Fully functional

eDocument Delivery

eLodgements Fully functional ePayments Fully functional

eRequests Fully functional

eTracking Fully functional External Web Services - NSW eDais Infringements Just started

ICT STRATEGIC PLAN / 23

TechnologyOne Property

User Defined Registers Fully functional

Data Management

Property Nucleus Fully functional Property By Law Enforcement Fully functional

Property Leases Not yet implemented

Licences and Permits Fully functional Development & Building Applications Fully functional

Rating & Valuations Fully functional

Cash Receipting Fully functional Service Management Configured

Trade Waste Fully functional

User Defined Regulatory Modules (NFSU) Water Management Fully functional

XL One Reporting for Property Fully functional

XML Interface - NSW Land Data Task Booking & Scheduling Just started

Publisher Designer Fully functional

ICT STRATEGIC PLAN / 24

TechnologyOne Enterprise Asset Management

MyBusinessIntelligence (Asset Management)

Strategic Asset Management New module

Analytics for Asset Management New module BPA Forms Asset Management New module

MyProjects Fully functional

MyWorkOrders Fully functional Business Intelligence for Asset Management Limited availability

ETL for Asset Management Fully functional

Physical Assets Register Fully functional BI Analysis for Asset Management Fully functional

BI Dashboard for Asset Management Limited availability

Billing Not configured Bill of Materials Not configured

Defect Management Fully functional

Work Schedule & Dispatch Fully functional eContractorWork Not configured

Fleet & Asset Booking Fully functional

Asset Management GIS Mapping & Viewer Integration Fully functional GIS Data Synchronisation & Reconciliation Fully functional

Conditions & Inspections Fully functional

Maintenance Scheduling Fully functional Investment Prioritisation & Optimisation Not configured

Projects Fully functional

ICT STRATEGIC PLAN / 25

TechnologyOne Enterprise Asset Management

Web Services - Assets Not configured

Web Services - Condition & Inspections Not configured

Web Services - Projects Not configured Web Services - Work Orders Not configured

Work Orders Fully functional

XLOne Reporting for Asset Management Limited availability

TechnologyOne ECM

XLOne Reporting for ECM Fully functional

Analytics for ECM New module

BPA Forms for ECM New module ECM Web Services Fully functional

ECM Core Fully functional

ICT STRATEGIC PLAN / 26

TechnologyOne HR and Payroll

Occupational Health and Safety Configuration Required

Recruitment uplift Go live review scheduled

Analytics Uplift Training 50% configured - not launched

Transitions New Module

DocOne for HRP New Module Succession Planning New Module

360 Reviews New Module

Velpic Connector New Module Velpic Licence (named users New Module

Organisation Management Fully functional

MyPay Fully functional Recruitment See Recruitment Uplift

MyTeam Details Fully functional

MyTeam Leave Fully functional My Details Fully functional

MyLeave Fully functional

Business Intelligence for HR & Payroll To be replaced by Analytics ETL for HR & Payroll Fully functional

Human Resources and Payroll Fully functional

Employee Development Part of Appraisals, etc. Forms Configuration Required

MyTeam Timesheets Fully functional

ICT STRATEGIC PLAN / 27

TechnologyOne HR and Payroll

Timesheet Entry & Costing Fully functional

Web Services for HR & Payroll Fully functional

XLOne Reporting for HR & Payroll Fully functional MyBusinessIntelligence (HR & Payroll) Fully functional

MyStandardReports & Enquiries (HR & Payroll) Fully functional

MyWorkflow (HR & Payroll) Fully functional MyDevelopment Not Configured

TechnologyOne Enterprise Cash Receipting

Backoffice and Bpay Fully functional

CRM Configured /Execs approval required EFTPOS Fully functional & Integrated

Financials Fully functional & Integrated

Property Fully functional & Integrated ECR Core Fully functional

ICT STRATEGIC PLAN / 28

TechnologyOne Performance Planning

Performance Planning Fully functional

XL One Reporting for Performance Planning Fully functional

BI Analysis for Performance Planning Limited use BI Dashboard for Performance Planning Limited use

ETL for Performance Planning Fully functional

TechnologyOne Spatial

IntraMaps Assetic Connector Not used Map Builder New module

IntraMaps Map Control Not Configured

IntraMaps Enterprise Fully functional IntraMaps Property Connector Fully functional

IntraMaps Public Fully Functional

IntraMaps Sync Framework Fully functional

ICT STRATEGIC PLAN / 29

TechnologyOne Breakout Packs

Asset Mgt Mobility - Asset Survey Functional but no buy in

Asset Mgt Mobility - Crew Management Fully functional

Asset Mgt Mobility - Defects Fully functional Asset Mgt Mobility - Inspections Fully functional

Asset Mgt Mobility - Work Orders Fully functional

MyTimesheets Fully functional MyWorkRequests Configured

My Enterprise Budgeting Configured

MyAssetBookings Not Configured MyTimesheets for Payroll Fully functional

Property & Rating Windows Mobile Inspections Fully functional

Publisher Generator Fully functional

TechnologyOne Supply Chain Management

ETL for Supply Chain Configured

Sourcing (quotations) New module

Sourcing (Advanced Tenders) New module Auto Invoice Matching New module

Analytics for Supply Chain New module

BPA Forms Supply Chain New module BI Analysis for Supply Chain

ICT STRATEGIC PLAN / 30

TechnologyOne Supply Chain Management

BI Dashboard for Supply Chain Configured

Inventory/Stores Configured

Purchasing/Commitments Fully functional Purchasing Quotations Fully functional

Requisitioning Fully functional

Web Services for Supply Chain Management Workflow Maintenance for SCM

XLOne Reporting for Supply Chain Fully functional

Effectiveness The Council is now on one platform for all systems. Single source of truth, information, reporting and staff involvement are all within the same environment. Legacy systems are used for information only. Optimisation and enhancements to the ERP systems are carried out regularly, striving to achieve the balance between tailoring the new system to QPRC’s needs while adhering to recommended best practice. In some operational areas, there is still a certain level of user resistance in embracing new system workflows and processes, not because users perceive them to be suboptimal solutions, but because these systems are perceived as “new” and “different”.

Benefits Realisation • Consolidation of many disparate corporate systems (PAL TechOne, Pathway, TRIM, Assetic, and Aurion) into a unified system. • Savings of up to $300,000 in FY 2019-20 from the cancellation of TRIM, Pathway, Aurion, Assetic, and MEX licenses. • Simplified network and system architecture has eliminated the need for complex, cross-domain/federated system integration. • More staff are using the electronic timesheet than ever before. • Built-in data flow and connected content across all major systems and modules has eliminated the need for expensive, complex

integration. • Consolidation of six different vendors into one vendor has reduced the load on the Digital Branch in terms of managing vendor

relationships and contract renewals.

ICT STRATEGIC PLAN / 31

• The new mobility platform enables the Asset Management team to process work orders on-site instead of coming back to the office to do so; however, uptake has been relatively slow.

• Business Intelligence and Insights is a new feature that enhances data-driven decision making; however, uptake has been slow. • The Trim and Pathway systems will be decommissioned in the near future; this will reduce server and enterprise storage resources, and

reduce the Digital team’s workload in terms of maintenance and support. Further Actions Required

• When the P&R system was commissioned, the P&R Mobility was one of the modules put on hold. Commissioning this module would improve the system and boost productivity.

• It is also important to implement the Infringements module; this can be done if PinForce data is compatible, and can imported into the P&R system.

• The Bonds and Guarantees module and the Property Lease module were put on hold when the ERP system was commissioned; a review is warranted, to determine when these modules can be implemented.

• The EAM Mobility has been commissioned and is fully functional; however, some business areas are not using this module. Renewed focus on stakeholder engagement may help improve uptake.

• CRM and CES EAM integration can also be implemented. • Investigate whether other modules such as Bank Rec, Journal, etc., can benefit from using CiAnywhere. • Investigate how QPRC can still make use of the Planning Portal while TechOne is developing the full API integration solution; this may

require some manual data imports. • Coordinate with TechOne to progress the implementation of Award Interpreter with Tanda. • Progress towards the commissioning the eRecruitment module. • Investigate and progress the use of CiA-ready modules such as AP, Purchase Cards and Assets. • Increase stakeholder engagement to discuss the benefits of moving from CI to the CiA environment. • Investigate the feasibility of migrating from on-premises systems to TechOne SaaS.

ICT STRATEGIC PLAN / 32

APPENDIX D Potential KPIs

KPI Target Notes

• User satisfaction with ICT service delivery 50+ increase of 5 points YoY → Net Promotor Score is used to measure this

• Security testing and enhancement initiatives and audits 4/year → Pentest and NSW Audit Office audit included

• NSW Audit Office ICT audit rating >80 percentile

• ERP integrations successfully delivered 20/year

• Community satisfaction of QPRC's digital/online services >60%

• Design and deliver Power BI dashboards to business units 4/year

• Reduction of the total time for [surveys + development of plans], using drone technology

20%

ICT STRATEGIC PLAN / 33

APPENDIX E Summary: Completed Actions from the Former ICT Strategic Plan Strategy 1 from Former ICT Strategic Plan: Maintain a robust, reliable, secure and available ICT environment ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

1.1

• Develop an ICT Workforce Management Plan that focuses on the sourcing, retention and attraction of ICT staff.

• Increased candidate pool for vacancies.

• Increased investment in ICT training.

• Increased access to contingent skills.

• Improved retention rate.

 No staff attrition in the Digital Branch in the last 2½ years.  SQL/SCCM training for Paul Sanders and Bob Wanner; P&R training for the entire

systems team; Office365 training for Scott Heffernan and Jodie Malvern.  Relatively good OCI scores from the branch.

1.2

• Build on the commitment and desire to champion and drive change within ICT and across the Council

• Increased awareness of ICT capabilities to support business outcomes/reform.

 P&R training for the entire systems team.

1.3

• Implement a right- sized ICT service management approach to deliver and report on ICT services

• Improved user satisfaction for core ICT services.

• Increased visibility of ICT performance and key metrics.

 Network switch (x 45) replacement completed across all locations.  Location-independent file/print/core services.  Uniform desktop experience via new Citrix server solution.

Legend: Objectives shaded in blue have been completed/actioned.

ICT STRATEGIC PLAN / 34

ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

1.4

• Implement a robust Information Management strategy and approach

• Improved alignment between business capabilities and information systems.

• Improved access to data and sharing of data and records across the business.

 OneCouncil ERP Business Intelligence tools and Analytic tools are now available through ERP for various business units. The Digital team is also encouraging business units to use predictive analytics to prepare their work programs.

 Continue to integrate data and automate data exchange between Spatial systems and OneCouncil.

1.5 • Ensure an appropriate balance between security, performance and convenience.

• Reduced risk/occurrence of information/data breaches.

• Increased user appreciation of the need for, and use of, balanced security controls.

 Network security – Pen Test completed. The cybersecurity risk level has now been downgraded to low.

 Darktrace network immune implementation completed across all 3 locations.

1.6 • Drive a common approach to ICT systems, technology and architecture across all locations and functions

• Consistent user experience across all Council locations and business areas.

 OneCouncil ERP solution provides a common experience for users. The Digital team has started rolling out the event management system across relevant business functions, across all locations.

 New Citrix/Thin client solution fully tested and in production.

Legend: Objectives shaded in blue have been completed/actioned.

ICT STRATEGIC PLAN / 35

Strategy 2 from Former ICT Strategic Plan: Maximise the value from ICT investments and projects

ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

2.1

• Build and leverage external partnerships to share and reuse common ICT capabilities and needs

Lead: • Increased reuse of

existing QPRC capabilities.

Leverage: • Increased use of

partner organisations’ / other organisations’ capabilities.

 Use of the QPRC Spatial Portal to exchange data and information with external partners.

 A shared acquisition of aerial imagery, in partnership with the ACT Government’s Office of the Surveyor-General and Land Information.

2.2

• Refine the project management framework to promote scalable, flexible and agile practices

• Increased delivery of projects on time, and within budget and scope.

 Digital has adapted a far more Agile methodology. The new Citrix remote access solution was completed through multiple iterations.

2.3

• Develop and implement a benefits management approach (integrated with governance arrangements)

• Increased scrutiny of new project proposals based on problem analysis and intended benefits.

• Increased delivery of business benefits from ICT investments.

 Use of 3D mapping to analyse and evaluate the Queanbeyan Flood study.  Use of spatial applications such as Urban Circus to create 3D CBD model

(reducing the cost of modelling) as part of the Smart Cities project.  Use of the Spatial Portal to develop web-based data collection for improvement of

utilities and assets data.

Legend: Objectives shaded in blue have been completed/actioned.

ICT STRATEGIC PLAN / 36

ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

2.4

• Utilise business intelligence and analytics capabilities to extract value from existing and future data holdings.

• Increased use of data to inform decisions.

 OneCouncil ERP Business Intelligence tools and Analytic tools are now available through ERP for various business units. The Digital team is also encouraging business units to use predictive analytics to prepare their work programs.

 Continue to integrate data and automate data exchange between Spatial systems and OneCouncil.

Strategy 3 from Former ICT Strategic Plan: Reflect the voice of the community in ICT products and services

ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

3.1

• Promote the voice of the community in ICT products and services through co- design and collaboration

• Improved community satisfaction with ICT services.

 Web access / online Council services provided to the community.

3.2

• Institute a regular mechanism to engage the community and collect their input and insights

• Increased user involvement in ICT service and product planning and delivery.

Legend: Objectives shaded in blue have been completed/actioned.

ICT STRATEGIC PLAN / 37

ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

3.3

• Utilise digitally enabled services and smart city technology to meet community expectations

• Increase in digital service uptake.

• Improved perception of QPRC regions as ‘smart cities’.

 Smart City Wi-Fi project.  Smart City CCTV project.

Strategy 4 from Former ICT Strategic Plan: ICT users and staff are supported and empowered to deliver business outcomes

ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

4.1

• Build user maturity in the effective use of ICT through ongoing learning and development

• Increased use of self-help services and ICT training products.

• Reduced demand on the ICT service desk for user training issues.

 Business services such as the library have been equipped with self-service counters / kiosks.

 Developed a training pack for outdoor staff.

4.2

• Ensure ICT supports the merger process and a single approach and culture across the ICT team

• Consistent user experience across all Council locations and business areas.

 Single approach - User login business rules regularised and implemented.  Users have the same drive mapping and access to the same files, email and

corporate applications wherever they are based on the day.

Legend: Objectives shaded in blue have been completed/actioned.

ICT STRATEGIC PLAN / 38

ID Objective Intended Outcomes

Completed Actions [2017 – 2019]

4.3

• Resource and position the Business Analysis Unit (BAU) to work proactively to enable business outcomes

• Increased engagement between BAU and business stakeholders.

 Regular TechOne user group meetings arranged by the Digital systems team.  BA and PM work for the Intelligenz project (sportsground booking).

4.4

• Improve mobile working capability and support more flexible / activity- based working arrangements

• Increased staff mobility.  Mobility Solution delivered for TechOne EAM users.  The Digital team has developed a process to determine users’ eligibility for mobile

device(s) and is now issuing such devices in ever greater numbers. QPRC now supports more mobile platforms than at any time in the past.

4.5 • Implement an integrated ERP system

• Improved ERP capabilities. • Increased integration of key

information systems/asset classes.

 Business units such as finance are making use of business intelligence and the dashboards available within the system. Automation has been implemented in the ERP system to enhance integration between modules such as finance, assets, contracts and work orders.

Legend: Objectives shaded in blue have been completed/actioned.

ICT STRATEGIC PLAN / 39

GLOSSARY Abbreviation or Term Expansion or Description

ABW Activity-based Work

ACT Australian Capital Territory

API Application Programming Interface ARIC Audit, Risk and Improvement Committee

BA Business Analyst

BCP Business Continuity Plan

BI Business Intelligence

Ci Connected Intelligence, an enterprise software platform

CiA Ci Anywhere, an enhanced enterprise software platform

CBD Central Business District

CCTV Closed-circuit Television

CPP Community Participation Plan

CRM Customer Request Management (terminology used by IT provider TechOne)

DP Delivery Plan

DRP Disaster Recovery Plan

E&PA Act EP&A Act Environmental Planning and Assessment Act 1979

EAM Enterprise Asset Management

ECM Enterprise Content Management

ERP Enterprise Resource Planning

ICT STRATEGIC PLAN / 40

Abbreviation or Term Expansion or Description

ETL Extract, transform, load: three database functions that transfer data from one database to another.

HRP Human Resources and Payroll

ICT Information and Communications Technology

IoT Internet of Things

ITSM IT Service Management

KB Knowledge Base

Lead Increasing the use and reuse of existing organisational capabilities

Leverage Increasing the use of partner organisations’ capabilities and/or other organisations’ capabilities

LGA Local Government Authority

LTFP Long Term Financial Plan

MEX A Cloud solution provider

OCI score Organisational Culture Inventory score

P&R Property and Rating

PEP Performance Excellence Program

PM Project Manager

QPRC Queanbeyan Palerang Regional Council

SaaS Software as a Service

SCCM System Centre Configuration Manager

SQL Structured Query Language

TRIM An enterprise document management system

WFH Work from Home

Glossary (Continued)

QPRC

Offices: Council headquarters – 256 Crawford St. Bungendore Office – 10 Majara St.

Braidwood Office – 144 Wallace St. Contact: P: 1300 735 025

E: [email protected]

W: www.qprc.nsw.gov.au

  • ICT Strategic Plan
    • QPRC
  • QUEANBEYAN-PALERANG REGIONAL COUNCIL
  • FOREWORD
  • EXECUTIVE SUMMARY
  • Aspirations and Values
    • Our Aspirations
    • Our Values
  • OVERVIEW
    • Context
      • The transition phase, a major and complex exercise, ensured the merger of the Queanbeyan City and Palerang Councils into the entity known as QPRC. The transition resulted in extensive changes to QPRC’s organisational structure, processes and systems, ...
      • Following the transition phase, which capitalised on the opportunity to rationalise and improve systems and implement important systems such as Enterprise Resource Planning (ERP), the Digital Branch now seeks to realise the full benefits of these busi...
      • Like any organisation, QPRC needs to respond to changes in its external environment now and into the future. Technological advances will continue to support the increasing shift to digital service delivery and automation, and more sophisticated, bette...
      • As we enter the next phase of our organisational journey, QPRC must not lose sight of its core role of providing services to its staff and the community. Some of these services will continue to evolve – for example, digital and online services. Howeve...
      • The ICT Strategic Plan is not a ‘technology plan’, but a key strategic planning artefact that needs to be owned and driven by all parts of the organisation to ensure that their current and future needs are supported through a whole-of-capability appro...
    • Drivers for Digital Government
      • QPRC is committed to leveraging new technology and smart thinking to deliver real benefits for our community, in jobs, education, innovation, commerce, and liveability. The following operations, services and initiatives play a key role in achieving th...
    • What does success look like?
    • Strategy Map
      • This strategy map provides an overview of the four key strategies that underpin this ICT Strategic Plan and the underlying objectives that will enable each strategy to be realised. Each objective is linked to one or more of the three components that c...
  • LEGEND: People Process Technology
  • Strategy 1:
    • Optimised Organisation
      • People
      • Process
      • Technology
    • Strategy 2: Digitally Enabled Workforce
      • People
      • Process
      • The Digital Branch will engage business units to facilitate process review in order to effect process redesign and optimise the ERP system. This system supports community engagement, development and regulatory services, asset and works management, HR ...
  • Strategy 3:
    • Citizen-centric Services
      • People
      • Process
      • Technology
        • Utilise digitally enabled services, Smart City initiatives and the ‘Internet of Things (IoT) to meet community expectations.
  • Strategy 4:
    • Open and Connected
      • People
      • Process
      • Technology
  • Reviewing and Monitoring the Plan
    • Oversight
    • Review
  • Implementation Road Map
    • Strategy 1 – Optimised Organisation: What needs to be done?
    • Strategy 2 – Digitally Enabled Workforce: What needs to be done?
    • Strategy 3 – Citizen-centric Services: What needs to be done?
    • Strategy 4 – Open and Connected: What needs to be done?
  • Strategy 1 – Optimised Organisation (Continued)
  • Strategy 2 – Digitally Enabled Workforce (Continued)
  • Strategy 2 – Digitally Enabled Workforce (Continued)
  • Appendix A
    • Executive Summary
  • Appendix B
    • Executive Summary
  • Appendix C
    • Summary: ERP System and Performance
      • Current Status
      • Effectiveness
      • Benefits Realisation
      • Further Actions Required
  • Appendix D
    • Potential KPIs
  • Appendix E
    • Summary: Completed Actions from the Former ICT Strategic Plan
    • Strategy 1 from Former ICT Strategic Plan: Maintain a robust, reliable, secure and available ICT environment
    • Strategy 2 from Former ICT Strategic Plan: Maximise the value from ICT investments and projects
    • Strategy 3 from Former ICT Strategic Plan: Reflect the voice of the community in ICT products and services
    • Strategy 4 from Former ICT Strategic Plan:
    • ICT users and staff are supported and empowered to deliver business outcomes
  • Glossary