Group project work
Project Outline and Schedule
At the end of Week 4 a designated Group Member has to submit approved by all members Project Outline and Schedule.
Study Group #: ____1___________________________________
Group Project: ___Black Box for Package Delivery Drone______
1. Project Outline
1.1. Group Project description
a. Develop a robust black box to record the last 30 minutes of flight data captured from sensors on a commercial delivery drone.
1.2. List of the main topics and subtopics of your Group Project presentation
a. Flight Data Recorder (Black Box) of Traditional Commercial Aircraft (Dobbertin)
b. Camera, rotor, gyroscope, GPS, speed, and audio sensors with chart including sensor type, output data, rate of output, types of compression (Cabrera)
c. Black Boxes surviving at low altitudes (Nichols)
d. Two cellular (LTE) data links sensors with chart including sensor type, output data, rate of output, types of compression (Saale)
e. Create a context diagram showing interfaces and data flows between the black box and main flight computer (Tilahun)
f. Quantitative analysis to assure adequate capacity (Gardner)
g. Existing patents or standards should be considered in design (Jasmine)
1.3. Resources
a. UMUC Library
b. Internet
c. Project Schedule
|
Week |
Task |
Group Member |
|
5 |
1. Min. of two Main/Topics/Subtopics Due by end of week **Should have drafted slides submitted by this time** |
1. Saale 2. Nichols |
|
6 |
1. Create GRPs Main PPT – Consolidate All Submitted Slides |
3. Velasquez |
|
7 |
1. Min. of two Main/Topics/Subtopics Due by end of week **Should have drafted slides submitted by this time** |
1. Dobbertin 2. Cabrera |
|
8 |
1. Update GRPs Main PPT Slides – Add new slides and any updated slides |
1. Hammonds |
|
9 |
1. Final two Main/Topics/Subtopics Due by end of week **All drafted slides submitted by this time** |
1. Jasmine 2. Tilahun 3. Gardner |
|
10 |
1. Final Update of GRPs Main PPT Presentation – All Updated/Final Slides due |
1. Gardner |
|
11 |
1. Final Quality Assurance Review and Submit GRP Project 2. Submit Peer Evaluations to Prof.
|
1. Dobbertin 2. Everyone |
-------------------------------------------------------------------------------------------------------
NOTE: Those who did not add their names to the outline for a task as of 12 Jun 2020, your name was added to the PowerPoint Presentation Team located on the schedule within the outline. Your task is to consolidate the slides submitted by/thru your assigned week and create/update the PowerPoint for a CEO level audience to be submitted NLT Tuesday, 23:59HRS, EST, of your specified week. This includes reviewing the slides submitted and making necessary grammar and other types of changes as necessary and ensure the slides transition appropriately. If you do not understand slide(s) someone submitted, please ask them directly via chat discussion so the group can all understand together.
Those who are assigned main topics, review the schedule which reflects the week your topic slides with notes completed/drafted are due for the PowerPoint team the following week. However, you can complete your part earlier. (Ex. - WK 9 personnel can submit any time before WK 9, but must be submitted NLT Tuesday, 23:59hrs EST, for that particular week your assigned to)
-------------------------------------------------------------------------------------------------------