Project managers have two different interests in quality. Some projects are performed to provide a
significant improvement in the quality of an existing process, and the project activities themselves must
reflect high-quality standards. A basic knowledge of the statistics and procedures used in quality
control will help the project manager understand the objectives of step projects and perform projects in
companies that are committed to high-quality standards.
10.1 Quality and Sta:s:cs
ne quality.
2. Define and explain sta4s4cs terms used in quality control.
3. Es4mate the likelihood of samples falling within one, two, or three standard devia4ons of the mean
given a normal distribu4on caused by random factors.
Defini:ons of Quality and Grade
Quality is a relative term, which means that something is of high or low quality compared to what it is
required to be. According to the International Organization for Standardization (ISO), quality is “the
degree to which a set of inherent characteristics fulfill requirements.”International Organization for
Standardization, Quality Management Systems—Fundamentals and Vocabulary (Geneva: ISO Press,
2005), in Project Management Institute, Inc., A Guide to the Project Management Body of Knowledge
(PMBOK Guide), 4th ed. (Newtown Square, PA: Project Management Institute, Inc., 2008), 190. The
requirements of a product or process can be categorized or given a grade. The quality is determined by
how well something meets the requirements of its grade. Consider the following examples.
Quality of Gasoline Grades
Petroleum refiners provide gasoline in several different grades based on the octane rating because
higher octane ratings are suitable for higher compression engines. Gasoline must not be
contaminated with dirt or water, and the actual performance of the fuel must be close to its octane
rating. A shipment of low-grade gasoline graded as 87 octane that is free of water or other
contaminants would be of high quality, while a shipment of high grade 93 octane gas that is
contaminated with dirt would be of low quality.
Quality of Furniture Packing in John’s Move
John has antique furniture that is in excellent condition that was left to him by his grandmother.
The pieces are important to John for sentimental reasons and they are also valuable. John decides
to hire movers (high-grade professionals) to load his furniture into the truck using appropriate
padding and restraints to prevent dents and scratches during the long trip to Atlanta and then to
unload the truck in Atlanta. John’s standard for high quality is that no observable damage occurs to
his large pieces of furniture, especially the antiques. If the furniture arrives in his new apartment
without a single dent, scratch, or other damage, the activity will be of high quality.
John’s standard for packing his kitchen is lower. His dishes are old and cheap, so he decides to
trust his inexperienced friends (low-grade amateurs) to help him pack his kitchen. If a few of the
dishes or glassware are chipped or broken in the process, the savings in labor cost will more than
make up for the loss, and the dishes can be easily replaced. If John has a few chipped dishes and a
broken glass or two by the time he is unpacked in Atlanta, he will consider the kitchen packing to
be of high quality.
For most people, the term quality also implies good value—getting your money’s worth. For example,
even low-grade products should still work as expected, be safe to use, and last a reasonable amount of
time.
Sta:s:cs Terminology
Determining how well products meet grade requirements is done by taking measurements and then
interpreting those measurements. Statistics—the mathematical interpretation of numerical data—is
useful when interpreting large numbers of measurements and is used to determine how well the
product meets a specification when the same product is made repeatedly. Measurements made on
samples of the product must be between control limits—the upper and lower extremes of allowable
variation—and it is up to management to design a process that will consistently produce products
between those limits.
SePng Control Limits in Gasoline Produc:on
A petroleum refinery produces large quantities of fuel in several grades. Samples of the fuels are
extracted and measured at regular intervals. If a fuel is supposed to have an 87 octane
performance, samples of the fuel should produce test results that are close to that value. Many of
the samples will have scores that are different from 87. The differences are due to random factors
that are difficult or expensive to control. Most of the samples should be close to the 87 rating and
none of them should be too far off. The manufacturer has grades of 85 and 89, so they decide that
none of the samples of the 87 octane fuel should be less than 86 or higher than 88.
If a process is designed to produce a product of a certain size or other measured characteristic, it is
impossible to control all the small factors that can cause the product to differ slightly from the desired
measurement. Some of these factors will produce products that have measurements that are larger than
desired and some will have the opposite effect. If several random factors are affecting the process, they
tend to offset each other most of the time, and the most common results are near the middle of the
range. This idea is called the central limit theorem.
If the range of possible measurement values is divided equally into subdivisions called bins, the
measurements can be sorted, and the number of measurements that fall into each bin can be counted.
The result is a frequency distribution that shows how many measurements fall into each bin. If the
effects that are causing the differences are random and tend to offset each other, the frequency
distribution is called a normal distribution, which resembles the shape of a bell with edges that flare
out. The edges of a theoretical normal distribution curve get very close to zero but do not reach zero.
Normal Distribu:on of Gasoline Samples
A refinery’s quality control manager measures many samples of 87 octane gasoline, sorts the
measurements by their octane rating into bins that are 0.1 octane wide, and then counts the
number of measurements in each bin. Then she creates a frequency distribution chart of the data,
as shown in Figure 10.1 "Normal Distribution of Measurements of Gasoline Samples".
If the measurements of product samples are distributed equally above and below the center of the
distribution as they are in Figure 10.1 "Normal Distribution of Measurements of Gasoline Samples", the
average of those measurements is also the center value that is called the mean and is represented in
formulas by the lowercase Greek letter µ (pronounced mu). The amount of difference of the
measurements from the central value is called the sample standard deviation or just the standard
deviation. The first step in calculating the standard deviation is subtracting each measurement from
the central value and then squaring that difference. (Recall from your mathematics courses that
squaring a number is multiplying it by itself and that the result is always positive.) The next step is to
sum these squared values and divide by the number of values minus one. The last step is to take the
square root. The result can be thought of as an average difference. (If you had used the usual method of
taking an average, the positive and negative numbers would have summed to zero.) Mathematicians
represent the standard deviation with the lowercase Greek letter σ (pronounced sigma). If all the
elements of a group are measured, it is called the standard deviation of the population and the second
step does not use a minus one.
Figure 10.1 Normal Distribution of Measurements of Gasoline Samples
The chart shows that the most common measurements of octane rating are close to 87 and that the other
measurements are distributed equally above and below 87. The shape of the distribution chart supports the
central limit theorem’s assumption that the factors that are affecting the octane rating are random and tend
to offset each other, which is indicated by the symmetric shape. This distribution is a classic example of a
normal distribution. The quality control manager notices that none of the measurements are above 88 or
below 86 so they are within control limits and concludes that the process is working satisfactorily.
Standard Devia:on of Gasoline Samples
The refinery’s quality control manager uses the standard deviation function in his spreadsheet
program to find the standard deviation of the sample measurements and finds that for his data, the
standard deviation is 0.3 octane. She marks the range on the frequency distribution chart to show
the values that fall within one sigma (standard deviation) on either side of the mean. See the figure
below.
Figure 10.2
Most of the measurements are within 0.3 octane of 87.
For normal distributions, about 68.3 percent of the measurements fall within one standard deviation
on either side of the mean. This is a useful rule of thumb for analyzing some types of data. If the
variation between measurements is caused by random factors that result in a normal distribution and
someone tells you the mean and the standard deviation, you know that a little over two-thirds of the
measurements are within a standard deviation on either side of the mean. Because of the shape of the
curve, the number of measurements within two standard deviations is 95.4 percent, and the number of
measurements within three standard deviations is 99.7 percent. For example, if someone said the
average (mean) height for adult men in the United States is 5 feet 10 inches (70 inches) and the
standard deviation is about 3 inches, you would know that 68 percent of the men in the United States
are between five feet seven inches (67 inches) and six feet one inch (73 inches) in height. You would
also know that about 95 percent of the adult men in the United States were between five feet four
inches and six feet four inches tall, and that almost all of them (99.7 percent) are between five feet one
inches and six feet seven inches tall. These figures are referred to as the 68-95-99.7 rule.
Almost All Samples of Gasoline are Within Three STD
The refinery’s quality control manager marks the ranges included within two and three standard
deviations, as shown below.
Figure 10.3
The 68-95-99.7 Rule
Some products must have less variability than others to meet their purpose. For example, if one
machine drills a hole and another machine shapes a rod that will slide through the hole, it might be
very important to be sure that if the smallest hole was ever matched with the widest rod, that the rod
would still fit. Three standard deviations from the control limits might be fine for some products but
not for others. In general, if the mean is six standard deviations from both control limits, the likelihood
of a part exceeding the control limits from random variation is practically zero (2 in 1,000,000,000).
Refer to Figure 10.4 "Meaning of Sigma Levels".
Figure 10.4 Meaning of Sigma Levels
A Step Project Improves Quality of Gasoline
A new refinery process is installed that produces fuels with less variability. The refinery’s quality
control manager takes a new set of samples and charts a new frequency distribution diagram, as
shown below.
Figure 10.5
Smaller Standard Deviation
The refinery’s quality control manager calculates that the new standard deviation is 0.2 octane.
From this, he can use the 68-95-99.7 rule to estimate that 68.3 percent of the fuel produced will be
between 86.8 and 87.2 and that 99.7 percent will be between 86.4 and 87.6 octane. A shorthand
way of describing this amount of control is to say that it is a five-sigma production system, which
refers to the five standard deviations between the mean and the control limit on each side.
KEY TAKEAWAYS
Quality is the degree to which a product or service fulfills requirements and provides value for its
price.
Sta4s4cs is the mathema4cal interpreta4on of numerical data, and several sta4s4cal terms are used
in quality control. Control limits are the boundaries of acceptable varia4on.
If random factors cause varia4on, they will tend to cancel each other out—the central limit
theorem. The central point in the distribu4on is the mean, which is represented by the Greek leLer
mu, µ. If you choose intervals called bins and count the number of samples that fall into each
interval, the result is a frequency distribu4on. If you chart the distribu4on and the factors that cause
varia4on are random, the frequency distribu4on is a normal distribu4on, which looks bell shaped.
The center of the normal distribu4on is called the mean, and the average varia4on is calculated in a
special way that finds the average of the squares of the differences between samples and the mean
and then takes the square root. This average difference is called the standard devia4on, which is
represented by the Greek leLer sigma, σ.
About 68 percent of the samples are within one standard devia4on, 95.4 percent are within two,
and 99.7 percent are within three.
EXERCISES
1. According to the ISO, quality is the degree to which a set of inherent characteris4cs fulfill
___________.
2. The upper and lower extremes of acceptable varia4on from the mean are called the __________
limits.
3. The odds that a sample’s measurement will be within one standard devia4on of the mean is ____
percent.
4. How is quality related to grade?
5. If the measurements in a frequency distribu4on chart are grouped near the mean in normal
distribu4on, what does that imply about the causes of the varia4on?
6. If you have a set of sample data and you had to calculate the standard devia4on, what are the
steps?
7. If a set of sample measurements has a mean of 100, a normal distribu4on, a standard devia4on of 2,
and control limits of 94 and 106, what percentage of the samples are expected to be between 94
and 106? Explain your answer.
Using Sta4s4cal Measures
Choose two groups of people or items that have a measurable characteris4c that can be compared, such
as the height of adult males and females. Describe the distribu4on of the measurements by sta4ng
whether you think the groups have a rela4vely small or large standard devia4on and whether the
distribu4ons overlap (e.g., some women are taller than some men even though the mean height for men
is greater than the mean height for women). Demonstrate that you know how to use the following terms
correctly in context:
Normal distribu4on
Standard devia4on
Mean
10.2 Development of Quality as a Compe::ve Advantage
LEARNING OBJECTIVES
1. Describe the historical events and forces that led up to today’s emphasis on quality as a compe44ve
requirement.
2. Describe quality awards in Japan and the United States.
3. Describe quality programs and standards such as TQM, Six Sigma, and ISO 9000.
4. Describe and calculate the cost of quality.
Quality management is an approach to work that has become increasingly important as global
cooperation and competition have increased. A review of the history of quality management explains
why it is so important to companies and why clients often require projects to document their processes
to satisfy quality standards.
Sta:s:cal Control Before World War II
Prior to the late 1700s, products such as firearms and clocks were made as individual works where the
parts were adjusted to each other so they could work together. If a part broke, a new one had to be
made by hand to fit. In 1790 in France, Honoré Blanc demonstrated that he could make musket parts so
nearly identical that a musket could be assembled from bins of parts chosen at random.Ken Alder,
“Innovation and Amnesia: Engineering Rationality and the Fate of Interchangeable Parts
Manufacturing in France,” Technology and Culture 38, no 2 (April 1997): 273–311. The practice of
making parts to a high level of accuracy in their dimensions and finishes made the parts
interchangeable. The use of interchangeable parts became the founding principle of assembly line
manufacturing to produce all manner of goods from sewing machines to automobiles. The
manufacturers of firearms and weapons were often the leaders in improving quality because reliable
and safe operation of weapons and their rapid repair is a matter of life and death.
Sta:s:cal Control in the United States During World War II
During World War II, factories were converted from manufacturing consumer goods to weapons. War
plants had to make large numbers of parts as fast as possible while doing it safely for the workers and
for the service members who used them. Important improvements in quality control (QC)—the
management of production standards through statistical interpretation of random product
measurements, which emphasizes consistency and accuracy—were made during this period. A key
figure in the history of quality management who was an important person in the war effort was Walter
Shewhart at Bell Telephone Laboratories. Shewhart recognized that real processes seldom behaved like
theoretical random distributions and tended to change with time. He separated causes of variation into
two categories: chance cause and assignable cause. Chance causes could be ignored if they did not
cause too much variation, and trying to eliminate them often made the problem worse, but assignable
causes could be fixed. To help distinguish between variations caused by random events and trends that
indicated assignable causes, Shewhart introduced the control chart, which is also known as a type of
run chart because data are collected while the process is running. A control chart has time on the
bottom axis and a plot of sample measurements. The mean, upper control limit, lower control limit,
and warning lines that are two sigma from the mean are indicated by horizontal lines.
Control Chart Shows Produc:on Varia:on of Gasoline
The refinery quality control manager takes samples each day of the 87 octane gasoline for twenty
days and charts the data on a control chart, as shown below.
Figure 10.6
Control Chart Displaying Variations Due to Chance Causes
She recognizes that the highest and lowest measurements are not part of a trend and are probably
due to chance causes. However, the control chart from the next twenty days, as shown below,
indicates an upward trend that might be due to an assignable cause. She alerts the process manager
to let him know that there is a problem that needs to be fixed before the product exceeds the upper
control limit. This might indicate the need to initiate a project to fix the problem.
Figure 10.7
Control Chart Displaying Variations That Might Be Due to an Assignable Cause
Deming and Postwar Japan
The most influential person in modern quality control was an American who was a hero in Japan but
virtually unknown in the United States. W. Edwards Deming worked with Shewhart at Bell Labs and
helped apply Shewhart’s ideas to American manufacturing processes during World War II. Following
the war, American factories returned to the production of consumer goods. Many of the other major
manufacturing centers in the world had been damaged by bombing during the war and took time to
recover. Without the safety needs of wartime and with little competition, quality control was not a high
priority for American companies.John Dowd, “How the Japanese Learned to Compete,” Asia Times,
October 27, 2006, http://www.atimes.com/atimes/Japan/HJ27Dh01.html (accessed August 11, 2009).
Management in the United States focused on increasing production to meet demand and lowering costs
to increase profits.
After the war, while the United States occupied Japan, Deming was asked by the U.S. Department of
the Army to assist with the statistics of the 1950 census in Japan. Kenichi Koyanagi, the managing
director of the Union of Japanese Scientists and Engineers and a very influential industrialist, asked
Deming to speak to twenty-one top industrial leaders on the topic of global strategy for Japanese
industry. Deming went beyond Shewhart’s work and talked about his philosophy of quality
manufacturing and how the responsibility for quality begins with management. He explained that a
corporate culture devoted to producing high-quality products would result in less waste, lower costs,
greater client loyalty, and greater market share. With Koyanagi’s support, Deming’s ideas were widely
adopted by these influential leaders.
Deming described his philosophy as a system of profound knowledge, which has four parts:
1. Appreciation of a system. Understanding how suppliers, producers, and clients interact
2. Knowledge of variation. Understanding statistical variation
3. Theory of knowledge. Understanding what can be known and what cannot
4. Knowledge of psychology. Understanding human nature
In 1950, the Japanese created the Deming prize in Deming’s honor, which is awarded to an individual
and a company for major advances in quality improvements. In 1960, Deming was awarded the Order
of the Sacred Treasure, Second Class by the Prime Minister on behalf of Emperor Hirohito.
Quality Management in America
By the 1970s, Japanese companies had a reputation for high quality and were taking market share from
American companies, but Deming’s teachings were virtually unknown in his own country. It was not
until 1980 that America became aware of Deming when his work was described in an NBC
documentary titled If Japan Can, Why Can’t We?John Dowd, “How the Japanese Learned to
Compete,” Asia Times, October 27, 2006, http://www.atimes.com/atimes/Japan/HJ27Dh01.html
(accessed August 11, 2009). By then, Deming was eighty years old and the producer of the show
originally assumed he was dead.Thomas J. Boardman, “The Statistician Who Changed the World: W.
Edwards Deming, 1900–1993,” The American Statistician 48 (August 1994): 179–87.
In 1982, Deming’s book was published and later retitled Out of Crisis, in 1986.W. Edwards Deming,
Out of the Crisis (Boston: MIT Press, 1982). It was aimed at explaining his system to American
manufacturers and the American public. In the book, Deming described fourteen principles of
management to guide the implementation of his philosophy. Some of them were challenges to Western
managers and very different from the thinking that was prevalent at the time. In brief, they are as
follows:
1. Create constancy of purpose toward improvement of product and service.
2. Adopt a new philosophy. We are in a new economic age. Western management must awaken to the
challenge, learn their responsibilities, and take on leadership for a change.
3. Cease dependence on inspection to achieve quality. Eliminate the need for inspection on a mass
basis by building quality into the product in the first place.
4. End the practice of awarding business on the basis of price tag. Instead, minimize cost. Move
toward a single supplier for any one item, on a long-term relationship of loyalty and trust.
5. Improve constantly and forever the system of production and service to improve quality and
productivity and thus constantly decrease costs.
6. Institute training on the job.
7. Institute leadership. The aim of supervision should be to help people and machines and gadgets to
do a better job. Supervision of management is in need of overhaul, as well as supervision of
production workers.
8. Drive out fear, so that everyone may work effectively for the company.
9. Break down barriers between departments.
10. Eliminate slogans, exhortations, and targets for the workforce asking for zero defects and new
levels of productivity.
11. Eliminate work standards (quotas) on the factory floor. Substitute leadership.
12. Remove barriers that rob the hourly worker of his right to pride of workmanship.
13. Institute a vigorous program of education and self-improvement.
14. Put everybody in the company to work to accomplish the transformation. The transformation is
everybody’s job.
Between 1979 and 1982, Ford Motor Company lost $3 billion, and they were looking for solutions to
their problems. They chose to apply Deming’s approach to develop the new Taurus-Sable model and by
1986 had become the most profitable American auto company.Gabor, A. (2001, June 13). Quality
revival, Part 2: Ford embraces Six Sigma. New York Times (Late Edition (east Coast)), p. C.5. Retrieved
October 24, 2010, from ProQuest National Newspapers Core. (Document ID: 74042886).
Ford adopted a Japanese approach to quality known in America as total quality management
(TQM). TQM in Japan has four major components:
1. Kaizen. Improvement must involve all members of a company.Encyclopedia Britannica, s.v. “Total
Quality Control,” http://www.britannica.com/EBchecked/topic/1387304/Total-Quality-Control
(accessed August 13, 2009).
2. Atarimae hinshitsu. Make things work the way they are supposed to work.NationMaster.com,
“Miryokuteki Hinshitsu,” 2005, http://www.statemaster.com/encyclopedia/Miryokuteki-Hinshitsu
(accessed August 14, 2009).
3. Kansei. Learn from the way a user applies the product to make improvements.WASEDA
University, “Kansei Quality” (accessed June 20, 2010).
4. Miryokuteki hinshitsu. Things should have an aesthetic quality and be pleasing to
use.NationMaster.com, “Miryokuteki Hinshitsu,” 2005,
http://www.statemaster.com/encyclopedia/Miryokuteki-Hinshitsu (accessed August 14, 2009).
According to Peter B. Petersen,Peter B. Petersen, “Total Quality Management and the Deming
Approach to Quality Management,” Journal of Management History 5, no. 8 (1999): 468–88. TQM
differs from the Deming approach in four fundamental ways:
1. The Deming approach represents one philosophy that is used in its entirety or not at all. In
contrast, TQM can be tailored to a particular environment.
2. Both agree that a long-term commitment is required by top management. However, Deming would
drop clients if they started to wane, while TQM consultants were less demanding.
3. Deming insists on constancy of purpose, while TQM adapts to the situation, which results in lack of
constancy.
4. Deming requires adoption of his principles of profound knowledge, while TQM lacks this unified
philosophy.
Many poorly qualified consulting firms provided training in TQM to American companies. The
approach worked in some cases but not in others where it was applied superficially, and the
movement’s credibility was diminished.
Another approach to quality management in the United States was formulated at Motorola in 1986 and
was named Six Sigma (6σ). The Six Sigma practices were based on Deming’s work, TQM, and others
and had similarities regarding continuous efforts at improvement involving everyone at the company. It
emphasized a clear focus on achieving quantifiable financial returns from any Six Sigma project. To
determine the financial return on a quality initiative, the cost of quality (COQ) must be determined.
The cost of quality has two parts: the cost of prevention and the cost of failure (or nonconformance).
The cost of quality is the sum of the cost of prevention and the cost of failure. If spending more on
prevention reduces the cost of failure by an even greater amount, the total cost of quality is reduced.
Cost of prevention
a. Cost of conformance. Cost to improve quality
b. Cost of appraisal. Cost to measure and evaluate quality
Cost of failure
a. Internal costs. Repairing bad parts before shipment or retooling a manufacturing line to reduce
failures
b. External costs. Managing returns, lawsuits, product recalls
Six Sigma identified individuals as experts in quality and awarded titles like Champion and Master
Black Belt. The name Six Sigma refers to a process that has six standard deviations from the mean to
either control limit that would ensure virtually zero defects. (In practice, the Six Sigma approach allows
for a 1.5 sigma drift, so it is really a 4.5 sigma standard that allows approximately 3.4 defects per million
products.) This approach was adopted by Jack Welch at General Electric with great success. By the late
1990s, about two-thirds of the top five hundred companies in the United States had begun Six Sigma
projects, including Ford, which had allowed its quality programs to slip. To provide encouragement and
a consistent standard, the U.S. government created the Malcolm Baldrige National Quality
Award in 1987 to encourage companies to improve quality; the award was named for Malcolm
Baldrige who was the U.S. secretary of commerce from 1981 to 1987.National Institute of Standards and
Technology, “Frequently Asked Questions about the Malcolm Baldrige National Quality Award,”
November 25, 2008, http://www.nist.gov/baldrige/index.cfm (accessed August 14, 2009). The criteria
used to determine award winners are as follows:
1. Leadership of senior executives
2. Strategic planning
3. Customer and market focus
4. Measurement, analysis, and knowledge management
5. Workforce focus
6. Process management
7. Results
Trade and Interna:onal Standards
Trade between countries increased as countries recovered from WWII and began producing consumer
goods. In 1948, the General Agreement on Tariffs and Trade (GATT) established the rules for
international trade in the postwar world. Through years of negotiations based on GATT, the World
Trade Organization (WTO) was created in 1995. The WTO is a negotiating forum where
governments can discuss ways to help trade flow as freely as possible.World Trade Organization,
“Understanding the WTO: Basics,” http://www.wto.org/english/thewto_e/whatis_e/tif_e/fact1_e.htm
(accessed August 14, 2009).
Increases in trade forced companies to improve the quality of their products to compete for clients and
to exchange parts reliably between companies that used parts suppliers. To assist in developing
standards for quality that would be the same between countries, an organization of 158 national
standards groups formed the International Organization for Standardization (ISO), which is
headquartered in Switzerland. For example, a company might require a parts supplier to meet certain
ISO standards if it wants to bid on contracts. There are thousands of ISO standards, and they are
grouped by their numbers. The ISO 9000 group of standards relate to quality:
ISO 9000. Fundamentals and vocabulary for this group of quality standards.
ISO 9001. Standards for evaluating the quality management processes in an organization. It has
five parts:
a. Overall requirements for the quality management system and documentation
b. Management responsibility, focus, policy, planning and objectives
c. Resource management and allocation
d. Product realization and process management
e. Measurement, monitoring, analysis, and improvement
ISO 9004. Ways to extend benefits of ISO 9001 to employees, owners, suppliers, partners, and
society in general. It is a guide for top management for overall quality improvement.
ISO 9011. Guidance for auditing a quality system.
Recommended steps for implementing a quality management system (QMS) are as follows:
1. Fully engage top management.
2. Identify key processes and the interactions needed to meet quality objectives.
3. Implement and manage the QMS and its processes.
4. Build your ISO 9001-based QMS.
5. Implement the system, train company staff, and verify effective operation of your processes.
6. Manage your QMS—focus on client satisfaction, strive for continual improvement.
7. If necessary, seek third-party certification and registration of the QMS, or alternatively, issue a self-
declaration of conformity.International Organization for Standardization, Quality Management
Systems—Fundamentals and Vocabulary (Geneva: ISO Press, 2005), in Project Management
Institute, Inc., A Guide to the Project Management Body of Knowledge (PMBOK Guide), 4th ed.
(Newtown Square, PA: Project Management Institute, Inc., 2008).
KEY TAKEAWAYS
The need for produc4on of safe, reliable weapons that could be mass produced led to use of
methods to assure that parts were manufactured within controlled limits. An early example is the
interchangeable musket parts produced in France in 1790 and, later, the quality control methods
introduced by Shewhart in the United States during World War II.
Following World War II, Japanese companies followed advice from Deming and others to make
quality a top priority for management. Higher-quality products gave Japan a compe44ve advantage
with U.S. consumers that forced U.S. firms to respond with similar quality programs.
The Deming award is given by Japan to companies doing business in Japan for high-quality
standards. Similarly, the Baldrige Na4onal Quality Award is given to U.S. companies and individuals
for their contribu4on to quality.
Total quality management is a flexible program that is adapted from Japanese prac4ces that
emphasize kaizen, par4cipa4on by all; atarimaie hinshitsu, making things work the way they should;
kansei, learning from the way the client uses the product to make improvements; and miryokuteki
hinshitsu, giving products an aesthe4c quality to make them pleasing to use. Six Sigma iden4fies
specialists within the organiza4on and assigns 4tles like Master Black Belt. Each quality project must
evaluate the cost of quality to gain approval.
The Interna4onal Standards Ins4tute devises guidelines for establishing prac4ces. The ISO 9000
group are guidelines for establishing prac4ces that are likely to create quality products.
The cost of quality has two parts: the cost of preven4on and the cost of failure. The cost of
preven4on includes costs to establish quality prac4ces and the costs to verify them. The cost of
failure includes internal costs before the product is sold, such as waste and fixing products, while
external costs include those that occur aker the product is sold, such as returns and lawsuits.
EXERCISES
1. Quality control is very important in the manufacturing of _______ because the safe and reliable
opera4on of those products is a maLer of life and death.
2. The prize for quality in Japan is named aker _________ (last name).
3. The quality program created at Motorola and adopted by Jack Welch at General Electric is
__________.
4. The cost of quality considers the cost of preven4on and the cost of ___________.
5. What is the purpose of having an interna4onal quality standard like ISO?
6. Describe benchmarking.
7. If a quality program costs $10,000 to plan and $50,000 to administer, what is the COQ if the program
reduces waste by $30,000 and returns of bad products by $40,000? Explain how you calculated the
answer.
Balancing Cost of Preven4on to Cost of Failure
Describe a project ac4vity where the cost of preven4on might be much higher than the cost of failure
and unlikely enough to accept the risk of its failure rather than pay the cost of preven4on. Similarly,
describe a project ac4vity where the cost of preven4on is smaller than the cost of failure.
10.3 Relevance of Quality Programs to Project Quality
LEARNING OBJECTIVES
1. Iden4fy the similari4es between process quality management and project quality management.
2. Iden4fy the differences between process quality management and project quality management.
Project quality refers to two distinct aspects of the project. Project quality can refer to the quality of the
product or service delivered by the project. Does the end product meet client specifications? For
example, does a software development project develop a program that performs to the client’s
requirements? A software program that performs the basic work functions but does not integrate with
existing software would not be considered a quality product, as long as the client specified that the
software must interface with existing software.
Project quality can also refer to managing the project efficiently and effectively. Almost any client
specification can be met if the project manager has unlimited time and resources. Recall that high
quality means meeting the requirements for a particular grade while providing value. Meeting project
deliverables within the time and resource constraints is also a measure of project quality. Developing a
project execution plan that matches the complexity level of the project is the most critical aspect in
developing a project plan that meets project specifications within the time frame and at the lowest
costs. These two aspects of project quality have similarities and differences to quality as applied to
parent organizations.
Similari:es
All successful quality programs have (1) a requirement for commitment to quality by all the employees
and their partners and (2) an emphasis on error prevention and client satisfaction. To comply with
TQM, Six Sigma, ISO, or other quality standards required by the client or by the project management
firm, the project manager must engage in quality programs and provide documents that specifically
comply with the quality standards in use. For example, a project is typically required to follow the
parent organization’s work processes related to procurement and document management. Any project
processes that interface with the organization’s quality processes will be required to meet the quality
standards of the organization.
If a large project involves repetitive processes such as welding or pouring concrete, statistical processes
control methods can be used to maintain the quality of the product. These processes control methods
are similar to those used by process managers in the manufacturing environment. The intent is for the
work of the project to meet design specifications. The welding tools and equipment must be sufficient
to perform the welds established in the welding specifications, and the welds must be tested, usually by
an independent tester, to assure the end product meets the design specifications. The civil engineers
design a concrete pour to meet certain criteria that will support a structure. The criteria, detailed in the
design specifications, provide the parameters that the construction crew must meet when pouring the
concrete. On large projects, which sometimes have thousands of welds and hundreds of yards of
concrete to pour, the use of quality control tools and methods are critical to meeting design
specifications
Differences
Because projects are temporary, spotting trends in samples produced by repetitive processes is not as
important as considering quality in the planning of the project. Instead, the project manager must be
able to provide documentation that demonstrates that the correct processes are in place to prevent
quality failures.
The cost of quality (COQ) must be considered in the scope document and the project budget. If the
group or company that is providing the project management is separate from the client, the project
budget will bear the cost of prevention while the client will reap the rewards of avoiding the costs of
failure. If senior management does not recognize the benefit to the organization of reducing cost of
failure by spending more on prevention during the project, the project manager can be placed in the
position of producing a product or service that he or she knows could be of higher quality.
If the cost of quality is not specifically considered and approved by senior management in the scope of
the project, quality might be sacrificed during the project to meet budget goals.
Cost of Quality in an Energy Management System
At a midwestern university, a new building was being built, but it was over budget. To reduce the
cost of the energy management system and avoid a late penalty, the project manager installed a
cheaper energy management system. The less expensive system could not reduce power to the air
circulation fans during peak electrical price periods, and it was not compatible with other campus
systems. Five years after the building was built, when a central control unit was installed to
coordinate building energy consumption, the incompatible system was replaced because it could
not communicate with the central campus energy control system or save as much in electrical costs.
The university did not take the time to specify the quality of the building control system in the
scope statement and was not aware of the implication of the substitution at the time it was made.
As a result, the cost of quality was lower in the prevention category but much higher in the cost of
failure category. Because the parties acted in their own interests instead of the interest of the total
university and quality was not a team effort, waste occurred and total cost increased.
Some separation of responsibility for quality is necessary. For example, if a project is undertaken to
build a facility that makes something, it is important to distinguish between the quality of the work
done by the project team and the quality of the items produced after the project is over. The client
provides specifications for the facility that should result in production of quality products. It is the
client’s responsibility to provide appropriate project requirements that will result in a facility that can
produce quality products. It is the project manager’s responsibility to meet the project requirements.
The project manager must focus on meeting requirements for project activities, but as part of the
quality team, opportunities to improve the quality of the final product should be discussed with the
client. If the final products fail to meet quality standards, someone will be blamed for the failure. It
could be the project manager, even if he or she met all the requirements of the project specified by the
client.
Cost of Preven:on in Safety Training
An electronic parts manufacturer chooses to expand operations and needs to hire and train fifty
employees. It uses its own human resources department to handle the selection and hiring of the
employees, but it contracts with a nearby technical college to provide some of the training. The
technical college is responsible for designing and delivering training on the topic of plant safety
practices. The objective of the training project is to reduce the number of workplace accidents, but
that is not the characteristic by which the quality of the training program is determined because the
rate of accidents for employees who go through the training will not be known until after they have
been employed for months or years. The criteria for determining the quality of the training must be
something that can be controlled and measured by the project manager during the project.
Because projects are time sensitive, meeting activity finish dates is a common characteristic of quality
work on a project that is not typical of a requirement of a process manager.
Timely Delivery Part of Quality
At a remote mining site in South America, the gasoline and diesel fuel must be brought in by truck
over poorly maintained roads to run the trucks and heavy equipment used to set up an ore
processing facility. The vendor for supplying fuel is required to provide fuel in the right grades for
the various vehicles, in the appropriate quantities, and in a timely manner. If fuel of the right type
and grade, with acceptable levels of impurities, is delivered a week after the vehicles have run out of
fuel, the work on the fuel-delivery activity is of low quality.
KEY TAKEAWAYS
Both project and process quality management require commitment from all employees, including
top management. They are both client oriented and preven4on oriented.
Projects are temporary and allow fewer opportuni4es to improve repe44ve processes. Cost of
preven4on is oken part of the project budget, but the cost of failure usually happens aker the
project is completed. This separa4on of costs and benefits can lead to taking short-term savings on
the project at the expense of higher cost of failure aker the project is complete.
EXERCISES
1. How is quality control of a project different from quality control of a manufacturing process?
Cost of Failure aker the Project
Consider a project you have been involved in, in which the cost of preven4on would be part of the
project budget but the cost of failure would be incurred aker the project was completed. Describe why
you think top management would have to be involved to make the best decision for the company.
10.4 Planning and Controlling Project Quality
LEARNING OBJECTIVES
1. Define sta4s4cal measurement terminology.
2. Iden4fy sources of informa4on for the planning process.
3. Iden4fy and describe the techniques for controlling project quality.
4. Describe the results of planning and controlling quality.
High quality is achieved by planning for it rather than by reacting to problems after they are identified.
Standards are chosen and processes are put in place to achieve those standards.
Measurement Terminology
During the execution phase of the project, services and products are sampled and measured to
determine if the quality is within control limits for the requirements and to analyze causes for
variations. This evaluation is often done by a separate quality control group, and knowledge of a few
process measurement terms is necessary to understand their reports. Several of these terms are similar,
and it is valuable to know the distinction between them.
The quality plan specifies the control limits of the product or process; the size of the range between
those limits is the tolerance. Tolerances are often written as the mean value, plus or minus the
tolerance. The plus and minus signs are written together, ±.
Tolerance in Gasoline Produc:on
The petroleum refinery chose to set its control limits for 87 octane gasoline at 86 and 88 octane.
The tolerance is 87 ± 1.
Tools are selected that can measure the samples closely enough to determine if the measurements are
within control limits and if they are showing a trend. Each measurement tool has its own tolerances.
For example, if a machine is making rods whose diameters should be 10 mm ± 0.01 mm, you need a
measuring device that can accommodate a rod that is 10 mm wide but can measure that width to a
much smaller tolerance than 0.01 mm, such as 0.001 mm.
The choice of tolerance directly affects the cost of quality (COQ). In general, it costs more to produce
and measure products that have small tolerances. The costs associated with making products with small
tolerances for variation can be very high and not proportional to the gains. For example, it might
double the manufacturing cost to improve a process from a 4 σ to a 5 σ (lower tolerances from 25
percent of control limits to 20 percent), which might only reduce the number of parts that are out of
control from 4 per 100,000 to 6 per 10 million (see Figure 10.4 "Meaning of Sigma Levels"). The cost of
failure of only 4 parts per 100,000 might be much less than the cost of prevention.
Defining and Mee:ng Client Expecta:ons
Clients provide specifications for the project that must be met for the project to be successful. Meeting
project specifications is one definition of a project success. Clients often have expectations that are
more difficult to capture in a written specification. For example, one client will want to be invited to
every meeting of the project and will then select the ones that seem most relevant. Another client will
want to only be invited to project meetings that need client input. Inviting this client to every meeting
will cause unnecessary frustration. Listening to the client and developing an understanding of the
expectations that are not easily captured in specifications is important to meeting the client’s
expectations.
Project surveys that capture how the client perceives the project performance provide the project team
with data that is useful in meeting client expectation. If the results of the surveys indicate that the client
is not pleased with some aspect of the project, the project team has the opportunity to explore the
reasons for this perception with the client and develop recovery plans. The survey can also help define
what is going well and what needs improved.
Sources of Planning Informa:on
Planning for quality is part of the initial planning process. The early scope, budget, and schedule
estimates are used to identify processes, services, or products where the expected grade and quality
should be specified. Risk analysis is used to determine which of the risks the project faces could affect
quality.
Techniques
Several different tools and techniques are available for planning and controlling the quality of a project.
The extent to which these tools are used is determined by the project complexity and the quality
management program in use by the client.
Quality Management Methodology
The quality management methodology required by the client is used. The project manager must provide
the documentation the client needs to prove compliance with their methodology. There are several
different quality management methodologies, but they usually have characteristics that are similar to
the ones described previously in the text.
Flowchar:ng
Many processes are more complicated than a simple sequence of related events that include several
different paths. A flowchart uses standard symbols to diagram a process that has branches or loops.
Diamonds indicate decisions, and arrows indicate the direction of the flow of the process, as shown in
Figure 10.8 "Flowchart of a Quality Control Process".
Figure 10.8 Flowchart of a Quality Control Process
The process used to plan and assess quality can be described using flowcharts. They are useful for
communicating processes that have logical branches that can be determined by simple yes or no
questions. Flowcharting is also useful for discovering misunderstanding in project roles and
responsibilities and communicating responsibility for work processes.
Benchmarking
When products like shoes were made by hand, artisans would seek some degree of standardization by
marking standard lengths for different parts of the product on their workbench. In modern
management practice, if a particular method or product is a standard of quality, comparing your
organization’s quality plan to it is called benchmarking. If a product or service is similar to
something that is done in another industry or by a competitor, the project planners can look at the best
practices that are used by others and use them as a comparison.
Cost-to-Benefit Analysis
Because the cost of prevention is more often part of the project budget, the case must be made for
increasing the project budget to raise quality. Some quality management programs, like Six Sigma,
require that expenditures for quality are justified using a cost-to-benefit analysis that is similar to
calculating the cost of quality, except that it is a ratio of cost of increasing quality to the resulting
benefit. A cost-benefit analysis in some quality programs can take into account nonfinancial factors
such as client loyalty and improvements to corporate image and the cost-to-benefit analysis takes the
form of a written analysis rather than a simple numeric ratio. It is similar to determining the cost of
quality (COQ).
Design of Experiments
Measuring for quality of manufactured products or use of repetitive processes requires taking samples.
Specialists in quality control design a test regimen that complies with statistical requirements to be sure
that enough samples are taken to be reasonably confident that the analysis is reliable. In project
management, the testing experiments are designed as part of the planning phase and then used to
collect data during the execution phase.
Control Charts
If some of the functions of a project are repetitive, statistical process controls can be used to identify
trends and keep the processes within control limits. Part of the planning for controlling the quality of
repetitive processes is to determine what the control limits are and how the process will be sampled.
Cause and Effect Diagrams
When control charts indicate an assignable cause for a variation, it is not always easy to identify the
cause of a problem. Discussions that are intended to discover the cause can be facilitated using a cause-
and-effect or fishbone diagram where participants are encouraged to identify possible causes of a
defect.
Diagramming Quality Problems
For example, a small manufacturing firm tries to identify the assignable causes to variations in its
manufacturing line. They assemble a team that identifies six possibilities, as shown in the fishbone
diagram below.
Figure 10.9
Cause and Effect Diagram
Each branch of the diagram can be expanded to break down a category into more specific items.
An engineer and the electrician work on one of the branches to consider possible causes of power
fluctuation and add detail to their part of the fishbone diagram, as shown below.
Figure 10.10
Possible Causes of Power Fluctuation
Check Sheets, Histograms, and Pareto Charts
When several quality problems need to be solved, a project manager must choose which ones to address
first. One way to prioritize quality problems is to determine which ones occur most frequently. This
data can be collected using a check sheet, which is a basic form on which the user can make a check in
the appropriate box each time a problem occurs or by automating the data collection process using the
appropriate technology. Once the data are collected, they can be analyzed by creating a type of
frequency distribution chart called a histogram. A true histogram is a column chart where the width
of the columns fill the available space on the horizontal axis and are proportional to the category values
displayed on the x axis, while the height of the columns is proportional to the frequency of occurrences.
Most histograms use one width of column to represent a category, while the vertical axis represents the
frequency of occurrence.
Char:ng Electrical Problems
The engineer and electrician place a recording meter on the electrical supply to the manufacturing
area and instruct the building automation system to keep a log of voltage coming into the plant
from the local utility and when it starts and stops large electrical fan motors. They create a check
sheet to track the number of times that power dips or spikes due to lighting strikes or electric space
heater malfunctions. They collect the data, count the number of occurrences in each category, and
then chart the number of occurrences in a histogram, as shown below.
Figure 10.11
Histogram Showing Frequency of Power Problems by Likely Cause
A variation on the histogram is a frequency distribution chart invented by economist Vilfredo Pareto
known as a Pareto chart, in which the columns are arranged in decreasing order with the most
common on the left and a line added that shows the cumulative total. The combination of columns and
a line allows the user to tell at a glance which problems are most frequent and what fraction of the total
they represent.
Using Pareto Chart to Analyze Voltage Problem
The engineer creates a Pareto chart by sorting the data and adds a line to show total problems, as
shown below. He concludes that about half of the electrical voltage problems are caused when one
of the large electrical fan motors on the same circuit as the manufacturing line is shut down to
conserve electricity by the energy management system and then restarted.
Figure 10.12
Pareto Chart with Problems in Decreasing Order and a Line Showing a Cumulative Total
Planning and Control Results
The quality plan is produced during the initiation phase. The methods, procedures, and logic are
described to demonstrate a commitment to a project of high quality. The plan identifies the products or
services that will be measured and how they will be measured and compared to benchmarks. A
flowchart demonstrates the logic and pathways to improve the plan.
During the execution phase, data are collected by measuring samples according to the design specified
in the plan. The data are charted and analyzed. If variations are due to assignable causes, change
requests are created.
KEY TAKEAWAYS
Sta4s4cal control terms that are commonly used are tolerance (the range between control limits),
flowchart (a diagram showing decision branches and loops), benchmarking (comparison to best
prac4ces), fishbone diagram (shows possible causes of quality problems), check sheet (form used to
record frequency of problem occurrences), histogram (column chart that shows frequency of
problems), and Pareto chart (histogram sorted by frequency from highest to smallest with a line that
shows total cumula4ve problems).
The quality planning process uses ini4al scope, budget, and schedule es4mates to iden4fy areas that
need quality management.
Control of quality in repe44ve processes use sta4s4cal control methods that involve designing
tes4ng while considering the cost of quality, taking measurements, and then analyzing the data
using run charts that show control limits and trends. Methodologies are compared to the best
prac4ces by compe4tors, which is called benchmarking. Errors are documented using check sheets
and analyzed using fishbone diagrams, histograms, or Pareto charts.
The products of planning and controlling quality are a quality management plan, data, analysis
documents, and proposals for improvement
EXERCISES
1. The range from the mean to either control limit is the __________.
2. A diagram that shows branches and loops based on decisions is a ____ _____. (two words)
3. The best prac4ces in an industry to which a company can compare its prac4ces are called
___________.
4. What is the difference between a histogram and a Pareto chart?
Quality Management Plan
Consider a project in which you have been involved where there was a quality management plan or
where such a plan was missing. Describe the effect of having or not having such a plan.
10.5 Assuring Quality
LEARNING OBJECTIVE
1. Describe the purpose and methods of quality assurance.
The purpose of quality assurance is to create confidence that the quality plan and controls are working
properly. To assure quality, time must be allocated to review the original quality plan and compare that
plan to how quality is being created during the execution of the project.
Process Analysis
The flowcharts of quality processes are compared to the processes followed during actual operations. If
the plan was not followed, the process is analyzed and corrective action taken. The corrective action
could be to educate the people involved on how to follow the quality plan or to revise the plan.
The experiments that sample products and processes and collect data are examined to see if they are
following statistically valid sampling techniques and that the measurement methods have small enough
tolerances to detect variation within control limits.
Because projects are temporary, there are fewer opportunities to learn and improve within one project
if it has a short duration, but even in short projects, the quality manager should have a way to learn
from experience and change the process for the next project of a similar complexity profile.
Analyzing Quality Processes in Safety Training
The technical college responsible for training employees in safe plant practices evaluates its
instructor selection process at the end of the training to see if it had the best criteria for selection.
For example, it required the instructors to have Masters degrees in manufacturing to qualify as
college instructors. The college used an exit survey of the students to ask what they thought would
improve the instruction of future classes on this topic. Some students felt that it would be more
important to require that the instructors have more years of training experience, while others
recommended that the college seek certification as a training center by the Occupational Safety and
Health Administration (OSHA).Occupational Safety and Health Administration, OSHA Training
Institute Education Center Fact Sheet, July 3, 2007, http://www.osha.gov/dte/oti/index.html
(accessed August 7, 2009). The college considered these suggestions and decided to retain its
requirement of a Masters degree but add a requirement that the instructor be certified by OSHA in
plant safety.
Quality Audit
For additional confidence and assurance, an outside group can come in and review the quality
procedures and accuracy of the data. This process is similar to a financial audit and is called a quality
audit. The purpose of a quality audit is to compare the stated quality goals of the project against the
actual practice and procedures that are used. It is not a certification of the quality of the products
themselves.
KEY TAKEAWAY
The purpose of quality assurance is to build confidence in the client that quality standards and
procedures are being followed. This is done by an internal review of the plan, tes4ng, and revisions
policies or by an audit of the same items performed by an external group or agency.
EXERCISES
1. How is a quality audit different from a quality plan?
Customer Confidence
Consider a product that has suffered from a failure in its quality. Describe how the company handled the
problem and its effect on your personal percep4on of the company and your confidence in buying its
products.
10.6 Exercises
Exercises at the end of the chapter are designed to strengthen your understanding and retention of the
information recently acquired in the chapter.
ESSAY QUESTIONS
Write several paragraphs to provide more in-depth analysis and considera4on when answering the
following ques4ons.
1. Describe the difference between chance cause and assignable cause. How do these terms relate to
Deming’s system of profound knowledge?
2. According to the text, why did the quality of manufactured goods decline in the United States aker
World War II, and how did Japan take advantage of that situa4on?
3. Describe the four Japanese terms used in TQM and give an example of how they might apply to a
par4cular product.
DISCUSSION
The exercises in this sec4on are designed to promote exchange of informa4on among students in the
classroom or in an online discussion. The exercises are more open ended, which means that what you
find might be completely different from what your classmates find, and you can all benefit by sharing
what you have learned.
1. The auto industry has been a highly visible baLleground for interna4onal compe44on in which
quality and the public’s percep4on of a company’s quality have played an important role. Deming
stresses that management is 85 percent of the problem and the solu4on to a company’s quality.
What are specific examples with which you are familiar from the news or personal experience that
demonstrate management leadership (or lack of leadership) toward improving quality.
2. Consider how the four Japanese concepts of quality included in TQM are applied in your educa4onal
ins4tu4on. Based on your experience with the management of your school, does the management
use the principles of kaizen, atarimae hinshitsu, kansei, and miryokuteki hinshitsu? Provide an
example (or counter example) of each.
10.7 Soeware and Technology Exercises
LEARNING OBJECTIVES
1. Predict likely range of values in a normal distribu4on.
2. Recognize assignable and unassignable causes of sta4s4cal varia4on.
Predic:ng Value Ranges Using Standard Devia:on
Real production processes are never perfect. In some cases, a few products that are too small or that do
not work will just cause inconvenience, but in other cases they might be life threatening. Samples of the
production process will show how much variation occurs. If it appears that the variations are
distributed equally above and below the mean (average), it might be assumed that the statistics of a
normal distribution can be used to predict the percentage of products that will be defective when many
of them are produced even if none of the samples are defective.
Some projects are initiated to increase the quality by reducing the variation in production. To
understand the language of statistics and how it is used to justify a project, it is useful to gain a “feel”
for how the distribution of samples is described by the standard deviation. A spreadsheet can be used to
simulate samples of production runs where the mean and standard deviation can be chosen to show
their relationship in a normal distribution. By trying different values for the standard deviation and
observing the effect on the distribution of estimated samples in a chart, you can develop a sense of how
the two are related.
Recall that a standard deviation is called a sigma and represented by the Greek letter σ and the 68-95-
99.7 rule refers to the percentage of samples that will be within one, two, and three standard deviations
of the mean.
Examine a Normal Distribu:on
Complete the exercise by following these instructions:
1. Navigate to the directory location where the exercise files for this unit are located and open
Ch10STD.xls in a spreadsheet program such as MS Excel.
2. In cell A2, replace StudentName with your name.
3. This worksheet is designed to simulate a set of sample values that vary from the mean for random
reasons and form a normal distribution. The data and calculations in columns A through F are
hidden. They are used to calculate the values in column G on which the chart is based.
4. Notice the following features of the spreadsheet:
Column A has bins. In this example, the bins are .1 units wide. The size of the bin and the
horizontal scale of the chart are determined by the value in cell L5.
This simulation uses forty-two bins that are distributed equally above and below the mean. The
mean value can be specified in cell L4.
The usual method is to sample a sequence of products, count the number that fall into each bin,
and then calculate the standard deviation. In this simulation, you can specify the standard
deviation in cell L3, and the percentage of samples that are likely to occur in each bin is
calculated and displayed in column G. The display is rounded to a whole percent. The display of
decimal places can be increased using the spreadsheet’s controls.
The percentage of estimated samples that occur in each bin is charted using a column chart.
The scale at the left side of the chart indicates the percent of the samples in each bin.
5. Compare the chart in the spreadsheet to the chart in Figure 10.13 "Normal Distribution of Gasoline
Samples" that was used in the text. Observe that the standard deviation, σ, is .2 and that almost all
the sample values occur between 86.4 and 87.6—three σ on either side of the mean.
6. Open a word processing document and then save it as Ch10STDStudentName.doc. Switch back to
the spreadsheet and capture the screen. Switch to the word processing document and paste the
screen into the document.
7. Switch back to the spreadsheet. To see the effect of a better production process that would have a σ
of .1 instead of .2, click cell L3. Type .1 and then, on the Formula bar, click the Enter button. The
distribution narrows so that almost all the estimated samples are within .3 on either side of the
mean (87.0), as shown in Figure 10.14 "Normal Distribution with Smaller Standard Deviation".
8. Capture the screen showing in the narrow distribution and paste it into the word processing
document.
9. In the spreadsheet, in cell L3, type .4 and then, on the Formula bar, click the Enter button. Notice
that a larger standard deviation means the distribution is more spread out. Three standard
deviations is 1.2 (3 × .4), so almost all the samples will be within 1.2 on either side of the mean, as
shown in Figure 10.15 "Normal Distribution with Larger Standard Deviation".
10. Capture this screen and paste it into the word processing document.
11. Change the value in cell L3 to 1. Almost all the samples will be above 84 (87−3) and below 90
(87+3), but the horizontal scale is too small to show all the values.
12. Change the value in cell L5 to .3.
13. Capture the screen and paste it into the word processing document.
Use the Spreadsheet for a Different Example
The effects of a lower-than-expected octane rating in a passenger car might be engine knock during
acceleration and less power climbing a hill, but the effect of lower-than-expected octane fuel in a
military aircraft might mean that the plane could not achieve the desired altitude or speed in a critical
situation. Aviation gasoline is designed for use in high-performance engines that require 100 octane
fuel. Use the spreadsheet to examine the estimated distribution of gasoline samples with a different
mean and σ.
Examine a Normal Distribu:on
Complete the exercise by following these instructions:
1. Change the value in cell L4 to 100 and the standard deviation in cell L3 to .1. Notice that a standard
deviation of .1 means that 99.7 percent of the gasoline samples will be between 99.7 and 100.3
octane.
2. Practice changing the mean and standard deviation values in the spreadsheet. Each time you do so,
predict the high and low values that represent three σ above and below the mean and use the
spreadsheet to check your prediction. If the values extend beyond the sides of the chart, increase
the increment value in cell L5.
3. Capture the screen that shows one of your estimates that is different from the examples shown in
the previous steps and paste it into the word processing document.
4. In the word processing document, below the last screen, write between one hundred and two
hundred words to describe what you learned about the relationship between the standard deviation
and the distribution of likely values. Specifically describe how you predict the upper and lower
limits of the range.
5. Close the spreadsheet. Do not save the changes.
6. Save the word processing document as Ch10STDStudentName.doc.
7. Review your work and use the following rubric to determine its adequacy:
Element Best Adequate Poor
File name Ch10STDStudentName.doc
Same or
.docx file
format
Student name missing
Predict likely
range of values
in a normal
distribution
Five screen captures plus a
reflective essay on what you learned
about predicting the upper and
lower limits defined by 3 σ
Same as
Best
Missing pictures;
essay does not
describe how the
upper and lower limits
of 3 σ are calculated
8. Revise the document, if necessary. Save the document and submit it as directed by the instructor.
Recognizing Varia:ons Due to Unassignable and Assignable Causes
W. Edwards Deming teaches that some variation is inevitable due to chance cause. A manager needs to
recognize the difference between variations that are due to chance and those that indicate the presence
of an assignable cause or a trend. If it appears that there is an assignable cause for variation in quality, a
project manager might be required to identify and fix the problem. To communicate with process
managers who are monitoring and sampling production, it is useful to understand the use of control
charts.
A run chart is a type of chart that shows variations from the mean as a function of time. The value of
each sample is plotted to show the day it was taken and how it differs from the mean. If the variation is
random, there will be roughly the same number of points above and below the mean.
A spreadsheet can be used to simulate random variations in production. In this exercise, the
spreadsheet uses its random number function to pick two numbers that are positive and two that are
negative and adds them to the mean. Each number represents a variation that is between the control
limits. Most of the time the positive and negative numbers cancel each other out and result in a sum
that is close to the mean, but occasionally the four random factors add up to values that are far from the
mean.
In this part of the exercise, you observe variations in a run chart and frequency distribution chart that
are due to random effects. You generate the random numbers several times to see what production runs
with random (unassignable) variations look like.
Examine a Run Chart with Random Effects
Complete the exercise by following these instructions:
1. Navigate to the directory location where the exercise files for this unit are located and open
Ch10ControlChart.xls in a spreadsheet program such as MS Excel.
2. Observe that in cells B4 through B23 the RAND function is used to simulate the effects of four
random influences on each day of production for a twenty-day period.
3. Scroll the screen or adjust the zoom so that you can see both charts. See Figure 10.16 "Screen
Adjusted to Show Both Charts".
4. On your keyboard, near the top, press the F9 key. The random functions pick new numbers.
Observe how the samples on the run chart change and how the frequency distribution changes.
5. Press the F9 key several more times until you get a set of samples that are grouped close to the
mean like the example shown in Figure 10.17 "Most Samples near the Mean".
6. Open a word processing document and then save it as Ch10RunChartStudentName.doc. Switch
back to the spreadsheet and capture the screen. Switch to the word processing document and paste
the screen into the document. Your values will differ from those in the figure.
7. According to Deming, it is not productive to hold employees to quality standards that they do not
control. Consider the effect on employee moral if this set of samples was taken as the standard by
which the next run would be judged.
8. Press the F9 key again and stop at a set of samples that has a greater variation, such as the example
shown in Figure 10.15 "Normal Distribution with Larger Standard Deviation".
9. Capture this screen and paste it into Ch10RunChartStudentName.doc. Because of the chance-cause
random factors, this set of data has more variation. If employee performance were punished or
rewarded based on this data, they would become discouraged because they do not control the
quality. Leave both files open.
Examine a Run Chart with Assignable Cause
Complete the exercise by following these instructions:
An assignable cause can be mixed in with the chance-cause random effects. In this part, you introduce a
factor that causes the samples to display a trend. You run the simulation several times to learn how to
recognize a set of data that is a mix of random (chance-cause) factors and a trend that is probably from
an assignable cause.
1. In the spreadsheet, click cell B2. Type .03 and then, on the Formula bar, click the Enter button. The
random functions are recalculated, but each value is increased by .03 over its predecessor.
2. Press the F9 key several times and observe how this trend appears within the samples such as the
example in Figure 10.19 "Trend That Is Probably Due to an Assignable Cause".
3. It is clear that action must be taken soon to prevent the next batch of samples from exceeding the
control limit. The process manager might create a project to identify the assignable cause and take
the necessary action, such as replacing a worn-out piece of equipment. Choose an example where
the upward trend is most apparent. Capture the screen and paste it into the word processing
document.
4. Close the spreadsheet without saving the changes.
5. In the word processing document, below the last picture, write a reflective essay of between one
hundred and two hundred words that describes how you would recognize the difference between
run charts that show assignable and unassignable causes. Discuss the effect on morale if one of the
runs with random values that are close to the mean is chosen as the standard of performance by
which workers would be measured.
6. Leave the word processing document open.
7. Review your work and use the following rubric to determine its adequacy:
Element Best Adequate Poor
File name Ch10RunChartStudentName.doc Ch10RunChartStudentName.docx
Did not
include
name in file
name
Recognize
assignable
and
unassignable
causes of
statistical
variation
Three screen captures that show
two random causes and one
assignable cause; an essay that
describes how to recognize the
difference and the effect on
worker morale if a run with low
random variation is chosen as a
standard
Same as Best
Missing
screen; essay
does not
address both
requirements
8. Save the file and submit it as directed by the instructor.
__MACOSX/._Project Management.pdf
Project Management Homework.docx
Discussion (minimum 400 words total)
· How is defining and meeting client expectations a good measure of quality in a project? (Discuss)
· What is the difference between known and unknown risks in a project?
· What are the major elements in managing project risk?
Use attached PDF file to relate with discussion points.
Attached PDF: Citation:
Licensing Information
This text was adapted by Saylor Academy under a Creative Commons Attribution-NonCommercial-ShareAlike 3.0 License without attribution as requested by the work's original creator or licensor.