Control chart
© 2012 International Institute for Learning, Inc.
DS – 624
Quality Management
© 2014 International Institute for Learning, Inc.
7-00-*
IIL-LSSGB
Learning objectives
- Describe project closure best practices
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
7-00-*
Roadmap – Control Phase
Define
Houston, we
have a problem
Measure
How bad is it?
Analyze
Find the
Root Cause
Improve
Fix it- Eliminate
Root Cause
Control
Make it
stay fixed
Control Plan
Control Charts
Project Close Out
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
This roadmap shows the activities and tools of the Control phase. It is designed to give you a good overview of the main steps in Control.
7-00-*
Closing the Project
Lean Six Sigma Green Belt
7_TP-*
Transition Planning
IIL-LSSGB
Project Closure
Prepare your project report (tell the story and solve the mystery).
How can you acknowledge your team members for their contributions for the project?
How can you celebrate project success?
What lessons did you learn about the process? About working as a team? About the DMAIC process?
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
7-00-*
Learning objectives
- Describe project closure best practices
Lean Six Sigma Green Belt
Introduction to Control
IIL-LSSGB
7-00-*
© 2012 International Institute for Learning, Inc.
Thank you!
© 2014 International Institute for Learning, Inc.
7-00-*
IIL-LSSGB