critical review of articles

profilenjdnoew
Profiling_the_competent_manager.pdf.pdf

Crawford, Lyn, (2000) Profiling the Competent Project Manager. In: Project Management Research at the Turn of the Millenium: Proceedings of PMI Research

Conference, 21-24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute.

COMMONWEALTH OF AUSTRALIA

Copyright Regulations 1969

WARNING

This material has been copied and communicated to you by or on behalf of [The University of Melbourne] pursuant to Part VB of the Copyright Act 1968 (the Act).

The material in this communication may be subject to copyright under the Act. Any further copying or communication of this material by you may be the subject of copyright protection under the Act.

Do not remove this notice.

This notice MUST appear either before or at the same time as the material being communicated appears on the screen. It must also be applied to works which were copied into digital form and made available online before 4 March 2001 if those works are to remain online (in reliance on the Part VB licence) after 4 March 2001.

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

Profiling the Competent Project Manager

Lynn Crawford Director of Program, Project Management

University of Technology, Sydney

Introduction A major concern of the field of project management and a recurring theme in the literature, is that of project success. There are two major strands to this concern – how success is judged (success criteria), and the factors that contribute to the success of projects (success factors). Closely associated with this is concern for the competence of the project manager. On the one hand, the competence of the project manager is in itself a factor in successful delivery of projects and on the other, the project manager needs to have competence in those areas that have the most impact on successful outcomes.

The importance of the project manager in the delivery of successful projects has generated a considerable amount of rhetoric and a smaller body of research based literature dealing with the knowledge, skills and personal attributes required of an effective project manager. With a few notable exceptions, findings have been based on opinions, primarily of project managers.

At the same time, concern for the competence of project managers has fuelled interest in the development of standards and certification processes that can be used for assessment, for recognition and as a guide for development of project management competence. Standards include those relating primarily to what project managers are expected to know, such as the PMBOK® Guide (1996) , the IPMA’s Competence Baseline (1999), and the APMBoK (1996); and standards that address what project managers are expected to be able to do, such as the occupational or performance based competency standards of Australia and the United Kingdom. The process for development of these standards has primarily involved extensive consultation with industry and participation of experienced project personnel in identifying what they consider project managers need to know and to be able to do in order to be effective in delivering successful project outcomes. Some attempt has been made in the standards (ICB and APMBoK) to identify personal characteristics of effective project managers but this has played only a minor role, with the major attention being given to required knowledge and skills rather than personality characteristics and behaviors.

This paper presents a review and analysis of research based literature concerning the criteria by which project success is judged, the factors that contribute to the success of projects; and the knowledge, skills and personal attributes of project managers that are expected to lead to achievement of successful project outcomes. Analysis of data on the project management practices and perceived performance ratings of over 350 project personnel from three countries are then presented. Analysis suggests that there is little direct relationship between perceived performance in the workplace and the level of project management knowledge and experience reported against either project management standards (PMBOK® Guide and Australian National Competency Standards for Project Management) or previous research findings.

Project Success Criteria There is a considerable volume of literature dealing with project success, and this tends to fall into three categories –that dealing primarily with the criteria by which project success is judged; that primarily concerned with the factors contributing to the achievement of success and those that confuse the two.

Although not strongly supported by empirical research, there are many articles that address the issue of project success criteria, including a number of papers presented at the PMI Seminar/Symposium held in Montreal, Canada in 1986 which focused on this theme.

These papers tend to agree on a number of issues. Firstly that project success is an important project management issue; secondly that it is one of the most frequently discussed topics; and thirdly, that there is a lack of agreement concerning the criteria by which success is judged (Pinto and Slevin1988; Freeman and Beale1992; Shenhar, Levy et al.1997; Baccarini1999). A review of the literature further reveals that there is in fact a high level of agreement with the definition provided by Baker, Murphy and Fisher (1988, p. 902), that project success is a matter of perception and that a project will be most likely to be perceived to be an ‘overall success’ (Baker, Murphy et al.1988) if:

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

…’the project meets the technical performance specifications and/or mission to be performed, and if there is a high level of satisfaction concerning the project outcome among key people on the project team, and key users or clientele of the project effort’ (p. 902)

Furthermore, there is general agreement that although schedule and budget performance alone are considered inadequate as measures of project success, they are still important components of the overall construct. Quality appears intertwined with issues of technical performance, specifications, and achievement of functional objectives and it is achievement against these criteria that will be most subject to variation in perception by multiple project stakeholders.

Project Success Factors The work of Murphy, Baker and Fisher (1974), using a sample of 650 completed aerospace, construction and other projects with data provided primarily by project managers, remains the most extensive and authoritative research on the factors contributing to project success. Their work has been cited and used in the majority of subsequent research papers concerning project success. Ten factors were found to be strongly linearly related to both perceived success and perceived failure of projects, while twenty three project management characteristics were identified as being necessary but not sufficient conditions for perceived success (Baker, Murphy et al.1988).

Important work was conducted on project success factors in the 1980’s, notably by Pinto and Slevin (1987,1988) and Morris and Hough (1993). Both studies draw on the research of Murphy, Baker and Fisher (1974) and have been regularly cited in later work. While Morris and Hough (1993) drew primarily on literature and case study analysis of major projects, Pinto and Slevin (1987, 1988) based their findings on the opinions of a usable sample of 418 PMI members responding to questions asking them to rate the relevance to project implementation success of ten critical success factors (Slevin and Pinto1986) and four additional external factors.

Further studies aimed at identifying factors contributing to the success and in some cases, the failure, of projects (Ashley, Lurie et al.1987; Geddes1990; Jiang, Klein et al.1996; Zimmerer and Yasin1998a; Lechler1998; The Standish Group; Whittaker1999; Clarke1995) used methodologies similar to that of Pinto and Slevin, with findings based on ratings or in some cases rankings of success factors by project personnel, general managers or other professionals. Beale and Freeman (1991) identified fourteen variables that affect project success from a review of twenty nine papers. Wateridge (1996) identified eight most often mentioned success factors from a review of literature reporting results of empirical research relating to IS/IT projects.

Using the ten critical and twenty three necessary success factors identified by Baker, Murphy and Fisher (1988) as the starting point, the findings of the twelve other studies listed above were analyzed and compared. Similar factors were grouped and then ranked according to the number of times they were mentioned across the thirteen studies. Factors receiving the least number of mentions were progressively grouped with the most directly related factor receiving a higher number of mentions, and the factors re- ranked. This procedure was conducted iteratively, resulting in the emergence of twenty four success factors. Rankings were based on the number of mentions identified over all thirteen studies, and calculated separately for those studies relating primarily to engineering and construction projects (n=7) vs IS/IT projects (n=6) and for those studies conducted pre-1995 (n=6) and post-1995(n=7). This was done to see whether there was any change in the results concerning the most mentioned project success factors across industries, and with the development and more widespread adoption of project management. 1995 was adopted as the break point as reports published prior to that date primarily related to studies conducted in the 1980’s. The results of this analysis are shown in Exhibit 1.

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

All studies (N=13) E & C (N=7) IS / IT (N=6) Pre 1995 (N=6) Post 1995 (N=7) Planning (Integrative) Planning (Integrative)

Stakeholder Management (Other) Team Development

Strategic Direction Team Selection

Planning (Integrative) Technical performance

Communication Monitoring & Controlling (Integrative) Organizational support Planning (Integrative) Strategic direction Team Selection

Monitoring & Controlling (Integrative) Team Selection Technical Performance

Communication Leadership Monitoring & Controlling (Integrative) Monitoring & Controlling (Risk) Technical Performance

Monitoring & Controlling (Integrative) Planning (integrative)

Leadership Monitoring & Controlling (Integrative) Stakeholder Management(Other) Team development

Leadership Monitoring & Controlling (Risk) Stakeholder Management (Client) Team Development Technical Performance

Communication Leadership Strategic Direction Team Development

Organization Structure Organization Support

Communication Leadership Organizational Support Technical Performance

Communication Monitoring & Controlling (Risk) Organization Structure Strategic Direction Team Selection

Decision Making & Problem Solving Organization Structure Project Definition Task Orientation

Monitoring & Controlling (Risk) Organizational Support Stakeholder Management (Other)

Administration Decision Making & Problem Solving Planning (Specialist – Time) Project Definition Stakeholder Management (Client) Strategic Direction Task Orientation Team Selection

Monitoring & Controlling (Risk) Organization Structure Project Definition Stakeholder management (Client) Team Development

Administration Organizational Support Planning (Specialist – Time) Project Definition

Administration Planning (Specialist – Cost) Planning (Specialist – Time) Stakeholder Management (Other)

Organizational Structure

Closing Cost Closing (Integrative) Monitoring & Controlling (Cost) Monitoring & Controlling (Scope) Monitoring & Controlling (Time) Planning (Specialist – Cost)

Administration Planning (Specialist – cost) Planning (Specialist – Time) Stakeholder Management (Other) Task Orientation

Stakeholder Management (Client) Task Orientation

Closing Cost Closing (Integrative) Monitoring & Controlling (Cost) Monitoring * Controlling (Scope) Monitoring & Controlling (Time)

Project Definition Stakeholder Management (Client)

Closing (Cost) Closing (Integrative) Decision Making Monitoring & Controlling (Cost) Monitoring & Controlling (Scope) Monitoring & Controlling (Time)

Closing (Cost) Closing (Integrative Decision Making & Problem Solving Monitoring & Controlling (Cost) Monitoring & Controlling (Scope) Monitoring & Controlling (Time) Planning (Specialist – Cost)

Exhibit 1: Project Success Factors identified in the literature – ranked by frequency of mention NB Not all 24 literature-derived factors are listed here. In conducting the analysis, the importance of Planning and Monitoring and Controlling at the integrative level, rather than the detailed levels of specialist scope, time, cost, risk and quality planning was a strong and interesting result, with Monitoring and Controlling of risk being the only specialist area to be

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

mentioned within the top three ranking categories. Stakeholder Management (Other) encompasses stakeholder issues external to the parent and client organizations, including environmental and political issues, and it seems intuitively correct that this would rank highly for the success of Engineering and Construction projects. The increase in mention of Communication, Strategic Direction and Team Selection and decrease in importance of Technical Performance, post 1995, are of interest and appear attributable, at least in part, to the application of project management beyond its strong Engineering and Construction origins.

With the possible exception of Organizational Support, Organization Structure and Team Selection, the factors identified in Exhibit 1 call directly upon the competence of the project manager. Although Organizational Support is a factor which can be addressed by people other than the project manager, a competent project manager could be expected to understand that support of the organization is required to enhance the likelihood of project success and use inter-personal and other skills to achieve it. Similarly, the competent project manager can exert influence over the way in which the project team is structured and how it relates to the structure of the parent organization and others. Team Selection draws together factors relating to capability and experience of the project manager and team for the project and is therefore a factor that is directly concerned with project management competence.

This review of research based literature concerning project success factors therefore clearly demonstrates agreement that the competence, or knowledge, skills and attributes of the project manager, are critical to project success.

Project Manager Competence Interest in the role of the project manager and aspects of competence in that role can be traced back to an article by Gaddis in the Harvard Business Review of 1959 (Gaddis1959) and another Harvard Business Review article, by Lawrence and Lorsch, in 1967 on the ‘New management job: the integrator’. Since then, much has been written in project management texts (Kerzner1998; Meredith and Mantel1995; Dinsmore1993; Turner1993; Pinto1998) magazine (Dewhirst1996) and journal articles (Einsiedel1987) about what it takes to be an effective project manager, culminating with Frame’s work on Project Management Competence published in 1999.

The primary research based reports on the subject began to appear in the early to mid 1970’s based on the investigations of Thamhain, Gemmill and Wilemon into the skills and performance of project managers (Cleland and King1988; Gemmill1974; Thamhain and Gemmill1974; Thamhain and Wilemon1977a; Thamhain and Wilemon1978). This research plus work by Posner (1987) in the 1980’s, Gadeken in the early 1990’s (), Ford and McLaughlin (1992) and more recently by Zimmerer and Yasin (1998), and a major literature review based study by Pettersen (1991) constitute the primary research contributions to understanding of project management competence..

As for studies concerning project success factors, research based literature on aspects of project management competence draws primarily upon the opinions of project managers and others concerning the knowledge, skills and personal attributes required by effective project personnel (Posner1987a; Thamhain1991; Ford and McLaughlin1992a; Wateridge1996; Zimmerer and Yasin1998a).

Gadeken’s work (; ; Gadeken1994) is based on critical incident interviews with sixty US and fifteen UK project managers from Army, Navy and Air Force acquisition commands. The findings relate solely to personal attributes with identification of six behavioral competencies that distinguished outstanding project managers from their peers; five demonstrated at a slightly lower level of significance; and seven that were demonstrated but with no significant differences indicated between outstanding and average performers. This remains the most important work on behavioral competencies of project managers but the results should be addressed with some caution due to the focus on both acquisition and the armed forces.

Pettersen (1991) conducted a major literature review concentrating on American texts to develop a list of predictors, defined in task-related terms, intended for use in selection of project managers.

Morris (2000) reports on the work of the Centre for Research in the Management of Projects at UMIST, on behalf of the Association for Project Management and a number of leading UK companies, which focuses on the knowledge required by project managers. Findings are based on interviews and data collection in

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

over one hundred and seventeen companies, seeking their opinion as to the topics they considered project management professionals should know and understand in order to be considered competent.

The same process as outlined for analysis of the research based literature concerning project success factors was applied to the eight studies mentioned above. Respecting the strong links between project success factors and project manager competence, the ten critical and twenty three necessary success factors identified by Baker, Murphy and Fisher (1988) were again used as the starting point. The same twenty four categories or concepts that emerged from the analysis of success factors, emerged from the analysis of findings concerning the knowledge, skills and personal attributes identified as important to effective project management performance. Only one change was made. Organizational Support was re- named Stakeholder Management (Parent Organization) in the list of project manager competence factors.

The project management competence factors were ranked according to the number of mentions identified over the eight selected studies, and separately for those studies conducted pre-1995 (n=4) and post- 1995(n=4). A breakdown for Engineering and Construction vs IS/IT is not provided as there were only two studies that related directly to IS/IT. 1995 was adopted as a break point as reports published prior to that date primarily related to studies conducted in the 1980’s or very early 1990’s. The results of this analysis are shown in Exhibit 2.

All Factors (N=8) Pre 1995 Factors (N=4) Post 1995 Factors (N=4) Leadership Planning (Integrative) Team Development

Leadership Planning (Integrative) Strategic Direction Team Development Technical Performance

Leadership Monitoring & Controlling (Integrative) Planning (Integrative) Team Development Communication

Communication Technical Performance

Communication Decision Making & Problem Solving Stakeholder Management (Parent Organization)

Stakeholder Management (Parent Organization) Technical Performance Organization Structure Project Definition

Organization Structure Stakeholder Management (Parent Organization) Strategic Direction

Monitoring & Controlling (Integrative) Monitoring & Controlling (Cost) Monitoring & Controlling (Scope) Monitoring & Controlling (Time) Organization Structure Stakeholder Management (Client) Team Selection

Administration Stakeholder Management (Client) Stakeholder Management (Other) Decision Making & Problem Solving Monitoring & Controlling (Cost) Planning (Specialist – Cost) Planning (Specialist – Time) Strategic Direction

Monitoring & Controlling (Integrative) Administration Monitoring & Controlling (Risk) Planning (Specialist – Time) Project Definition Stakeholder Management (Other)

Team Selection Closing (Integrative) Monitoring & Controlling (Quality) Monitoring & Controlling (Risk) Monitoring & Controlling (Scope)

Decision Making & Problem Solving Monitoring & Controlling (Cost) Planning (Specialist – Time) Project Definition Stakeholder Management (Client)

Closing (Integrative) Monitoring & Controlling (Quality)

Monitoring & Controlling (Time)

Exhibit 2: Project Manager Competence identified in the literature – ranked by frequency of mention NB Not all 24 literature-derived factors are listed here

It is interesting to note that Leadership, a factor that relates almost exclusively to personality characteristics or personal attributes, appears consistently in the highest ranking category amongst Project Manager Competence factors, whereas it appeared no higher than the second ranking category for Project Success Factors. Similarly, Team Development appears consistently in the first ranking category for Project Manager Competence factors, but fell as far as fourth ranking in one case for Project Success factors. Communication and Technical Performance are consistently stronger for Project Manager Competence than for Project Success factors. Planning (Integrative) is clearly a strong factor, as it appears

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

consistently in the first ranking for both Project Success Factors and Project Manager Competence factors. It is interesting to note that the increased ranking of Monitoring and Controlling (Integrative) that appears in the post 1995 studies of Project Success Factors is supported by post 1995 studies of Project Manager Competence factors indicating an increased concern for control.

Project Management Standards Concern for the competence of project managers in successfully delivering projects is evidenced not only through research into project success and various aspects of project management competence, but through the development of standards which can be used to guide the development and assessment of project personnel.

Standards relating to aspects of project management competence fall into two main areas – those relating to what project managers are expected to know, represented by project management body of knowledge guides; and those relating to what project managers are expected to be able to do, which primarily take the form of performance based or occupational competency standards.

There are three widely accepted Project Management Knowledge Standards

• PMBOK® Guide – Project Management Institute (Duncan1996) • ICB: IPMA Competence Baseline – International Project Management Association (IPMA1999) • APM BoK / CRMP BoK – Association for Project Management (UK) (Morris2000; )

Of these, the PMBOK® Guide is the most widely recognized and accepted, with nearly 300,000 copies distributed worldwide. It was approved as an American National Standard (ANSI/PMI 99-001-1999 on 21st September 1999. It defines nine knowledge areas within project management, and claims to identify and describe ‘that subset of the PMBOK that is generally accepted’ (Duncan1996), providing a ‘consistent structure’ for the professional development programs of the Project Management Institute including (p. 4) • Certification of Project Management Professionals (PMPs) • Accreditation of degree-granting educational programs in project management

The PMBOK® Guide, which in it’s current form was published in 1996, was developed through a process of consultation, ‘written and reviewed by a global network of project management practitioners, working as volunteers’ (Project Management Institute1999).

Performance based competency standards describe what people can be expected to do in their working roles, as well as the knowledge and understanding of their occupation that is needed to underpin these roles at a specific level of competence. The first generic performance based competency standards for project management were the Australian National Competency Standards for Project Management which were developed through the efforts of the Australian Institute of Project Management and endorsed by the Australian Government on 1st July 1996. In the United Kingdom, the Occupational Standards Council for Engineering produced standards for Project Controls () which were endorsed in December, 1996 and for Project Management () which were endorsed in early 1997. The Construction Industry Standing Conference (CISC), the Management Charter Initiative (MCI) and what was then called the Engineering Services Standing Conference (ESSC), now the Occupational Standards Council for Engineering (OSCEng), developed Level 5 NVQ/SVQ competency standards for Construction Project Management. A section of the Management Charter Initiative Management Standards, titled Manage Projects (MCI1997) provides a further set of competency standards for project management but in this case, within the general management framework.

Of these standards, the Australian National Competency Standards for Project Management and the OSCEng standards for both Project Management and Project Controls have attracted the most interest. However, the Australian standards, which follow the same structure as the PMBOK® Guide and use the Guide as a knowledge base, have attracted the most global interest.

The Australian Standards were developed over a three year period, commencing in 1993, culminating in the endorsement of the standards by the Australian Government in 1996. Development was carried out by a consultant working under the guidance of a Steering Committee and Reference Group representing over 50 Australian organizations. The standards development process is well documented (Gonczi, Hageret al.1990; Heywood, Gonczi et al.1992) and requires the examination of existing information about the

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

occupation and analysis of the purpose and functions of the profession and the roles and activities of its members (Heywood, Gonczi et al.1992) in order to derive the Units and Elements of Competency that provide the structure for the standards. There are nine Units in the standards, described at Levels 4, 5 and 6 as shown below (Exhibit 3):

LEVEL 4 LEVEL 5 LEVEL 6 UNIT 1 Not applicable at Level 4 Guide Application of Project

Integrative Processes Manage Project Integration

UNIT 2 Apply Skills in Scope Management

Guide Application of Scope Management

Manage Scope

UNIT 3 Apply Skills in Time Management

Guide Application of Time Management

Manage Time

UNIT 4 Apply Skills in Cost Management

Guide Application of Cost Management

Manage Cost

UNIT 5 Apply Skills in Quality Management

Guide Application of Quality Management

Manage Quality

UNIT 6 Apply Skills in Human Resources Management

Guide Application of Human Resources Management

Manage Human Resources

UNIT 7 Apply Skills in Communications Management

Guide Application of Communications Management

Manage Communications

UNIT 8 Apply Skills in Risk Management

Guide Application of Risk Management

Manage Risk

UNIT 9 Apply Skills in Procurement Management

Guide Application of Procurement Management

Manage Procurement

Exhibit 3: Units in the Australian National Competency Standards for Project Management NB Level 4 of the standards does not include the Unit relating to Integrative Processes.

Research Methodology As outlined above, both the research based literature on project management competence, and standards that have been developed to define aspects of project management competence, have been developed primarily from the collective opinion of project management practitioners and others as to what project personnel need to know and what they need to be able to do in order to be considered competent.

The assumption behind the development and use of project management standards is that the standards describe the requirement for effective performance of project management in the workplace and that those who meet the standards will therefore perform, or be perceived to perform, more effectively than those whose performance does not satisfy the standards. To date, no research has been conducted to validate this assumed positive relationship between project management competence as described in the literature and assessed against standards, and perceptions of effective performance in the workplace.

Using two recognized project management standards as described above, • the Guide to the Project Management Body of Knowledge (PMI, 1996) and • the Australian National Competency Standards for Project Management (AIPM, 1996) data was collected to explore the relationship between performance against project management standards, and perceived performance in the workplace.

Five instruments were used in data collection. One instrument was used to gather general demographic information about respondents and their project management role. Two instruments were used to collect information on project management knowledge and practices of participants: 1. A knowledge test, using multiple choice questions drawn from sample PMP exams, with five

questions for each of the nine PMBOK® Guide knowledge areas 2. A self assessment against the nine units of the Australian National Competency Standards for Project

Management with responses against a five point scale from 1 – I have never done or participated in doing this, to 5 – I have done or managed this across multiple projects or sub-projects.

Two instruments were used to gather information on perceived effectiveness of project management performance: 1. A self rating questionnaire 2. A supervisor rating questionnaire

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

Based on review of the project success criteria literature, the self and supervisor rating questionnaires had two sections. The first was intended to address the issue of perceived success according to differing stakeholder perspectives, seeking ratings of the participating project personnel on a 1 to 5 scale of perceived value to clients, value to their organization, effectiveness of relationships in achieving project goals, and ability to inspire and encourage the performance of others. The second section comprised five questions on project completion, requiring ratings on a 1 (Always) to 5 (Never) scale according to perceptions of completion of projects on time, on budget, achieving goals, satisfying end users and using recognized project management methodologies.

A deficiency of the perceived performance rating instruments was that information was only sought from the participant and their supervisor (or suitable equivalent). Ideally feedback would also have been sought from other stakeholders, such as clients, but this was beyond the achievable scope of the study. Another problem encountered was in securing completed rating forms from supervisors. Subsequently, although the supervisor rating appears to be a more reliable indicator than the self rating form, responses are not available for all participants. Difficulties in obtaining supervisor ratings highlighted an interesting dimension of the project manager role. In a number of cases, organizations claimed that there was no-one in a position to rate the performance of the participating project personnel.

It must also be noted that the standards do not directly address two important factors identified in the literature review, namely Leadership, drawing primarily on personality characteristics, and Technical Performance, which tends to be application area specific and is therefore not directly addressed in generic standards.

The sample for the study was obtained by asking organizations in Australia, the United Kingdom and the United States to identify between five and twenty of their project personnel to participate in the study. Data collection was conducted on the premises of participating organizations

The demographics of the study group are summarized in the table of age vs. gender (Exhibit 4). Reluctance on the part of respondents to provide either age or gender or both has reduced the usefulness of these variables for analysis.

25-29 30-39 40-49 Over 50 Missing Total Male 4 14 29 11 49 107 Female 15 9 2 12 38 Missing 4 7 30 15 152 208 Totals 8 36 68 28 213 353 Exhibit 4: Demographics of sample – age vs gender

The industry sector of organization and regional location of the study group is shown in Exhibit 5. As the research was funded by an Australian Research Council grant in Australia, the Australian sample is the largest and best distributed. Engineering and Construction organizations in the United States were reluctant to participate in the study, largely due to the time commitment required.

Industry Sector of Organisation Australia USA UK Total IS/IT & Telecomms. 59 39 19 117

E & C 105 50 155 Business Services 46 28 7 81

Total 210 67 76 353 Exhibit 5: Industry sector of organization by Region

Self and Supervisor Ratings – Perceived Performance Competence is a socially constructed concept (Burgoyne1993) and studies which have endeavored to identify high performance competencies (Boyatzis1982; Schroder1989; ; Cockerill1989) have encountered difficulties in identifying the best or most effective performers. As a measure of job performance, Boyatzis (1982), in his study of general managers, suggests three types of performance or criterion measure: • Supervisory nominations or ratings

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

• Peer nominations or ratings • Work-output measures Supervisory ratings are, of course subjective, and it is recognized that subjective measures are excessively prone to contamination, especially by supervisor bias (Campbell1990). However, Nathan and Alexander (Nathan and Alexander1988) conclude that objective measures are not more predictive than subjective measures. The most important issues appear to be awareness of the potential construct validity threats of any measure used (Bommer, Johnson et al.1995) and recognition that performance is not a single construct (Campbell1990)

In the field of project management competence and effectiveness, some studies have used a supervisor’s subjective rating of the degree of effectiveness of the project participant under examination. Thamhain and Wilemon (Thamhain and Wilemon1977b) asked superiors to rate project managers relative to their peers on overall project performance on a 0-100 percent scale. Gadeken () having experienced the problem on a previous occasion in his studies of Defense Systems procurement program managers () has explained the dilemma of identifying project management effectiveness:

The first and most difficult step in the job competency assessment process is to identify truly outstanding performers to study. For project managers, this is problematic because there are no clearly objective performance measures that can be applied. Overall assessment of project success and hence project manager success is difficult because of the complexity and extended time duration of most projects. Also many projects are significantly affected by external funding and political factors. Since projects usually involve several project managers over their duration, the current project manager may benefit or suffer from the efforts of his predecessors. Consequently, the only reasonable and acceptable approach for this study was to ask for nominations from senior officials ().

For the purposes of this study, using the results of the self (n=346) and supervisor (n=206) rating instruments, scores were constructed that distinguished individuals who consistently rated themselves to be above the middle on the 1 to 5 rating scale and those whose supervisors consistently rated them in the upper range. Using this scoring, and relating self and supervisor ratings (n=206), 5.83% of the sample were rated as having low perceived performance by both themselves and their supervisors. The majority of the sample, 54.85% rated their performance as high, and this was supported by supervisor ratings. 29.13% of the sample rated themselves high but their performance was considered low by supervisors, and 10.19% of the sample were rated more highly by their supervisors than they rated themselves.

Project Management Knowledge as a predictor of perceived effective performance Investigation of the results on the multiple choice knowledge test using the nine knowledge areas identified in the PMBOK® Guide and related to perceived performance as outlined above, provided no real evidence that more knowledge in these areas lead to greater perceived effectiveness of performance. The study team has plans for further investigation of this relationship. Discussion in this paper will focus on practices

Project Management Practices as a predictor of perceived effective performance Three levels of analysis were applied to the results collected in the self assessment against the Australian National Competency Standards for Project Management. 1. Summary scores were calculated for each of the nine Units in the Australian National

Competency Standards, identifying patterns of use of the practices and then exploring their predictive value relative to perceived effective performance.

2. Summary scores were calculated for literature-derived constructs. 3. Factor analysis was conducted using the 94 items at Performance Criteria level.

Analysis at Unit Level Each of the nine Units in the Australian National Competency Standards for Project Management is made up of a number of elements and performance criteria – Integration (11), Scope (8), Time (9), Cost (9), Quality (11), Human Resource Management (12), Communications (11), Risk (9) and Procurement (14). Data were collected by asking each respondent to indicate, on a 5 point scale, their level of experience in each of the 94 Performance Criteria. The nine Units have good reliability with Cronbach’s Alpha ranging from 0.8384 for Integration to 0.9494 for Procurement. From investigation of patterns of use of practices,

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

the spread for use of Integration, Scope, Time, Cost and Communications practices is fairly evenly distributed across the sample. Quality, Human Resource Management and Risk practices are not evenly distributed, with fewer people using practices in these Units, than those who do. Procurement is particularly interesting. There are some who use procurement practices extensively, some who don’t appear to become involved in procurement practices at all and others in the middle range.

Exploration indicated that use of practices grouped in these nine Units does not provide a good predictor for distinguishing between those who will be rated as performing effectively or less effectively. A logistic regression model was fitted to investigate further but there was no significant prediction found from any variable. Quality is the only one of the nine items for which there is an apparent distinction between the perceived high and low performers. Those perceived as less effective performers have slightly more experience in use of Quality practices. Quality results also provide an opportunity to demonstrate an overall tendency for the supervisor scores to be different between countries. The distinction is particularly marked between the UK and the rest, interpretable as a cultural difference where in the UK being understated and ‘objective’ is valued more highly. The boxplot below (Exhibit 6) displays this difference, which is apparent in two ways. Firstly, the UK supervisors split the group almost equally into good and poor performers, whereas in the other countries there are many fewer assessed poor performers. Secondly, the effect of higher Quality scores associated with being assessed as a poor performer is almost entirely a result of the UK results.

at least 5 N items s

.00

1.00 324657 32733N =

Country

UK & EuropeUSAAustralia

Q ua

lit y

av er

ag e

4.5

4.0

3.5

3.0

2.5

2.0

1.5

1.0

.5

Exhibit 6: Quality Scores by Region

Analysis based on literature-derived constructs Each of the 94 performance criteria against which data were collected were grouped according to the literature-derived constructs presented in Exhibit 2. A reliability analysis was conducted, identifying those constructs that had a reasonably high value (above 0.80) for Cronbach’s alpha. Only a few of the more interesting constructs will be discussed here.

Planning (Integrative) (alpha=0.8319) Use of this group of practices, considered in the first rank of importance according to the literature analysis (Exhibit 2), shows that there is a tendency for all self-assessed high performing individuals to have a higher rating on the Planning (Integrative) scale. However, there is a reverse tendency for UK supervisors to rate individuals worse if they have a high rating on this scale.

Monitoring & Controlling (Integrative) (alpha=0.9005) This variable represents a consistent construct, based on 11 items. While most people are engaged with it, the variable does not appear to make consistent distinction between those perceived as good or poor performers.

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

Monitoring & Controlling (Risk) (alpha=0.9024) This is a very reliable construct, even though it is only based on four items. However, the sample is divided between those who use risk management practices and those who don’t. There is a tendency for higher scores on this item to be associated with higher self-rating of success. On the other hand, it does not appear to be associated with higher supervisor ratings.

Team Development (alpha=0.8974) There is a very small group scoring highly on this scale, and quite a large group scoring well below 2.5 indicating that there are many people who are not using these practices. This is interesting given the high ranking this construct received based on the literature. Again, cultural differences emerge, with a tendency for those in the USA who self assess poorly, to be higher uses of Team Development practices. This lends itself to speculation that those who actively engage in Team Development practices are more willing to critically self assess their performance. In the US higher supervisor scores on this item are connected with higher use of practices, but this is not the case in Australia and the United Kingdom.

Lessons Learned (alpha=0.9351) Despite considerable rhetoric concerning the importance of capturing, sharing and utilizing lessons learned, this construct does not appear in the results of the literature review. This may be a result of focus, in research and literature, on management of single projects. More recently interest has been widened to consideration of organizational project management and multi-project contexts (Engwall and Kallqvist1999; Turner and Keegan2000) and further research in this area may justify inclusion of lessons learned as a required area of project management competence. As it stands, there are a number of performance criteria in the Australian National Competency Standards for Project Management that relate to lessons learned and which could not be grouped with variables identified from the research based literature. It is interesting however, that this is a very reliable construct, based on 14 items, but that most people score low on this scale. In other words, most project management personnel in the sample do not use lessons learned practices. Furthermore, this construct is not consistently associated with higher self rating although there is some evidence that it is more highly valued in Australia and the United Kingdom than in the United States.

Literature-derived constructs as predictors of perceived effective performance Models were fitted, using combinations of the variables derived from the literature review, and logistic regression. The variables involved in the best prediction were Monitoring & Controlling (Integrative), and Stakeholder Management (Parent Organization) (alpha=0.7258). The effect of Monitoring & Controlling (Integrative) is that a higher score in use of practices increases the odds in favor, while a higher score in Stakeholder Management (Parent Organization) decreases the odds in favor of self-assessment as an effective performer.

Using supervisor ratings, the literature-derived ratings involved in the best predictive model were Communication and Quality. The effect of a higher score on Communication is to slightly increase the odds in favor of perceived effective performance, while the effect of a higher score on Quality is to reduce the odds of being perceived as an effective performer.

The difference between Regions was also highly significant in the model using supervisor ratings. If you came from the United States, you were over twice as likely to be assessed as good by your supervisor than if you came from the United Kingdom. There was much less difference between Australia and the United Kingdom.

Factor analysis using the 94 items at Performance Criteria level. Factor analysis extracted 15 factors (with an eigenvalue greater than 1) from the 94 Performance Criteria in the Australian National Competency Standards for Project Management. Of the ten that were easily interpretable, all except two essentially replicated the basic structure of the competency standards. Two, however, were different and one is equivalent to Lessons Learned. In summary: Factor 1: Grouped all of the Performance Criteria relating to Cost with those relating to Procurement Factor 2: All items in Human Resource Management, plus Item 9.1.1 which relates to identification of procurement requirements in association with stakeholders and higher project authors. Factor 3: All items relating to Lessons Learned. Factor 4: A variety of Performance Criteria, strongly suggestive of the Planning (Integrative) construct. Factor 5: All Performance Criteria in the Unit: Risk.

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

Factor 6: All items in the Unit: Quality Factor 7: All items in the Unit: Time Factor 8: All items in the Unit: Cost Factor 9: Most items in the Unit: Communications except 7.3.3 which deals with customer relationships Factor 10: Those items of the Unit: Scope, not included under Factor 4. This factor leans towards Monitoring and Controlling.

Conclusions The competence of project managers is clearly a vital factor in the success of projects, yet it remains a quality that is difficult to quantify. The majority of research and standards development conducted to date relating to project management competence is based on the opinions of project management practitioners and others. The research reported here has attempted to approach the profiling of the competent project manager from a potentially more objective viewpoint, by gathering data on project management knowledge and practices, using established project management standards, and then relating this to separately derived ratings of perceived workplace performance. Analysis suggests, however, that there is little direct relationship between perceived workplace performance and performance against either project management standards or previous research findings. An interesting area for further research is the effect of cultural differences and other contextual issues on perceptions of performance. Personality characteristics and application area specific technical issues are not addressed by the standards, suggesting a need for further investigation in these areas.

References APM (UK). 1996. Body of Knowledge. Version 3.0 Association of Project Managers Ashley, David B., Lurie, Clive S. and Jaselskis, Edward J. 1987. Determinants of construction project success. Project Management Journal XVIII (2):69-79. Baccarini, David .1999. The logical framework method for defining project success. Project Management Journal 30 (4):25-32. Baker, Bruce N., Murphy, David C. and Fisher, Dalmar . 1988. Factors affecting project success. In: Cleland, David I. and King, William R., (Eds.) Project management handbook, Second edn. pp. 902-919. New York: Van Nostrand Reinhold] Bommer, William H., Johnson, Jonathan L., Rich, Gregory A., Podsakoff, Philip M. and MacKenzie, Scott B. 1995. On the interchangeability of objective and subjective measures of employee performance: a meta-analysis. Personnel Psychology 48 (3):587-606. Boyatzis, Richard. E. 1982. The Competent Manager: a model for effective performance. New York: John Wiley and Sons. Burgoyne, John G. 1993. The competence movement: Issues, stakeholders and prospects. Personnel Review. 22 (6):6-13. Campbell, J P. 1990. Modeling the performance prediction problem in industrial and organizational psychology. 2nd edn, 1. Palo Alto, California: Consulting Psychologists Press. Clarke, Angela. 1995. The key success factors in project management. Proceedings of a Teaching Company Seminar. London: The Teaching Company Clarke, Angela .1999. A practical use of key success factors to improve the effectiveness of project management. International Journal of Project Management 17 (3):139-145. Cleland, David I. and King, William R. 1988. Project management handbook, Second edn. New York: Van Nostrand Reinhold. Cockerill, Tony. 1989. Managerial Competencies as a Determinant of Organizational Performance. London University. Dewhirst, Dudley .1996. Needed: A new model for training project managers. PM Network November 25- 27. Dinsmore, Paul C. 1993. The AMA handbook of project management, New York: AMACOM. Duncan, William R. 1996. A Guide to the Project Management Body of Knowledge. Upper Darby, PA: PMI Publications. Einsiedel, Albert A. 1987. Profile of Effective Project Managers. Project Management Journal XVII (5):51- 56. Engwall, Mats and Kallqvist, Anna S. 1999. The Multiproject Matrix: A Neglected Phenomenon. In:

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

Crawford, Lynn and Clarke, Cecelia F., (Eds.) IRNOP IV Conference - Paradoxes of Project Collaboration in the Global Economy: Interdependence, Complexity and Ambiguity, Sydney, Australia: University of Technology, Sydney Ford, Robert C. and McLaughlin, Frank S. 1992. 10 questions and answers on managing MIS projects. Project Management Journal XXIII (3):21-28. Freeman, Mark and Beale, Peter .1992. Measuring project success. Project Management Journal XXIII (1):8- 17. Gaddis, P O. 1959. The project manager. Harvard Business Review 37 (3):89-97. Gadeken, Owen. C. and Cullen, B. J. 1990. A Competency Model of Project Managers in the DOD Acquisition Process. Defense Systems Management College. Gadeken, Owen. C. 1991. Competencies of Project Managers in the MOD Procurement Executive. Royal Military College of Science. Geddes, M .1990. Project leadership and the involvement of users in IT projects. International Journal of Project Management 8 (4):214-216. Gemmill, Gary R. 1974. The effectiveness of different power styles of project managers in gaining project support. Project Management Quarterly 5 (1): Gonczi, A, Hager, P and Oliver, L, (Eds.) 1990 Establishing competency standards in the professions Canberra: Australian Government Publishing Service. Heywood, L, Gonczi, A and Hager, P . 1992. A Guide to Development of Competency Standards for Professions. Canberra: Australian Government Publishing Service. IPMA . 1999. ICB: IPMA Competence Baseline. Caupin, G, Knopfel, H, Morris, P, Motzel, E and Pannenbacker, O, (Eds.) Germany: International Project Management Association. Jiang, James J., Klein, Gary and Balloun, Joseph .1996. Ranking of system implementation success factors. Project Management Journal XXVII (4):49-53. Kerzner, Harold . 1998. Project management: a systems approach to planning, scheduling and controlling, Second edn. USA: van Nostrand Reinhold. Lechler, Thomas . 1998. When it comes to project management, it's the people that matter: an empirical analysis of project management in Germany. In: Hartman, Francis, Jergeas, George and Thomas, Janice, (Eds.) IRNOP III - The nature and role of projects in the next 20 years: research issues and problems , pp. pp. 205-215. Calgary: Project Management Specialization, University of Calgary MCI . 1997. Manage Projects: Management Standards - Key Role G, London: Management Charter Initiative. Meredith, Jack R. and Mantel, Samuel J. Jr. 1995. Project management: a managerial approach, Third edn. New York: John Wiley & Sons, Inc. Morris, Peter W. G. 2000. Benchmarking project management bodies of knowledge. In: Crawford, Lynn and Clarke, Cecelia F., (Eds.) IRNOP IV Conference - Paradoxes of Project Collaboration in the Global Economy: Interdependence, Complexity and Ambiguity, Sydney, Australia: University of Technology, Sydney Murphy, David C., Baker, Bruce N. and Fisher, Dalmar . 1974. Determinants of project success, Boston: Boston College, National Aeronautics and Space Administration. Nathan, B R. and Alexander, R A. 1988. A comparison of criteria for test validation: a meta-analytic investigation. Personnel Psychology 41 517-535. OSCEng . 1996. OSCEng Level 4. NVQ/SVQ in Project Controls. England: Occupational Standards Council for Engineering. OSCEng . 1997. OSCEng Levels 4 and 5: NVQ/SVQ in (generic) project management. Occupational Standards Council for Engineering. Pettersen, Normand .1991. Selecting project managers: An integrated list of predictors. Project Management Journal XXII (2):21-25. Pinto, Jeffrey K. and Slevin, Denis P. 1987. Critical factors in successful project implementation. IEEE Transactions on Engineering Management EM-34 (1):22-27. Pinto, Jeffrey K. and Slevin, Denis P. 1988. Project Success: Definitions and Measurement Techniques. Project Management Journal XIX (1):67-72. I have a hard copy of this article. Pinto, Jeffrey K. 1998. The Project Management Institute Project Management Handbook, San

Reference details for this paper are as follows: Crawford, Lynn (2000) Profiling the Competent Project Manager. In: Project Management Research at

the Turn of the Millenium: Proceedings of PMI Research Conference, 21 - 24 June, 2000, Paris, France, pp. 3-15. Sylva, NC: Project Management Institute

Francisco: Jossey-Bass Publishers. Posner, Barry Z. 1987. What it takes to be a good project manager. Project Management Journal March 51- 54. Project Management Institute. 1999. PMI's A Guide to the Project Management Body of Knowledge (PMBOK® Guide ) Approved by ANSI as an American National Standard [Web Page]. Available at http://www.pmi.org/news/releases/pmbok.htm. (Accessed 13th April 2000). Schroder, Harold M. 1989. Managerial competence: the key to excellence. Iowa: Kendall Hunt. Shenhar, Aaron J., Levy, Ofer and Dvir, Dov .1997. Mapping the dimensions of project success. Project Management Journal 28 (2):5-13. Slevin, Denis P. and Pinto, Jeffrey K. 1986. The project implementation profile: new tool for project managers. Project Management Journal XVII (4):57-70. Thamhain, Hans J. and Wilemon, David .1977. Leadership effectiveness in program management. Project Management Quarterly (June):25-31. Thamhain, Hans J. 1991. Developing project management skills. Project Management Journal XXII (3):39- 44. Thamhain, Hans J. and Gemmill, Gary R. 1974. Influence styles of project managers: some project performance correlates. Academy of Management Journal 17 (2):216-224. Thamhain, Hans J and Wilemon, David L. 1978. Skill requirements of engineering program managers. Convention Record, 26th Joint Engineering Management Conference. The Standish Group. 2000. Chaos [Web Page]. Available at http://www.standishgroup.com/chaos.html. (Accessed 19th February 2000). Turner, J R. 1993. The Handbook of Project-Based Management. Maidenhead: McGraw-Hill. Turner, J R. and Keegan, Anne .2000. The management of operations in the project-based organization. Journal of Change Management Submitted for publication Wateridge, J.F. 1996. Delivering successful IS/IT projects: eight key elements from success criteria to review via appropriate management, methodologies and teams. Henley Management College, Brunel University. Henley Management College Library. Whittaker, Brenda .1999. What went wrong? Unsuccessful information technology projects. Information Management & Computer Security 7 (1):23-29. Zimmerer, Thomas W. and Yasin, Mahmoud M. 1998. A leadership profile of American project managers. Project Management Journal 29 (1):31-38.

  • Introduction
  • Project Success Criteria
  • Project Success Factors
  • Project Manager Competence
                  • Project Management Standards
  • Research Methodology
          • Totals
              • Industry Sector of Organisation
                • Total
          • Project Management Knowledge as a predictor of perceived effective performance
          • Project Management Practices as a predictor of perceived effective performance
          • Analysis at Unit Level