bluebenu market expansion
Product development 1:1 meeting DTC
3. September 2019
Product roadmap
2018 2019 2021 2021 2022
We are doing the tests in a lab scale and studying the plastic sample (raw materials) behaviours.
X
Product roadmap / Stage Gate
20192018 We are in between two phases since we want to co develop to achieve an optimal -product market fit.
Product life cycle
The gases will be recirculated in the process.
The subproducts can be sold or used.
The crude oil can be refined into fuel (diesel, gasoline…)
and we can get monomers & polymers and make new
plastic.
We receive the plastic waste in our facilities
The plastic will be grinded and will enter the process. In the process we will get:
crude oil, gases & subproducts (example :
bitumen)
BlueBenu
This product life cycle is focused on the plastic to plastic approach.
Concept description Pyrolysis/ current methods
HTL Our uniqueness
● we can process mixed types of plastic unlike other methodologies
● cut the costs & time on sorting materials ● more supply opportunities / bigger impact ●
1 Mixed plastic types
● we can process contaminated plastics from the open environment or from hospitals
● we can also process plastics that are in degradation state due to weather or other factor
2 Contaminated plastic waste
● freedom to be deployed in small villages ● less negative environmental & social impact ● more opportunities (marit
3 Container size machine
Product / Process description (for optimal lab scale)
Product concept (experience through partners)
Feedstock and water
IP from our partners in Italy (it is design for biomass)
Product concept
Modular Reactor & Pre-heater
Product Decanting Tank
Oil Water Separator
Feeding System & Mixing Unit
Rear of Control Panel
Recirculating Water Tank Safety Discharge
Pumping System
Requirement specification (general)
Right temperature & pressure
Temperature & pressure need to be controlled during the whole process since they are crucial for the process to happen.
Also the pre-heating system needs to be fully functional for the process to work.
No metals or minerals in the process
Metals & minerals can cause interference in the process.
Some metals like aluminium can be accepted as a catalyst.
Plastic size
The plastics need to be around 0,5 millimeter to 1 millimeter. Bigger particles might clog the reactor and valvules which will cause the process to be stopped.
Requirement specification (especifics) - The storage area will accept the waste plastic delivered to the facility, if the plastic does not meet the
quality requirements a first pretreatment of bulk grinding to achieve metal separation is performed. - The feed needs to be fine ground to powder prior loading into the reactor. - If the reactor has been idle a start procedure is needed followed by system health check up:
pressure control stable, temperature requirements met throughout the reactor, pumping system delivering expected fluxes; when all subsystems of the reactor prove to be functional loading of the feed follows.
- The plastic powder is fed to the mixing unit which mixes vigorously the powder (30%w/w) and water (70%w/w) to produce a relatively homogeneous suspension (slurry) which can be pumped into the system between 280-320 atm.
- The slurry is heat up to 90C and mixed with preheated supercritical water (500C) while entering the main heating unit
- After reaction follows discharge, water recirculation and flammable gas recirculation, product collection.
BoM (bill of materials) for the first lab scale prototype Budgetpost Specification Amount Prototyping equipment
(from Aliexpress)
HEQI GlASS 25ml Digestion high-pressure tank &Hydrothermal Synthesis Autoclave Reactor
1,367.00
HEQI GlASS 50ml Hydrothermal synthesis Autoclave Reactor Digestion high-pressure tank
1,475.00
SKU574365 2x Long Heavy Duty Double Reinforced Welding Gauntlets Welder Gloves Safety Gloves
128.00
BINYEAE 2x Anti-acid and alkali chemical corrosion latex rubber gloves
185.00
M3 4x Welding Helmet Face Shield Anti-shock
315.00
Prototyping equipment
(from Amazon)
TB-621-20 Blendtec Total Classic Original Blender
1,132.00
Simulation & 3D modeling component (from Elgiganten)
Nvidia MSI GeForce GTX 1070 Armor 8G OC Edition
3,540.00
Controllers & Data Analysis (from National Instruments)
783729-01 NI 9209 with Dsub - NI 9209 +/- 10V Analog Input, 500 S/s, 16Ch Module
4,905.00
781503-01 NI 9923 Front-mount D-SUB to screw terminals - NI 9923 Front-mount terminal block for 37-pin D-Sub Modules
1,056.00
783906-01NI 9482 with Spring Terminals - NI-9482 C Series Relay Output Module, 4-Ch SPST, 30/60 VDC, 250 VAC, Spring Terminal
1,397.00
781157-01 cDAQ-9174 - cDAQ-9174, CompactDAQ chassis (4 slot USB)
7,025.00
781094-01 PS-16, 10Amp, 24VDC - NI PS-16 Power Supply, 24 VDC, 10 A, 100-120/200-240 VAC Input
2,045.00 Total expenses
24,570.00 Max 25.000 kr. Amount requested