1. Ignore the questions at the end of the sequencing problem.
2. Based on your ID, use the sequence of Jobs listed to develop a finite horizontal schedule/load. Determine the profit and/or loss.
3. Develop a second job sequence that is different from the one developed in 2 above, that provides a greater profit/smaller loss.
4. Turn in a PDF or Word file consisting of 2 pages, with one of your sequences, with profit/loss, per page. No excel files or picture files will be accepted for grading.