Statistics
PMO201 Project Management Group Project – Final Report
1
PROJECT MANAGEMENT PLAN
You and your assigned group of colleagues are to evaluate the project proposals you all have
submitted in assignment 1 and select / accept one (1) to use to initiate assignment 2. The next
step is to develop a project management plan as described in this document.
Submission Details
Word Count Maximum 10,000 words (excluding Appendix and Table of Contents) Minimum official is 8,000
Value This assignment is worth 25% (22.5% the report, 2.5% the milestones) of your total grade.
Due Date Friday, Week 11, 5 PM (Darwin time)
Format and delivery
Your submission needs to be professionally presented using the following format:
• A single PDF or Word document
• Attachments will not be marked.
• Embedded links will not be accepted.
• Only one submission per group.
• In the header/footer of each page, include the following: • Page number
• Group number
• Group members’ surnames & student numbers
• (Ex: Group X: Hetfield -123456, James - 654321, etc.)
• Line spacing at 1.5 • 2cm margins
• Font size 12 Arial
.
PMO201 Project Management Group Project – Final Report
2
Use the following structure for your report with sub-headings as appropriate:
1. Title Page a. Project name
b. Group details presented in a table with names and student numbers
2. Table of Contents Page a. Beside each sub-heading, write the name of each person that was the lead for that section.
E.g. Selection – James Barnes, Paul Kelly.
b. Include listing for graphs, charts, pictures, etc.
3. Executive Summary, with:
a. Project Justification – why the project is necessary. b. Project Aim – what the project sets out to achieve.
c. Project Scope – inclusions, exclusions, constraints, assumptions, and key deliverables of the
project.
4. Background
a. Describe the need (i.e. issue, problem, market gap, etc.) the project is set to address.
• Provide sufficient detail to prove that the project is not misguided (i.e. recognise
project’s constraints and context).
b. Describe how and why existing or similar approaches, products, technologies and/or
projects might be applicable and/or relevant to your project.
• Use a table to indicate how these projects are similar.
5. Evaluation of Alternatives (Note: Depending on what alternatives were considered, it may make more sense to include this section before, within, or after the ‘Project Concept’ section.
This is up to you.)
a. Briefly describe the alternative projects that were presented for evaluation (your group’s
weighted scoring model that you complete to choose this project).
b. Briefly explain and justify the criteria, rankings, weightings, and rating schemes used in
developing the Project Selection Matrix.
c. Present the final Project Selection Matrix developed for the evaluation.
d. Provide a summary and analysis of the outcome.
6. Project Concept
a. Describe the project. Include whatever pictures, sketches and/or drawings that you think
best convey the project concept. Start with an overview and then discuss the various
aspects and components in more detail.
b. Project objectives
c. Project requirements and deliverables
PMO201 Project Management Group Project – Final Report
3
7. Project Feasibility
a. Discuss how the project is desirable, viable and achievable, and identity key areas of
strength and weakness.
b. Approval requirements
c. Project assumptions (Identify at least 5 assumptions.)
d. Known constraints (Identify at least 5 constraints.)
e. Expected benefits and dis-benefits (Identify at least 5)
f. Investment Appraisal
8. Product Breakdown Structure, Organization & Communication Management a. Demonstrate the project management structure using an organogram.
b. Describe the various roles and identify responsibilities associated with each role. Also specify
team members assigned to each role, outlining their key attributes which indicate their
capacity and ability to perform roles and responsibilities assigned to them.
c. Outline the Project Product Breakdown Structure (PBS)
d. Develop a comprehensive project plan addressing the following Plan description:
• Plan prerequisites – Any fundamental aspects that must be in place and remain in
place for the plan to succeed
• External dependencies – External factors that may influence the plan
• Planning assumptions – Assumptions upon which the plan is developed
• Lessons incorporated – Details of any lessons from previous similar projects which
have been reviewed and accommodated within this plan
• Monitoring and control – Details of how the plan will be monitored and controlled
• Budgets – Covering time and cost, including provisions for risks and changes
• Tolerances – Time, cost and scope tolerances
• Product descriptions – Covering products within the scope of the plan
• Schedule – Which may be graphical representations of
a. Gantt or bar chart
b. Activity network
e. Develop a communication Management Approach
9. Project Quality Management a. Based on the PBS above, develop product descriptions for the applicable products of your
project.
b. For the applicable project products described above, outline relevant quality control activities
necessary to ensure that their product quality criteria are met.
c. Clearly present a report format for recording quality control activities undertaken as part of
your project. Describe any applicable roles and responsibilities.
d. Present one of the Seven Basic Tools of Quality that you have learned during the lecture for
your project.
10. Project Risk Management
a. Provide Risk Management Approach
b. Provide the risk matrix – Probability/Impact matrix
PMO201 Project Management Group Project – Final Report
4
c. Present a risk management procedure for your project
d. Provide risk responses to threats and opportunities
11. Change and Issue Management a. List all the issues related to your project
b. Where any of the project products delivered has failed to meet acceptance criteria or a change
request has been received with the potential of impacting on project’s product and therefore
implies additional work, clearly outline the change management process and change authority
developed for your project.
c. Outline how you track and control the configuration items for your project.
12. Project Progress Control a. What are the different project control mechanisms adopted for the project you are undertaking?
b. Clearly outline allowable project tolerances for time, cost, quality, benefit, scope, and risk at
the different levels of management.
c. Demonstrate project plan split into different stage plans to enable control.
13. Conclusion
14. References
a. CDU Harvard method or APA, with correct formatting refer to:
b. https://libguides.cdu.edu.au/cdureferencing/harvard or
http://www.cdu.edu.au/library/downloads/pdf/CDUHarvardReferencing.pdf
15. Appendices
a. You could include analysis, calculation, templates, etc. as Appendix.
- PROJECT MANAGEMENT PLAN
- Submission Details
- 1. Title Page
- 2. Table of Contents Page
- 14. References
- 15. Appendices