Due Date: Sunday by 11:59pm Total Points: 100 Instructions: Review the Control Account information, and determine the current status for each of the work packages listed. Calculate the SV, CV, SPI, CPI, EAC, VAC, and TCPI for each of the following work packages:

Work Package EV Techniq

ue

PV or BCWS

EV or BCWP

AC or ACWP

CV SV SPI EAC VAC TCPI

1.1.1.1.1. Hull – Order Raw Steel

50/50 $310 m $155 m $155 m

1.1.1.1.2. Hull – Order Polymer Material

50/50 $9 m $4.5 m $1m

1.2.1. Final Certified Bow Redesign

% complet

e

$4 m $3.7 m $4.1 m

1.2.2.1 Systems Engineering Planning– PMB Development

0/100 $ 1.2 m $1.2 m $1 mil

1.3.2. Project Management Planning – PMB development

0/100 $.5 m $.5 m $.3 m

PMG640 – Project Scheduling and Cost Planning

Unit 7 Assignment: PMB

Requirements:

 Use this MS Word file to complete your assignment and submit via Blackboard.

 Save your files using the following filename convention:

o PMB – FirstName_LastName

Be sure to read the criteria, by which your paper/project will be evaluated, before you write, and again after you write.

Evaluation Rubric for Unit 7: PMB Assignment

CRITERIA Deficient

Needs

Improvement Proficient

Exemplary

0 – 59 Points 60 – 79 Points 80 – 99 Points 100 Points

Number of Correct Values Calculated

Less than 17

correct values

calculated.

18 to 23 correct

values calculated.

24 to 29 correct

values

calculated.

30 correct values calculated.